indiana department of transportation page 1 …...call 231 contract r -35485-a pavement replacement...
TRANSCRIPT
INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1
NOTICE TO HIGHWAY CONTRACTORS
DATE OF LETTING: January 19, 2017
TIME OF LETTING: 10:00 AM EASTERN STD
Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate
of Qualification issued by the Indiana Department of Transportation.
===================================================================================================================================
LOCATION OF DEPOSIT: Indiana Department of Transportation, Mr. John P. Wooden, Bid Review & Estimate Manager, Room N725,
Government Center North, 100 North Senate Avenue, Indianapolis, IN 46204-2217
LOCATION OF OPENING: All proposals will immediately thereafter be taken to the N725 Conf. Room, Government Center North,
100 N. Senate Avenue, Indianapolis, Indiana where they will be publicly opened and read.
===================================================================================================================================
Contract documents will be available on the Indiana Department of Transportation (INDOT) internet website at no cost and are
copywrite free. Contract documents may be viewed, reproduced, or downloaded at: http://erms.indot.in.gov/viewdocs/
Bids will be considered as provided for in the Prequalification and Bidding Regulations on file. Copies are available in Room N725,
Government Center North.
IMPLEMENTATION OF ELECTRONIC BIDDING
All contracts within this notice are designated for electronic bidding via Bid Express. Only electronic bids submitted via Bid
Express will be accepted on contracts designated for electronic bidding. for these contracts. It is the bidder's responsibility to
check the Bid Express website for all amendment files prior to the deadline which may not be communicated in a revision letter.
MANDATORY BIDDER REGISTRATION
Contractors desiring to submit electronic bids via Bid Express must register with INDOT as a valid bidder by submitting the form
provided by INDOT Customer Service at the website below. Failure to register will cause failure of the Bid Express bid submission
process. NOTICE: A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM Eastern STD on
the bid opening date.
BONDS
An executed bid bond and an executed performance bond shall be included with the bid, except on contracts for roadside mowing,
vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000
or less, the bidder may elect not to furnish a performance bond. Paper bid bonds will not be accepted. Only electronic bid bonds
submitted through the designated electronic medium, either Surety 2000 or SurePathNetwork, will be accepted with the bid. Bid
Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting
email inbox or be delivered on paper by the time set for receipt of proposal bids. Performance bonds must be on the form provided
by the Department and available online at http://www.in.gov/dot/div/contracts/letting/general/performancebond.pdf.
TITLE VI ASSURANCES
In accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000d-4 and Title 49, Code of Federal
Regulations, Department of Transportation, Sub Title A, Office of the Secretary, Part 21, Nondiscrimination in Federally assisted
programs of the Department of Transportation, the Indiana Department of Transportation assures minority business enterprises will
be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of
race, color, sex, age, national origin, religion, sexual orientation, gender identity, disability/handicap or income status in
consideration for an award.
INTERNET ADDRESS
For additional information, visit the Doing Business with INDOT - Contractors website at
http://www.in.gov/dot/div/contracts/letting/index.html
PAGE 1
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 111 CONTRACT R -30397-A PAVEMENT REPLACEMENT GREENFIELD DISTRICT PG. 1
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0013790 | 0013790 PAVEMENT REPLACEMENT
WAYNE COUNTY - ON US 40 FROM 3RD STREET TO 11TH STREET
(RP 145+0020 TO 146+0024)
0100701 | 0100701 PAVEMENT REPLACEMENT
WAYNE COUNTY - ON US 27 FROM SOUTH O STREET TO 0.16 MILE
NORTH OF SR 227 AT SIM HODGIN PARKWAY
1592393 | 159239300ST3 UTILITY RELOCATION
WAYNE COUNTY - ON US 27 AT US 40
(RP 020+0062 TO 022+0089)
COMPLETION DATE: November 30, 2018 DBE GOAL: 12.00 QUALIFICATIONS: A(A) C(A)
___________________________________________________________________________________________________________________________________
CALL 121 CONTRACT R -30480-A PAVEMENT REPLACEMENT SEYMOUR DISTRICT PG. 9
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0710605 | 0710605 PAVEMENT REPLACEMENT
OWEN COUNTY - ON SR 46 FROM SR 67 TO FAIRVIEW
(RP 037+0059 TO 037+0155)
COMPLETION DATE: June 30, 2019 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B) E(E)
___________________________________________________________________________________________________________________________________
CALL 141 CONTRACT R -33697-A ROAD RECONSTRUCTION CRAWFORDSVILLE DISTRICT PG. 15
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1005755 | 1005755 ROAD RECONSTRUCTION
TIPPECANOE COUNTY - ON RAILROAD STREET AT NORTH STREET,
JEWETT, TIPTON AND PROPHET.
1172413 | 1172413 ROAD RECONSTRUCTION
TIPPECANOE COUNTY - ON RAILROAD STREET AND NORTH STREET
