Indiana Harbor and Canal Confined Disposal Facility 2011 Technology Conference East Chicago, Indiana
16 November 2011
![Page 2: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/2.jpg)
BUILDING STRONG®
Topics
Construction Overview Facility Operations/Dredging Contract CDF Dam Safety CDF Groundwater Gradient Control Air Monitoring Update
![Page 3: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/3.jpg)
BUILDING STRONG®
Indiana Harbor & Canal Federal Navigation project in East
Chicago, Indiana Identified as an Area of Concern under the
Great Lakes Water Quality Agreement of 1978 CDF has 4.8 Million CY Capacity—1.8
Million CY of this is Backlog Dredging, Remainder is future Maintenance Dredging Not dredged since 1972 due to a lack of
suitable disposal facility for sediment
![Page 4: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/4.jpg)
BUILDING STRONG®
ECI Site Background
Petroleum products refinery from 1918 to 1981. Produced propane, leaded and unleaded
gasoline, fuel oil, kerosene, grease, oils, asphalt, paraffin wax, phenols, sulfur, and insecticides.
![Page 5: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/5.jpg)
BUILDING STRONG®
ECI Site Background
In 1981 the owner Energy Cooperative Incorporated (ECI), filed for bankruptcy. In the late 1980’s, by court order, all
buildings and above ground structures were razed. Clean topsoil covered the site. In 1989, the City of East Chicago became
the owners for back taxes owed by ECI.
![Page 6: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/6.jpg)
BUILDING STRONG®
IHC CDF Site in the mid 1900’s – an active refinery
N
![Page 7: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/7.jpg)
BUILDING STRONG®
Indiana Harbor CDF
Layout consists of two cells within clay dikes. Space on the south end for support facilities.
West
Cell
East
Cell
![Page 8: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/8.jpg)
BUILDING STRONG®
Previously Completed Construction Contracts
Obstructions Removal –Pipe Removal in the Lake George Canal Slurry Wall – 30 ft depth around 3 sides of
the site. Phase I and II Dikes – Perimeter Dike
System South Cutoff Wall – Steel Sheet Pile Wall
installed in the canal. Sheets vary from 50’ - 75’ in length.
![Page 9: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/9.jpg)
BUILDING STRONG®
Recently Constructed: Phase III Dikes
Constructed a 1630' long exterior clay dike to enclose the CDF to current height (21') Constructed an interior dike to create 2
disposal cells Constructed two decant structures to
dewater the CDF Installed an access road on top of the
exterior dike
![Page 10: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/10.jpg)
BUILDING STRONG®
![Page 11: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/11.jpg)
BUILDING STRONG®
![Page 12: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/12.jpg)
BUILDING STRONG®
![Page 13: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/13.jpg)
BUILDING STRONG®
![Page 14: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/14.jpg)
BUILDING STRONG®
Recently Constructed: South End Features
Construction included site security Administrative building Maintenance and Storage Facilities Parking Lot, Access Roads Decontamination Station Water main, sanitary tank, storm sewer
installation.
![Page 15: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/15.jpg)
BUILDING STRONG®
![Page 16: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/16.jpg)
BUILDING STRONG®
![Page 17: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/17.jpg)
BUILDING STRONG®
Administrative Building/Garage
![Page 18: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/18.jpg)
BUILDING STRONG®
IHC Facility Operations and Dredging
Contract was awarded on September 30, 2011 Joint Venture between Kokosing
(Durocher Marine) and O’Brien & Gere. Currently doing administrative start-up.
Onsite activities anticipated in Spring 2012
![Page 19: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/19.jpg)
BUILDING STRONG®
Contract consists of:
Dredging up to 400,000 CY/year based on funding. Operation of the Gradient Control System Site maintenance Water Treatment Air Monitoring Project website for reporting air and
dredging activities
![Page 20: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/20.jpg)
BUILDING STRONG®
Dredging and Placement Mechanical dredging with environmental
bucket ►Turbidity monitoring up and downstream ►Oil booms around dredging operation
Hydraulic off-loading with water recirculation from the CDF ►Real time air monitoring, dockface air
monitoring ►Emissions controls at the CDF as needed
![Page 21: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/21.jpg)
BUILDING STRONG®
Mechanical Dredging
![Page 22: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/22.jpg)
BUILDING STRONG®
Hydraulic off-loading
![Page 23: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/23.jpg)
BUILDING STRONG®
IHC CDF Operation
Ponded CDF (not dewatered during dredging seasons) ►Reduces volatile emissions ►Eliminates particulate emissions ►Improves quality of water in CDF ►Reduces amount of water to be treated
![Page 24: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/24.jpg)
BUILDING STRONG®
Tentative Schedule First dredging event in summer 2012
Each dredging event may be 2 – 6 months
depending on funding Year round activities at site: water
treatment, air monitoring, gradient operation
![Page 25: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/25.jpg)
BUILDING STRONG®
Technology Issues Update
![Page 26: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/26.jpg)
BUILDING STRONG®
Dam Safety Overview USACE oversees over 650 dams nationwide The USACE Dam Safety Program ensures all
dams are designed, constructed, and operated safely and effectively under all conditions
USACE works with a variety of federal, state, and private dam safety officials to build and maintain the Dam Safety Program
Emphasizes training local personnel on the issues specific to their dam
This holds the CDF accountable to stringent inspection and operational standards
![Page 27: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/27.jpg)
BUILDING STRONG®
On Site Dam Safety Activities at CDF
Weekly Inspections by Contract Personnel Monthly Analysis of Project
Instrumentation Annual Inspections by USACE Personnel Communication Plans Site Training
![Page 28: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/28.jpg)
BUILDING STRONG®
Dam Safety Communication
Communication plans should an emergency occur ►Emergency Action Plan – an internal
notification plan to quickly transmit information from the site to USACE officials
►Coordinated with local emergency responders (East Chicago EM, Police, & Fire Dept.)
