indonesia’s future education needs and pc based simulators

21

Upload: herve

Post on 11-Jan-2016

29 views

Category:

Documents


0 download

DESCRIPTION

INDONESIA’S FUTURE EDUCATION NEEDS AND PC BASED SIMULATORS. Fatmuanis Basuki. Meeting of effective Utilization on NPP Simulator Vienna, 19 – 22 May 2014. Outline. Introduction. NPP program in Indonesia Education and Training in Nuclear Field - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS
Page 2: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

▪ Introduction

• NPP program in Indonesia • Education and Training in Nuclear Field• Implementation Fundamental Training

for NPP (Reactor engineering and Safety and IAEA Simulator)

• Training Schema for Reactor Operator and Simulator Training

▪ Conclusion

2

Page 3: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Introduction Indonesia has been considering introducing

NPP option into energy mix supply for 2000 MW to be operated in around 2024 or NP Demontration operated on 2020

Although definite timetable has not been determined, the development of basic infrastructure of NPP preparation which is included HRD has to be initiated.

ETC-BATAN are responsible for the development of HRD program for NPP

3

Page 4: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Nuclear Infrastructure Development Program

Phase 1

Consideration before a decision

to launch a nuclear power programme is

taken

Phase 2

Preparatory work for the

construction of a NPP after a

policy decision has been taken

Phase 3

Activities to implement a first

NPP

Phase 4

Maintenance and continuous

infrastructure improvement

Pre Project Project Decision Making

Construction Operation/ decommissioning

Nulear power option

included within the national energy

strategy

Nulear power option

included within the national energy

strategy

Milestone 1Ready to make a knowledgeable commitment to a nuclear programme

Milestone 2Ready to invite bids for the first NPP

Milestone 3Ready to commission and operate the first NPP

20062006 2019-2024

2019-2024

12 -18 years

Pres.Reg. 5/2006 Act. 17/2007

Feasibility study Bidding process Commissioning

Infr

ast

ruct

ure

D

evelo

pm

ent

Pro

gra

m

4

Page 5: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

INPP Roadmap

Timeline for NP Development in Indonesia

5

Page 6: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Training schedule for Key personnel Training schedule for Key personnel of NPPof NPP

Witness during Construction

Mech., IC, E, Water Chem, Reactor. Rad Protec. And

Env, QASafety Analysis

Maintenance

Operation

Nuclear Fuel

Org

. U

tility

-10-12 -8 -5 -3 -1-2 0

Proj

ect I

mpl

emen

tasi

on

Cons

truc

tion

Com

issi

onin

g

Civi

l and

foun

datio

n

Sub.

Sys

tem

tes

t

Com

mer

cial

Ope

ratio

n

1412 16 19 21 2322 24

Training staff and NTC

Plant Specification

Plant operation Management

Operation manager

Civil and Structure6

Page 7: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Timeline for NP Demontration Development

Phase1 :Pre ProjectPhase II:Enginering, procurement and ConstructionPhaseIII: Comissioning and OperationPhaseIV: Research on cogeneration

Page 8: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

04/21/23 8

Page 9: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

EDUCATION and TRAINING IN NUCLEAR FIELD

Page 10: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

NUCLEAR TRAINING CENTER

Page 11: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

October 9 Education and Traing center - BATAN 11

Implementation of Fundamental Course for NPP

ETC-BATAN has been implementing TC on Reactor Engineering and Safety I and II (Basic course of an initial training for preparation of NPP HRD program) IAEA simulator are used on RES I

LectureSlide

Curiculla RE 1 Curiculla RE II

Page 12: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS
Page 13: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

G.A. SIWABESSY REACTOR, SERPONGG.A. SIWABESSY REACTOR, SERPONG Oper. since : 1987Power : 30 MWFunction : Research, isotope prod. and testing

Hot Cell

Page 14: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Working Area in NPP

Training Schema for NPP Personnel

14

Page 15: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

New Employee

Basic

Competency Assessm

entCertification/Licensing/

Competent personnel

Engineer (Nuclear Island/BOP)

Technician (nuclear Island /BOP)

Training and Certification Training and Certification

15

Page 16: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Introductory Training for New Employee

New

Employee

Month0 3 6 9 12

TC Administratif

TC Industrial safety and Radiation Protection

TC Fundamental of N

PP

OJT Basic Com

ponent Know

ledge and machinary

Arrangement

OJT on Plant Sytem

and Com

ponent

NPP system

and comp

description and location16

Page 17: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Thermal hydraulics

Detail Training Schema for Operator

New

Employee

Introductory, Administrative, Industrial safety,

Radiation Protection, Introduction to NPP and

Familiarization w

ith NPP

Reactor Physics

Preparation for license Op

TC on Plant Sys. and Com

ponent

Month12Reactor safety

0

8 wkPlant and control sys. and

component

Simulator 8 wk

24

OJT on Turbine G

en

OJT on N

SSS Secondary

OJT on N

SSS Primary

OJT Shift in control rooms

Phase 1 Phase 2 Phase 3

License Operator

Non license O

ps

OJT on Auxiliary

8wk

36O

JT on Auxiliary

OJT on TG

OJT on N

SSS secondary.

OJT on N

SSS Prim

ary.

42 wk

OJT on Shift Aux Patroller

50 wk 50 wk

OJT on Shift TG Patroller

Operator TG

Operator Aux

OJT Aux Op.

OJT TG Op

Aux/ equipment O

p.

60

OJT aux/TG/NSSS/ their specialties

50 wk

Simulator

OJT NSSS

Other TC

8 wk

17

Page 18: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Curriculla and Syllabus for Curriculla and Syllabus for Simulator TrainingSimulator Training

Page 19: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Indonesia has been considering introducing NPP option into energy mix supply for 2000 MW to be operated in around 2024 In order to prepare Indonesian Nuclear HRD who has appropriate qualification personnel requirement, the education and training need to be identified, training program and curricula must be developed. The Nuclear Training Center for NPP must be equipped with Simulator (Fullscope or PC Based Simulator)Development and Utilization of Simulator are urgent to supprot NPP HRD program in indonesia

19

Page 20: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

20

Page 21: INDONESIA’S FUTURE EDUCATION NEEDS  AND PC BASED SIMULATORS

Bangka