COMPLETION DATE: September 30, 2017 DBE GOAL: 12.00 QUALIFICATIONS: C(B) E(F) 0165
PAGE 2
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 151 CONTRACT R -33974-A BRIDGE DECK OVERLAY, RC APPROACH REPLACEMENT, PIPE LINING LAPORTE DISTRICT PG. 17
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006743 | 1006743 BRIDGE DECK OVERLAY AND RC APPROACH REPLACEMENT, STR NO
I65-226-05411N, TWIN CONT RC, 3 SPANS, TOTAL LENGTH 94.8 LFT
JASPER COUNTY - ON I-65 OVER STOVER MAIN DITCH, 2.77 MILES
SOUTH OF SR 10 (RP 226+0079)
1006744 | 1006744 BRIDGE DECK OVERLAY AND RC APPROACH REPLACEMENT, STR NO
I65-226-05411S, TWIN CONT RC, 3 SPANS, TOTAL LENGTH 94.8 LFT
JASPER COUNTY - ON I-65 OVER STOVER DITCH, 2.77 MILES SOUTH
OF SR 10 (RP226+0079)
1172257 | 1172257 PIPE LINING
JASPER COUNTY - ON I-65, 2.15 MILES SOUTH OF SR 16
(RP 207+0020)
1172259 | 1172259 PIPE LINING
JASPER COUNTY - ON I-65, 3.15 MILES NORTH OF SR 14
(RP 223+0060)
1172260 | 1172260 PIPE LINING
JASPER COUNTY - ON I-65, 3.75 MILES NORTH OF SR 14
(RP 224+0020)
1172261 | 1172261 PIPE LINING
JASPER COUNTY - ON I-65, 1.01 MILES SOUTH OF SR 10
(RP 228+0055)
1172263 | 1172263 PIPE LINING
JASPER COUNTY - ON I-65, 0.41 MILE SOUTH OF SR 10
(RP 229+0015)
1296453 | 129645300ST4 PIPE LINING
LAKE COUNTY - ON I-65, 1.26 MILES NORTH OF SR 2
(RP 241+0020)
COMPLETION DATE: October 28, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B) D(A)
___________________________________________________________________________________________________________________________________
CALL 161 CONTRACT R -34057-A ASPHALT RESURFACE AND BRIDGE REHABILITATION LAPORTE DISTRICT PG. 20
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006666 | 1006666 ASPHALT RESURFACE
ST. JOSEPH COUNTY - ON US 20 FROM LAPORTE COUNTY LINE
TO US 20 (RP 060+0060 TO 070+0032)
1173892 | 1173892 BRIDGE REHABILITATION, 020-71-0220C, CONTINUOUS COMPOSITE
STEEL BEAM, 3 SPANS, TOTAL LENGTH 163 LFT
ST. JOSEPH COUNTY - ON US 20 OVER CONRAIL RR, 2.04 MILES
PAGE 3
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
EAST OF SR 23 (RP 078 + 0012)
1296507 | 129650700ST4 ASPHALT RESURFACE
ST. JOSEPH COUNTY - ON US 20 FROM US 31 TO US 31
(RP 070+0032 TO 078+0081)
COMPLETION DATE: November 10, 2017 DBE GOAL: 7.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 171 CONTRACT R -34146-A ROAD RECONSTRUCTION FT. WAYNE DISTRICT PG. 23
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0901973 | 0901973 ROAD RECONSTRUCTION
ALLEN COUNTY - ON CARROLL ROAD FROM PRESERVE BLVD TO
BETHEL ROAD IN THE TOWN OF HUNTERTOWN
COMPLETION DATE: October 31, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B)
___________________________________________________________________________________________________________________________________
CALL 181 CONTRACT R -35088-A SMALL STRUCTURE REPLACEMENT FT. WAYNE DISTRICT PG. 26
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296153 | 129615300ST2 SMALL STRUCTURE REPLACEMENT
DEKALB COUNTY - ON SR 101 OVER COBURN DITCH, 4.75 MILES
NORTH OF SR 37 (RP 075+0059)
COMPLETION DATE: July 31, 2017 DBE GOAL: 14.00 QUALIFICATIONS: C(B) E(E)
___________________________________________________________________________________________________________________________________
CALL 191 CONTRACT R -35089-A SMALL STRUCTURE REPLACEMENT FT. WAYNE DISTRICT PG. 28
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296154 | 129615400ST2 SMALL STRUCTURE REPLACEMENT
WHITLEY COUNTY - ON SR 205 OVER WOLF ROAD DRAIN, 6.18 MILES
EAST OF SR 5 (RP 0006+0018)
COMPLETION DATE: June 19, 2017 DBE GOAL: 14.00 QUALIFICATIONS: C(B) E(E)
PAGE 4
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 201 CONTRACT R -35292-A ROAD RECONSTRUCTION CRAWFORDSVILLE DISTRICT PG. 29
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1297551 | 129755100LC1 ROAD RECONSTRUCTION
FOUNTAIN COUNTY - ON SYCAMORE STREET FROM PERRY STREET TO
US 41 IN THE TOWN OF ATTICA
COMPLETION DATE: November 16, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B) E(E)
___________________________________________________________________________________________________________________________________
CALL 211 CONTRACT R -35447-A SMALL STRUCTURE REPLACEMENT GREENFIELD DISTRICT PG. 32
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296745 | 129674500ST3 SMALL STRUCTURE REPLACEMENT
HAMILTON COUNTY - ON SR 37 OVER WHITE RIVER, 3.19 MILES
NORTH OF I-69 (RP 172+0046)
COMPLETION DATE: September 29, 2017 DBE GOAL: 10.00 QUALIFICATIONS: B(A) C(B) E(E)
___________________________________________________________________________________________________________________________________
CALL 221 CONTRACT R -35459-A AUXILIARY LANE CONSTRUCTION AND BRIDGE PAINTING GREENFIELD DISTRICT PG. 34
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1173697 | 1173697 AUXILIARY LANE CONSTRUCTION
MARION COUNTY - ON I-70E FROM FRANKLIN WAY OVERPASS TO
POST ROAD (RP 089+0082 TO 090+0071)
1296587 | 129658700ST3 BRIDGE PAINTING, STR NO I70-086-05708
MARION COUNTY - ON I-70 OVER EMERSON AVENUE, 2.84 MILES
WEST OF I-465 (RP 086+0049)
1296595 | 129659500ST3 BRIDGE PAINTING, STR NO I70-089-05381
MARION COUNTY - ON I-70, FRANKLIN WAY, 0.49 MILE EAST OF
I-465 (RP 089+0082)
COMPLETION DATE: November 16, 2017 DBE GOAL: 12.00 QUALIFICATIONS: A(B) C(B) E(M)
PAGE 5
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 231 CONTRACT R -35485-A PAVEMENT REPLACEMENT AND SMALL STRUCTURE REPLACEMENT GREENFIELD DISTRICT PG. 36