►Practiced internally so all on site personnel are familiar with emergency procedures
![Page 29: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/29.jpg)
BUILDING STRONG®
Preventing/Controlling an Environmental Emergency
• Regular inspections of CDF condition • Frequent monitoring and surveillance of
instrumentation • Staff training • Controlled inflow of water • 2 cells provide easier water management • Ditches on surface drain water towards
the canal • Cline Ave support wall prevents flow to
north • Site topography would direct water to the
south
Cline Ave
![Page 30: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/30.jpg)
BUILDING STRONG®
CDF Groundwater Gradient Control
![Page 31: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/31.jpg)
BUILDING STRONG®
Gradient Control System The Gradient Control System
is a mechanical system to draw groundwater to the CDF
System of wells, pumps, and piping all below ground surface
Required to keep groundwater on site 2 feet below groundwater off site to contain existing contamination
![Page 32: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/32.jpg)
BUILDING STRONG®
How the Gradient System Works
Step 1- Trap Groundwater on Site
Step 2- Pump Water from Wells
Step 3- Monitor Water Levels
Groundwater Monitors
![Page 33: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/33.jpg)
BUILDING STRONG®
Where does Groundwater Go?
Wells direct water into pipes around the site The pipes lead to two large pump stations The pump stations pump water to a
treatment facility on site The treatment facility treats the water and
releases it in the canal
![Page 34: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/34.jpg)
BUILDING STRONG®
What do the groundwater levels look like now
![Page 35: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/35.jpg)
BUILDING STRONG®
Gradient Control Statics
Working since June 2010 to lower groundwater 144 million gallons of groundwater
pumped and treated from June 2010 – September 2011 Average daily pump rate is 160 gpm
![Page 36: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/36.jpg)
BUILDING STRONG®
Air Monitoring Update
![Page 37: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/37.jpg)
BUILDING STRONG®
Ambient Air monitoring Was 2 locations (south side and high school) Going back to 5 locations:
• All four sides of CDF, on top of dikes • High school (same location)
Same monitoring parameters: volatile compounds, particulates, metals, semi-volatile compounds
Data still to be posted on Argonne website: https://web.ead.anl.gov/inharbor/data/analysis/publicTables/index.cfm?po
p=1
Or access through project website: http://www.lrc.usace.army.mil/projects/IN_harbor_canal_CDF/index.html
![Page 38: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/38.jpg)
BUILDING STRONG®
Ambient Air Monitoring Station
![Page 39: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/39.jpg)
BUILDING STRONG®
New Air Monitoring Activities Real Time Air Monitoring
►Purpose is to determine what is emitted from the CDF, and what controls are needed
►Naphthalene (surrogate for all volatile compounds)
►Particulates ►Data will be posted on a website (in
development) ►Anticipated to start in the spring (will start prior
to dredging)
![Page 40: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/40.jpg)
BUILDING STRONG®
New Air Monitoring, Continued Dock face monitoring using a Photo-
ionization detector (PID) ►Intended to determine if there is any impact
from barges parked along the south side of the site during sediment handling
►Will measure total volatile compounds (from all sources in the area)
►“Point” measurements (not continuous), measurements will be posted on website with real time measurements
![Page 41: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/41.jpg)
BUILDING STRONG®
Photo- ionization detector
(PID)
![Page 42: Indiana Harbor and Canal Confined Disposal Facility](https://reader031.vdocuments.us/reader031/viewer/2022012518/6192eed14936a125da682ac0/html5/thumbnails/42.jpg)
BUILDING STRONG®
Questions? Comments?
For More information, contact: Natalie Mills, Project Manager 312-846-5561 [email protected]