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296513 | 129651300ST3 SMALL STRUCTURE REPLACEMENT
HENRY COUNTY - ON SR 38, 1.02 MILES MILES EAST OF SR 103
(RP 094+0040)
1296909 | 129690900ST3 PAVEMENT REPLACEMENT
HENRY COUNTY - ON SR 38 FROM 0.02 MILE EAST OF SR 3 TO 0.04
MILE EAST OF 31ST STREET (RP 092+0039 TO 094+0035)
COMPLETION DATE: June 30, 2018 DBE GOAL: 12.00 QUALIFICATIONS: A(A) B(A) C(B)
___________________________________________________________________________________________________________________________________
CALL 241 CONTRACT R -35626-A ROAD REHABILITATION FT. WAYNE DISTRICT PG. 40
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1297651 | 129765100LC2 ROAD REHABILITATION
KOSCIUSKO COUNTY - ON HUSKY TRAIL ROAD FROM MARINER DRIVE
TO 0.20 MILE SOUTH OF CR 200N IN THE CITY OF WARSAW
COMPLETION DATE: May 25, 2018 DBE GOAL: 14.00 QUALIFICATIONS: B(A) C(B)
___________________________________________________________________________________________________________________________________
CALL 251 CONTRACT R -35637-A ROAD RECONSTRUCTION, ROUNDABOUT GREENFIELD DISTRICT PG. 43
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006003 | 1006003 ROAD RECONSTRUCTION, ROUNDABOUT
HOWARD COUNTY - AT PARK AND MARKLAND AVENUES IN THE CITY OF
KOKOMO
COMPLETION DATE: November 16, 2018 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B) E(F)
___________________________________________________________________________________________________________________________________
CALL 261 CONTRACT R -35640-A ROAD REHABILITATION SEYMOUR DISTRICT PG. 46
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1382057 | 138205700ST5 ROAD RECONSTRUCTION
CLARK COUNTY - ON OLD SALEM ROAD FROM 4TH STREET TO SR 265
(RP 000+0000 TO 001+0000)
COMPLETION DATE: June 30, 2018 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B)
PAGE 6
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 271 CONTRACT R -35682-A ASPHALT RESURFACE GREENFIELD DISTRICT PG. 49
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296856 | 129685600ST3 ASPHALT RESURFACE
MADISON COUNTY - ON SR 13 FROM SR 37 TO FAIRGROUNDS ROAD
(RP 023+0038 TO 026+0035)
COMPLETION DATE: July 28, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A) E(F)
___________________________________________________________________________________________________________________________________
CALL 281 CONTRACT R -35965-A ROAD RECONSTRUCTION LAPORTE DISTRICT PG. 51
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1298578 | 129857800LC4 ROAD RECONSTRUCTION
ST. JOSEPH COUNTY - ON CLEVELAND ROAD FROM THE BRIDGE
OVER ST. JOSEPH RIVER TO SR 933
1401129 | 140112900LC4 BRIDGE REHABILITATION OR REPAIR, STR NO 71-00212, STEEL
PLATE GIRDER, 4 SPANS, TOTAL LENGTH 446 LFT
ST. JOSEPH COUNTY - ON CLEVELAND ROAD OVER ST. JOSEPH RIVER
0.9 MILES WEST OF SR 933
1401130 | 140113000LC4 BRIDGE REHABILITATION OR REPAIR, STR NO 71-00007, CAST IN
PLACE BOX CULVERT, 1 SPAN, TOTAL LENGTH 24.43 LFT
ST. JOSEPH COUNTY - ON CLEVELAND ROAD OVER JUDAY CREEK
0.1 MILES WEST OF SR 933
COMPLETION DATE: June 30, 2018 DBE GOAL: 12.00 QUALIFICATIONS: A(A) B(A) C(B) D(C)
MANDATORY PRE-BID MEETING
A PRE-BID MEETING HAS BEEN SCHEDULED FOR THIS CONTRACT TO OCCUR ON JANUARY 5TH, 2017 AT 10:00 CST. BIDDERS ON THIS CONTRACT
SHALL HAVE ATTENDED THIS MEETING. SEE THE PUBLISHED CONTRACT INFORMATION BOOK FOR ADDITIONAL INFORMATION.
___________________________________________________________________________________________________________________________________
CALL 311 CONTRACT R -36874-A INTERSECTION IMPROVEMENT, ROUNDABOUT GREENFIELD DISTRICT PG. 57
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383156 | 138315600LC3 INTERSECTION IMPROVEMENT, ROUNDABOUT
HAMILTON COUNTY - ON ALLISONVILLE ROAD AT CUMBERLAND ROAD
COMPLETION DATE: October 13, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B)
PAGE 7
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 331 CONTRACT R -36935-A ENHANCEMENT BIKE AND PEDESTRAIN FACILITIES LAPORTE DISTRICT PG. 59
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1382760 | 138276000LC4 ENHANCEMENT BIKE AND PEDESTRIAN FACILITIES
ST. JOSEPH COUNTY - ON MISHAWAKA RIVER WALK PATH AT
MERRIFIELD PARK
COMPLETION DATE: November 01, 2018 DBE GOAL: 12.00 QUALIFICATIONS: C(B) IDOA
___________________________________________________________________________________________________________________________________
CALL 351 CONTRACT R -37250-A ENHANCEMENT, BIKE AND PEDESTRIAN FACILITIES CRAWFORDSVILLE DISTRICT PG. 62
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1400566 | 140056600LC1 ENHANCEMENT, BIKE AND PEDESTRIAN FACILITIES
TIPPECANOE COUNTY - ON SOUTH STREET AT SCOTT STREET AND
PARKS STREET IN THE CITY OF LAFAYETTE
COMPLETION DATE: July 22, 2017 DBE GOAL: 14.00 QUALIFICATIONS: C(B) E(F)
___________________________________________________________________________________________________________________________________
CALL 361 CONTRACT R -37256-A ROAD RECONSTRUCTION SEYMOUR DISTRICT PG. 64
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383442 | 138344200LC5 ROAD RECONSTRUCTION
JACKSON COUNTY - ON WEST 2ND STREET FROM 0.38 MILE NORTH
OF US 50 TO VEHSLAGE ROAD IN THE CITY OF SEYMOUR
COMPLETION DATE: October 31, 2017 DBE GOAL: 12.00 QUALIFICATIONS: C(B) E(E)
___________________________________________________________________________________________________________________________________
CALL 371 CONTRACT R -37325-A ENHANCEMENT BIKE AND PEDESTRAIN FACILITIES FT. WAYNE DISTRICT PG. 66
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383423 | 138342300LC2 EHHANCEMENT BIKE AND PEDESTRIAN FACILITIES
WHITLEY COUNTY - ALONG SOUTH STREET, EAGLE DRIVE, WINDSOR
DRIVE AND DOUGLAS STREET
COMPLETION DATE: August 04, 2017 DBE GOAL: 14.00 QUALIFICATIONS: C(B) E(F)
PAGE 8
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 381 CONTRACT R -37345-A ENHANCEMENT, BIKE AND PEDESTRIAN FACILITIES LAPORTE DISTRICT PG. 67
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383313 | 138331300LC4 ENHANCEMENT, BIKE AND PEDESTRIAN FACILITIES
CASS COUNTY - ALONG WASHINGTON STREET AND HOWARD STREET
IN THE TOWN OF GALVESTON
COMPLETION DATE: August 18, 2017 DBE GOAL: 12.00 QUALIFICATIONS: E(F)
___________________________________________________________________________________________________________________________________
CALL 461 CONTRACT RS-29956-A ASPHALT RESURFACE VINCENNES DISTRICT PG. 68
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0100526 | 3277015 ASPHALT RESURFACE
SULLIVAN COUNTY - ON SR 58 FROM US 41 AND US 150 TO 0.79
MILE EAST OF US 41 (RP 013+0070 TO 014+0048)
COMPLETION DATE: September 08, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A) C(B)
___________________________________________________________________________________________________________________________________
CALL 471 CONTRACT RS-35134-A ASPHALT RESURFACE, BRIDGE MAINTENANCE AND REPAIR CRAWFORDSVILLE DISTRICT PG. 70
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296236 | 129623600ST1 SMALL STRUCTURE REPLACEMENT
MORGAN COUNTY - ON SR 142 AT 2.87 MILES EAST OF SR 42
(RP 002+0087)
1296607 | 129660700ST1 ASPHALT RESURFACE
MORGAN COUNTY - ON SR 142 FROM SR 42 TO SR 39
(RP 000+0000 TO 010+0019)
1296656 | 129665600ST1 ASPHALT RESURFACE
MORGAN COUNTY - ON SR 39 FROM SR 142 TO SR 42
(RP 023+0059 TO 029+0009)
1401661 | 140166100ST1 BRIDGE THIN DECK OVERLAY
MORGAN COUNTY - ON SR 142 OVER SNAKE CREEK, 3.35 MILES
EAST OF SR 42 (RP 003+0035)
1401662 | 140166200ST1 BRIDGE MAINTENANCE AND REPAIR
MORGAN COUNTY - ON SR 142 OVER KIVETT BRANCH, 4.70 MILES
WEST OF SR 39 (RP 005+0046)
1401663 | 140166300ST1 THIN BRIDGE DECK OVERLAY
MORGAN COUNTY - ON SR 142 OVER LAMBS CREEK, 4.15 MILES WEST
OF SR 39 (RP 006+0001)
PAGE 9
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
1401664 | 140166400ST1 BRIDGE MAINTENANCE AND REPAIR
MORGAN COUNTY - ON SR 142 OVER LITTLE ROCK CREEK, 3.88 MILES
WEST OF SR 39 (RP 006+0028)
1401665 | 140166500ST1 BRIDGE THIN DECK OVERLAY
MORGAN COUNTY - ON SR 39 OVER BRANCH OF CLEAR CREEK, 1.20
MILES SOUTH OF SR 42 (RP 027+0090)
COMPLETION DATE: October 20, 2017 DBE GOAL: 11.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 481 CONTRACT RS-35154-A ASPHALT RESURFACE LAPORTE DISTRICT PG. 72
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006658 | 1006658 ASPHALT RESURFACE
CARROLL COUNTY - ON US 421 FROM 0.5 MILE SOUTH OF CR 200N
TO HAMILTON STREET (RP 145+0099 TO 147+0051)
1296646 | 129664600ST4 ASPHALT RESURFACE
CARROLL COUNTY - ON SR 18 FROM US 421 TO SR 75
(RP 049+0000 TO 054+0099)
COMPLETION DATE: July 28, 2017 DBE GOAL: 10.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 491 CONTRACT RS-35165-B ROAD REHABILITATION CRAWFORDSVILLE DISTRICT PG. 74
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0900186 | 0900186 ROAD REHABILITATION
WARREN COUNTY - ON SR 63 FROM 0.12 MILE SOUTH OF SR 263 TO
US 41 (RP 092+0064 TO 096+0014)
COMPLETION DATE: October 10, 2017 DBE GOAL: 6.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 501 CONTRACT RS-37731-A ASPHALT RESURFACE LAPORTE DISTRICT PG. 76
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383572 | 138357200ST4 ASPHALT RESURFACE
LAPORTE COUNTY - ON SR 39 FROM US 20 TO THE MICHIGAN STATE
LINE (169+0051 TO 194+0085)
COMPLETION DATE: August 18, 2017 DBE GOAL: 6.00 QUALIFICATIONS: B(A)
PAGE 10
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 521 CONTRACT RS-38673-A ASPHALT RESURFACE GREENFIELD DISTRICT PG. 77
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1500819 | 150081900ST3 ASPHALT RESURFACE
JAY COUNTY - ON US 27 FROM CR 100N TO SR 18/SR 67
(RP 065+0093 TO 072+0023)
COMPLETION DATE: August 18, 2017 DBE GOAL: 7.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 531 CONTRACT RS-38689-A CONCRETE PAVEMENT RESTORATION, REPLACE SUPERSTRUCTURE FT. WAYNE DISTRICT PG. 78
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006213 | 1006213 REPLACE SUPERSTRUCTURE, STR NO I469-00-07031, CONTINUOUS
COMPOSITE STEEL BEAM, 4 SPANS, TOTAL LENGTH 266.75 LFT
ALLEN COUNTY - ON I-469 OVER I-69EB, 5.51 MILES SOUTH OF
US 24 (RP 000+0000 TO 000+0001)
1006214 | 1006214 REPLACE SUPERSTRUCTURE, STR NO I469-00-07031, CONTINUOUS
COMPOSITE STEEL BEAM, 4 SPANS, TOTAL LENGTH 266.75 LFT
ALLEN COUNTY - ON I-469 OVER I-69WB, 5.51 MILES SOUTH OF
US 24 (RP 000+0000 TO 000+0001)
1401473 | 140147300ST2 DEBRIS REMOVAL
ALLEN COUNTY - ON I-469 OVER ST MARYS RIVER, 0.45 MILE WEST
OF US 27 (RP 011+0012)
1401482 | 140148200ST2 SUBSTRUCTURE REPAIR AND REHABILITATION, STR NO I69-301-02309
ALLEN COUNTY - ON I-69 OVER N AND S RAILROAD/MUCULLOCH
DITCH, 0.80 MILE SOUTH OF US 24 (RP 301+0019)
1401483 | 140148300ST2 SUBSTRUCTURE REPAIR AND REHABILITATION, STR NO I69-328-04606
ALLEN COUNTY - ON I-69 OVER N AND S RAILROAD/MUCULLOCH
DITCH, 0.80 MILE SOUTH OF US 24 (RP 301+0019)
1401521 | 140152100ST2 REPAIRS TO APPROACH SLAB, STR NO I469-01-07021
ALLEN COUNTY - ON I-469 OVER LAFAYETTE CENTER ROAD, 0.94
MILE EAST OF I-69 (RP 001+0002)
1401522 | 140152200ST2 REPAIRS TO APPROACH SLAB
ALLEN COUNTY - ON I-469 OVER LAFAYETTE CENTER ROAD, 0.94
MILE EAST OF I-69 (RP 001+0002)
1401523 | 140152300ST2 REPAIR OR REPLACE JOINTS, STR NO I469-06-02600
ALLEN COUNTY - ON I-469 OVER N AND S RAILROAD, 0.56 MILE
WEST OF SR 1 (RP 006+0007)
1401524 | 140152400ST2 REPAIRS TO APPROACH SLAB, STR NO I469-20-07223
ALLEN COUNTY - ON I-469 OVER DAWKINS ROAD, 0.53 MILE NORTH
OF US 30 (RP 019+0095)
PAGE 11
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
1401546 | 140154600ST2 SUBSTRUCTURE REPAIR AND REHABILITATION, STR NO I469-25-07462
PRESTRESSED CONCRETE I-BEAM, 4 SPANS, TOTAL LENGTH 277.69LFT
ALLEN COUNTY - ON I-469 OVER ST JOSEPH CENTER ROAD, 0.34
MILE NORTH OF SR 37 (RP 024+0091)
1401547 | 140154700ST2 SUBSTRUCTURE REPAIR AND REHABILITATION, STR NO I469-01-07020
PRESTRESSED CONCRETE I-BEAM, 3 SPANS, TOTAL LENGTH 124.01LFT
ALLEN COUNTY - ON I-469E OVER FEIGHNER ROAD, 0.54 MILE EAST
OF I-69 (RP 000+0054)
1401548 | 140154800ST2 BRIDGE DECK PATCHING, STR NO I469-31-07487
ALLEN COUNTY - ON I-469 OVER I-69 (RP 030+0083)
1401549 | 140154900ST2 BRIDGE DECK PATCHING, STR NO I469-31-07487
ALLEN COUNTY - ON I-469 OVER I-69W (RP 030+0083)
1500836 | 150083600ST2 CONCRETE PAVEMENT RESTORATION
ALLEN COUNTY - ON I-469 FROM 2.73 MILES SOUTH OF US 30 TO
1.92 MILES NORTH OF SR 37 (RP 016+0071 TO 026+0049)
1500838 | 150083800ST2 ASPHALT RESURFACE
ALLEN COUNTY - ON I-469 FROM 1.92 MILES E OF ST JOE ROAD TO
I-69 (RP 028+0091 TO 030+0083)
1592489 | 159248900ST2 ASPHALT RESURFACE
ALLEN COUNTY - ON I-469 FROM 0.48 MILE WEST OF I-69 TO 0.54
MILE EAST OF I-69 (RP 000+0000 TO 000+0054)
1592492 | 159249200ST2 SCOUR PROTECTION (EROSION)
ALLEN COUNTY - ON I-469E OVER ST JOSEPH RIVER, 1.39 MILES
EAST OF I-69 (RP 029+0040)
1592493 | 159249300ST2 SCOUR PROTECTION (EROSION)
ALLEN COUNTY - ON I-469W OVER ST JOSEPH RIVER, 1.39 MILES
EAST OF I-69 (RP 029+0040)
COMPLETION DATE: June 01, 2018 DBE GOAL: 10.00 QUALIFICATIONS: B(A) D(B) E(Q)
___________________________________________________________________________________________________________________________________
CALL 541 CONTRACT RS-39103-A ASPHALT RESURFACE GREENFIELD DISTRICT PG. 82
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1592867 | 159286700ST3 ASPHALT RESURFACE
JAY COUNTY - ON SR 26 FROM SR 167 TO SR 1
(RP 127+0020 TO 129+0090)
COMPLETION DATE: November 06, 2017 DBE GOAL: 6.00 QUALIFICATIONS: B(A) 0194
PAGE 12
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 551 CONTRACT RS-39104-A ASPHALT RESURFACE GREENFIELD DISTRICT PG. 83
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1592868 | 159286800ST3 ASPHALT RESURFACE
SHELBY COUNTY - ON SR 44 FROM 1.7 MILES WEST OF SR 9 TO SR 9
(RP 034+0006 TO 035+0076)
1600298 | 160029800ST3 ASPHALT RESURFACE
SHELBY COUNTY - ON SR 44 FROM 1.95 MILES WEST OF I-74 TO 1.1
MILES EAST OF I-74 (RP 037+0019 TO 039+0053)
COMPLETION DATE: October 30, 2017 DBE GOAL: 12.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 561 CONTRACT RS-39105-A ASPHALT RESURFACE GREENFIELD DISTRICT PG. 85
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1592869 | 159286900ST3 THIN ASPHALT RESURFACE
WAYNE COUNTY - ON US 40 FROM 1.97 MILES WEST OF US 27 TO
0.69 MILE WEST OF US 27 (RP 144+0055 TO 144+0083)
COMPLETION DATE: September 19, 2017 DBE GOAL: 14.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 571 CONTRACT RS-39211-A ASPHALT RESURFACE VINCENNES DISTRICT PG. 87
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1592588 | 159258800ST6 ASPHALT RESURFACE
DUBUOIS COUNTY - ON SR 164 FROM 0.50 MILE EAST OF US 231 TO
0.40 MILE EAST OF SR 5 (RP 000+0050 TO 012+0020)
COMPLETION DATE: August 31, 2017 DBE GOAL: 9.00 QUALIFICATIONS: B(A)
___________________________________________________________________________________________________________________________________
CALL 581 CONTRACT RS-39212-A PATCH AND REHAB PAVEMENT VINCENNES DISTRICT PG. 88
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1592622 | 159262200ST6 PATCH AND REHAB PAVEMENT
VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE
VINCENNES DISTRICT
COMPLETION DATE: November 30, 2017 DBE GOAL: 7.00 QUALIFICATIONS: B(A)
PAGE 13
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 591 CONTRACT RS-39689-A CONCRETE PAVEMENT RESTORATION AND BRIDGE REHABILITATION FT. WAYNE DISTRICT PG. 89
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1297053 | 129705900ST2 REPLACE SUPERSTRUCTURE, (5)I69-272-04771A, CONTINUOUS
COMPOSITE STEEL BEAM, 4 SPANS, TOTAL LENGTH 267.10 LFT
HUNTINGTON COUNTY - ON SR 5 OVER I-69, 1.09 MILES SOUTH OF
SR 218 (RP 271+0076)
1401474 | 140147400ST2 DEBRIS REMOVAL FROM CHANNEL, I69-276-04775BNBL, CONTINUOUS
REINFORCED CONCRETE GIRDER, 4 SPANS, TOTAL LENGTH 412.85 LFT
HUNTINGTON COUNTY - ON VARIOUS ROADS THROUGHOUT THE FORT
WAYNE DISTRICT (RP 276+0022)
1401480 | 140148000ST2 SUBSTRUCTURE REPAIR AND REHABILITATION, I69-258-04761CNBL
CONTINUOUS STEEL BEAM, 4 SPANS, TOTAL LENGTH 159.83 LFT
GRANT COUNTY - ON I-69N OVER SR 22, 4.12 MILES NORTH OF
SR 26 (RP 259+0012)
1401481 | 140148100ST2 SUBSTRUCTURE REPAIR AND REHABILITATION, I69-258-04761BSBL
CONTINUOUS STEEL BEAM, 4 SPANS, TOTAL LENGTH 159.83 LFT
GRANT COUNTY - ON I-69S OVER SR 22, 4.12 MILES NORTH OF
SR 26 (RP 259+0012)
1401525 | 140152500ST2 REPAIR OR REPLACE JOINTS, I69-256-04760CNBL, CONT PRESTRESS
CONCRETE I BEAM, 4 SPANS, TOTAL LENGTH 369.50 LFT
GRANT COUNTY - ON I-69N OVER MISSISSINEWA RIVER, 1.78 MILES
SOUTH OF US 35 (RP 257+0028)
1401526 | 140152600ST2 REPAIR OR REPLACE JOINTS, I69-256-04760CSBL, CONT PRESTRESS
CONCRETE I BEAM, 4 SPANS, TOTAL LENGTH 369.50 LFT
GRANT COUNTY - ON I-69S OVER MISSISSINEWA RIVER, 1.78 MILES
SOUTH OF US 35 (RP 257+0028)
1401527 | 140152700ST2 REPAIR OR REPLACE JOINTS, I69-261-04763A, CONT RC CONCRETE
GIRDER, 4 SPANS, TOTAL LENGTH 211.50 LFT
GRANT COUNTY - ON CR 200S OVER I-69, 1.99 MILES SOUTH OF
SR 18 (RP 262+0002)
1401528 | 140152800ST2 REPAIR OR REPLACE JOINTS, I69-276-04775BSBL, RC GIRDER,
6 SPANS, TOTAL LENGTH 414 LFT
HUNTINGTON COUNTY - ON I-69S OVER SALAMONIE RIVER ROAD
1.31 MILES SOUTH OF SR 5 (RP 276+0022)
1401529 | 140152900ST2 BRIDGE DECK PATCHING, I69-278-04777BNBL, CONTINUOUS STEEL
BEAM, 3 SPANS, TOTAL LENGTH 144 LFT
HUNTINGTON COUNTY - ON I-69N OVER SR 5, 2.01 MILES SOUTH OF
SR 124 (RP 277+0053)
1401530 | 140153000ST2 REPAIR OR REPLACE JOINTS, I69-284-04779, CONT RC GIRDER,
4 SPANS, TOTAL LENGTH 207.50 LFT
HUNTINGTON COUNTY - ON CR 300S OVER I-69, 3.40 MILES NORTH
OF SR 124 (RP 282+0095)
PAGE 14
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
1592913 | 159291300ST2 CONCRETE PAVEMENT RESTORATION
GRANT COUNTY - ON I-69 FROM 0.49 MILE SOUTH OF SR 26 TO 1.37
MILES NORTH OF SR 22 (RP 255 +0000 TO 260+0041)
COMPLETION DATE: October 15, 2017 DBE GOAL: 12.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 601 CONTRACT B -30001-A BRIDGE AND SMALL STRUCTURE REPLACEMENT SEYMOUR DISTRICT PG. 91
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0710635 | 0710635 SMALL STRUCTURE REPLACEMENT, 50-36-09644, PRECAST THREE
SIDED STR, 1 SPAN, TOTAL LENGTH 52 LFT
JACKSON COUNTY - ON US 50 OVER TRIBUTARY OF CLEAR SPRINGS
CREEK, 6.12 MILES EAST OF SR 446 (RP 081+0065)
0800156 | 0800156 BRIDGE REPLACEMENT, STR NO 050-36-09005, COMPOSITE
PRESSTRESSED CONCRETE BULB TEE, 1 SPAN, TOTAL LENGTH 91 LFT
JACKSON COUNTY - ON US 50 OVER CLEAR SPRING CREEK, 3.35
MILES WEST OF SR 235 (RP 082-0058)
COMPLETION DATE: October 31, 2018 DBE GOAL: 9.00 QUALIFICATIONS: D(A) C(B)
___________________________________________________________________________________________________________________________________
CALL 611 CONTRACT B -30658-A BRIDGE REPLACEMENT SEYMOUR DISTRICT PG. 94
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0800072 | 0800072 BRIDGE REPLACEMENT, STR NO 403-10-08985, CONTINUOUS
COMPOSITE PRESTRESSED CONCRETE, 3 SPANS TOTAL LENGTH 277 LFT
CLARK COUNTY - ON SR 403 OVER SILVER CREEK, 0.98 MILE EAST
OF US 31 (RP 000+0098)
COMPLETION DATE: May 31, 2018 DBE GOAL: 7.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 621 CONTRACT B -31283-A BRIDGE REPLACEMENT VINCENNES DISTRICT PG. 97
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0800578 | 0800578 BRIDGE REPLACEMENT, STR NO 065-26-09066, PRESTRESSED CONC
COMPOSITE SPREAD BOX BEAM, 1 SPAN, TOTAL LENGTH 53.0 LFT
GIBSON COUNTY - ON SR 65 OVER BRANCH OF FORD DITCH, 7.30
MILES NORTH OF SR 64 (RP 040+0014)
COMPLETION DATE: May 19, 2018 DBE GOAL: 11.00 QUALIFICATIONS: D(A)
PAGE 15
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 631 CONTRACT B -32687-A BRIDGE PAINTING CRAWFORDSVILLE DISTRICT PG. 99
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0810151 | 0810151 BRIDGE PAINTING, I65-201-05422DNB, CONT COMPOSITE STEEL BEAM
, 2 SPANS, TOTAL LENGTH 144 LFT
WHITE COUNTY - ON I-65NB OVER US 231, 5.42 MILES NORTH OF
SR 18 (RP 193 +0037)
1296165 | 129616500ST1 BRIDGE PAINTING, 39-12-03953B, STEEL BEAM, 1 SPAN, TOTAL
LENGTH 60 LFT
CLINTON COUNTY - ON SR 39 OVER REAGAN RUN DITCH, 4.92 MILES
NORTH OF SR 47 (RP 074+0098)
1592366 | 159236600ST1 BRIDGE PAINTING, I65-201-05422DSB, CONT COMPOSITE STEEL BEAM
, 2 SPANS, TOTAL LENGTH 177 LFT
WHITE COUNTY - ON I-65SB OVER US 231, 5.42 MIES NORTH OF
SR 18
COMPLETION DATE: August 19, 2017 DBE GOAL: 3.00 QUALIFICATIONS: E(M)
___________________________________________________________________________________________________________________________________
CALL 641 CONTRACT B -34263-A BRIDGE DECK OVERLAY AND BRIDGE DECK PATCHING FT. WAYNE DISTRICT PG. 100
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006161 | 1006161 BRIDGE DECK OVERLAY, STR NO 327-17-06419, CONTINUOUS
REINFORCED CONCRETE SLAB, 2 SPANS, TOTAL LENGTH 89.70 LFT
DEKALB COUNTY - ON SR 327 OVER DIEHL DITCH, 1.53 MILES NORTH
OF SR 8 (RP 004+0053)
1006171 | 1006171 BRIDGE DECK PATCHING, STR NO 008-17-04029, CONTINOUS
REINFORCED CONCRETE SLAB, 3 SPANS, TOTAL LENGTH 71.60 LFT
DEKALB COUNTY - ON SR 8 OVER LITTLE CEDAR CREEK, 1.64 MILES
WEST OF SR 327 (RP 057+0057)
COMPLETION DATE: August 31, 2017 DBE GOAL: 10.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 651 CONTRACT B -34980-A BRIDGE REHABILITATION VINCENNES DISTRICT PG. 102
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296757 | 129675700ST6 BRIDGE REHABILITATION, 057-14-00510C, REINFORCED CONCRETE
ARCH, 2 SPANS, TOTAL LENGTH 133.3 LFT
DAVIESS COUNTY - ON SR 57 OVER VEALE CREEK, 1.94 MILES SOUTH
OF US 50 (RP 045+0094)
COMPLETION DATE: September 29, 2017 DBE GOAL: 9.00 QUALIFICATIONS: D(A) E(C)
PAGE 16
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 661 CONTRACT B -35026-A BRIDGE PAINTING GREENFIELD DISTRICT PG. 103
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006470 | 1006470 BRIDGE PAINTING, STR NO 332-18-07505
DELAWARE COUNTY - ON SR 332 OVER I-69
1592285 | 159228500ST3 BRIDGE PAINTING, STR NO I69-240-02304
DELAWARE COUNTY - ON I-69NB OVER N AND S RAILROAD AND
CR 275W , 0.66 MILE NORTH OF SR 332 (RP 241+0044)
1592286 | 159228600ST3 BRIDGE PAINTING, STR NO I69-240-02304
DELAWARE COUNTY - ON I-69SB OVER N AND S RAILROAD AND
CR 275W, 0.66 MILE NORTH OF SR 332 (RP 241+0044)
1592287 | 159228700ST3 BRIDGE PAINTING, STR NO I69-243-04748
DELAWARE COUNTY - ON I-69NB OVER US 35/SR 28 (RP 244+0073)
1592288 | 159228800ST3 BRIDGE PAINTING, STR NO I69-243-04748
DELAWARE COUNTY - ON I-69SB OVER US35/SR 28 (RP 244+0073)
COMPLETION DATE: November 17, 2017 DBE GOAL: 4.00 QUALIFICATIONS: E(M)
___________________________________________________________________________________________________________________________________
CALL 671 CONTRACT B -35076-A BRIDGE REHABILITATION FT. WAYNE DISTRICT PG. 104
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
0300974 | 0300974 BRIDGE REHABILITATION, 015-43-03944, CONTINUOUS PRESTRESSED
BOX BEAM, 3 SPANS, TOTAL LENGTH 102 LFT
KOSCIUSKO COUNTY - ON SR 15 OVER TIPPECANOE RIVER, 1.61
MILES NORTH OF US 30 (RP 060+0074 TO 060+0075)
COMPLETION DATE: October 27, 2017 DBE GOAL: 12.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 681 CONTRACT B -35078-A BRIDGE DECK REPLACEMENT FT. WAYNE DISTRICT PG. 106
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1006176 | 1006176 BRIDGE DECK REPLACEMENT, STR NO 020-76-03680, COMPOSITE
STEEL BEAM, 1 SPAN, TOTAL LENGTH 63.67 LFT
STEUBEN COUNTY - ON US 20 OVER PIGEON CREEK, 3.26 MILES
WEST OF I-69 (RP 137+0052)
PAGE 17
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
COMPLETION DATE: August 15, 2017 DBE GOAL: 12.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 691 CONTRACT B -35238-A BRIDGE REPLACEMENT (CONCRETE), AND BRIDGE DECK OVERLAY SEYMOUR DISTRICT PG. 108
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1173616 | 1173616 BRIDGE DECK OVERLAY, STR NO 058-03-05877C, PRESTRESSED
CONCRETE BOX BEAM, 1 SPAN, TOTAL LENGTH 46.0 LFT
BARTHOLOMEW COUNTY - ON SR 58 SOUTH FORK OF WHITE CREEK,
9.57 MILES WEST OF I-65 (RP 112+0068)
1296604 | 129660400ST5 BRIDGE REPLACEMENT, CONCRETE, STR NO 058-03-10054, PRESTRESS
CONCRETE BOX BEAM, 1 SPAN, TOTAL LENGTH 41 LFT
BARTHOLOMEW COUNTY - ON SR 58 OVER BRANCH OF WHITE CREEK,
7.92 MILES WEST OF I-65 (RP 114+0033)
1296684 | 129668400ST5 BRIDGE REPLACEMENT, CONCRETE, STR NO 058-36-10055, COMPOSITE
PRESTRESSED CONCRETE BOX BEAM, 1 SPAN, TOTAL LENGTH 36.5 LFT
JACKSON COUNTY - ON SR 58 OVER BUCK CREEK, 4.32 MILES EAST
OF SR 258 (RP 111+0001)
COMPLETION DATE: October 20, 2017 DBE GOAL: 9.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 701 CONTRACT B -35247-A BRIDGE REHABILITATION SEYMOUR DISTRICT PG. 111
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296782 | 129678200ST5 BRIDGE REHABILITATION, STR NO 001-24-06069, CONTINUOUS
COMPOSITE STEEL BEAM, 7 SPANS, TOTAL LENGTH 608.10 LFT
FRANKLIN COUNTY - ON SR 1 OVER WHITEWATER RIVER, 0.31 MILE
SOUTH OF US 52 (RP 022+0024)
COMPLETION DATE: November 10, 2017 DBE GOAL: 9.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 711 CONTRACT B -35438-A BRIDGE REHAB AND PIPE LINING GREENFIELD DISTRICT PG. 113
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296603 | 129660300ST3 BRIDGE REHAB-PIPE LINING, STR NO I74-121-08712
SHELBY COUNTY - ON I-74 OVER TRIBUTARY OF CONNS CREEK, 2.1
MILES SOUTHEAST OF COUNTY ROAD 200S (RP 120+0076)
COMPLETION DATE: August 30, 2017 DBE GOAL: 5.00 QUALIFICATIONS: E(E) E(F)
CONTRACT B-39373-A QUALIFICATION ADDED 01/06/2017 PAGE 18
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 721 CONTRACT B -36335-A BRIDGE REPLACEMENT GREENFIELD DISTRICT PG. 114
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1382332 | 138233200LC3 BRIDGE REPLACEMENT, STR NO 18-00516, CONT COMPOSITE PRECAST
PRESTRESSED BULB T BEAM, 3 SPANS, TOTAL LENGTH 327.5 LFT
DELAWARE COUNTY - ON TILLOTSON AVENUE OVER WHITE RIVER, 0.15
MILE NORTH OF SR 32
COMPLETION DATE: June 30, 2018 DBE GOAL: 7.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 731 CONTRACT B -37327-A REPLACE SUPERSTRUCTURE FT. WAYNE DISTRICT PG. 117
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383456 | 138345600LC2 REPLACE SUPERSTRUCTURE, STR NO 27-00010, STEEL PLATE GIRDER,
3 SPANS, TOTAL LENGTH 372.10 LFT
GRANT COUNTY - ON CR 500N OVER MISSISSINEWA RIVER
COMPLETION DATE: June 01, 2018 DBE GOAL: 12.00 QUALIFICATIONS: D(A)
___________________________________________________________________________________________________________________________________
CALL 771 CONTRACT B -39373-A THIN BRIDGE DECK OVERLAY SEYMOUR DISTRICT PG. 119
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1401445 | 140144500ST5 THIN BRIDGE DECK OVERLAY, STR NO 031-03-07815, 4 SPANS,
TOTAL LENGTH 544 LFT
BARTHOLOMEW COUNTY - ON US 31 OVER FLATROCK RIVER, 5.42
MILES SOUTH OF I-65 (RP 071+0096)
COMPLETION DATE: September 29, 2017 DBE GOAL: 7.00 QUALIFICATIONS: D(A) E(C)*
___________________________________________________________________________________________________________________________________
CALL 785 CONTRACT B -39699-A ROADSIDE MAINTENANCE, TREE REMOVAL AND TRIMMING CRAWFORDSVILLE DISTRICT PG. 120
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1601256 | 160125600ST1 ROADSIDE MAINTENANCE, TREE REMOVAL AND TRIMMNG
TIPPECANOE COUNTY - ON I-65E OVER WABASH RIVER, 1.13 MILES
NORTH OF SR 25 (RP 176+0003 TO 176+0069)
COMPLETION DATE: June 10, 2017 DBE GOAL: 14.00 QUALIFICATIONS: C(B) E(I) 0380
PAGE 19
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 811 CONTRACT M -39691-A ROADSIDE MAINTENANCE, TREE REMOVAL AND TRIMMING CRAWFORDSVILLE DISTRICT PG. 121
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1601242 | 160124200ST1 ROADSIDE MAINTENANCE, TREE REMOVAL AND TRIMMNG
VARIOUS COUNTIES - ON VARIOUS ROAD THROUGHOUT THE
CRAWFORDSVILLE DISTRICT
MBE GOAL: 7.00 WBE GOAL: 5.00 QUALIFICATIONS: C(B) E(T) 0380
COMPLETION DATE: March 31, 2018 IVBE GOAL: 3.00
___________________________________________________________________________________________________________________________________
CALL 821 CONTRACT M -39723-A GUARDRAIL, MAINTENANCE OR REPAIR CRAWFORDSVILLE DISTRICT PG. 122
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1601725 | 160172500ST1 GUARDRAIL, MAINTENANCE OR REPAIR
VARIOUS COUNTIES - ALONG VARIOUS ROADS THROUGHOUT THE
CRAWFORDSVILLE DISTRICT
MBE GOAL: 7.00 WBE GOAL: 5.00 QUALIFICATIONS: E(K)
COMPLETION DATE: December 31, 2017 IVBE GOAL: 3.00
___________________________________________________________________________________________________________________________________
CALL 831 CONTRACT T -35157-A TRAFFIC SIGNAL MODERNIZATION LAPORTE DISTRICT PG. 124
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1172207 | 1172207 TRAFFIC SIGNALS MODERNIZATION
VARIOUS COUNTIES - AT VARIOUS LOCATIONS THROUGHOUT THE
LAPORTE DISTRICT
COMPLETION DATE: August 15, 2017 DBE GOAL: 5.00 QUALIFICATIONS: E(A)
___________________________________________________________________________________________________________________________________
CALL 841 CONTRACT T -35487-A VISIBILITY IMPROVEMENTS GREENFIELD DISTRICT PG. 126
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296966 | 129696600ST3 VISIBILITY IMPROVEMENTS
VARIOUS COUNTIES - AT VARIOUS LOCATIONS THROUGHOUT THE
GREENFIELD DISTRICT
COMPLETION DATE: August 05, 2017 DBE GOAL: 1.00 QUALIFICATIONS: E(A)
PAGE 20
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 851 CONTRACT T -35681-A SIGN AND MARKING VISIBILITY IMPROVEMENTS GREENFIELD DISTRICT PG. 127
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1296849 | 129684900ST3 SIGN AND MARKING VISIBILITY IMPROVEMENTS
VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE
GREENFIELD DISTRICT
COMPLETION DATE: June 01, 2017 DBE GOAL: 5.00 QUALIFICATIONS: E(A) E(D) 0300
___________________________________________________________________________________________________________________________________
CALL 861 CONTRACT T -36737-A SIGN REPLACEMENT GREENFIELD DISTRICT PG. 128
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1173510 | 1173510 SIGN REPLACEMENT
DELAWARE COUNTY - AT VARIOUS LOCATIONS THROUGHOUT THE
TOWN OF EATON
COMPLETION DATE: August 31, 2017 DBE GOAL: 2.00 QUALIFICATIONS: E(D) 0300
___________________________________________________________________________________________________________________________________
CALL 871 CONTRACT T -37291-A SIGNING VINCENNES DISTRICT PG. 129
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1383657 | 138365700LC6 SIGNING
CRAWFORD COUNTY - AT VARIOUS LOCATIONS THROUGHOUT THE
VINCENNES DISTRICT
COMPLETION DATE: June 19, 2017 DBE GOAL: 5.00 QUALIFICATIONS: E(D) 0300
___________________________________________________________________________________________________________________________________
CALL 891 CONTRACT T -37675-A SIGN MODERNIZATION LAPORTE DISTRICT PG. 130
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1401042 | 140104200LC4 SIGN MODERNIZATION
LAPORTE COUNTY - AT VARIOUS LOCATIONS THROUGHOUT THE LAPORTE
DISTRICT
COMPLETION DATE: July 02, 2017 DBE GOAL: 3.00 QUALIFICATIONS: E(D) 0300
PAGE 21
NOTICE TO CONTRACTORS -- January 19, 2017 LETTING
___________________________________________________________________________________________________________________________________
CALL 901 CONTRACT T -37677-A SIGN MODERNIZATION LAPORTE DISTRICT PG. 131
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1401045 | 140104500LC4 SIGN MODERNIZATION
LAKE COUNTY - AT VARIOUS LOCATIONS THROUGHOUT THE CITY OF
HOBART
COMPLETION DATE: September 29, 2017 DBE GOAL: 1.00 QUALIFICATIONS: E(D) 0300
___________________________________________________________________________________________________________________________________
CALL 931 CONTRACT T -38523-A TRAFFIC SIGNAL MODERNIZATION SEYMOUR DISTRICT PG. 132
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1500613 | 150061300LC5 TRAFFIC SIGNAL MODERNIZATION
JOHNSON COUNTY - AT VARIOUS LOCATIONS THROUGHOUT THE CITY OF
GREENWOOD
COMPLETION DATE: June 30, 2016 DBE GOAL: 1.00 QUALIFICATIONS: E(A)
___________________________________________________________________________________________________________________________________
CALL 951 CONTRACT T -39147-A CENTERLINE AND EDGE LINE RUMBLE STRIPES INSTALLATION SEYMOUR DISTRICT PG. 133
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1600118 | 99927500ST5 CENTERLINE AND EDGE LINE RUMBLE STRIPES INSTALLATION
VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE SEYMOUR
DISTRICT
COMPLETION DATE: June 30, 2017 DBE GOAL: 3.00 QUALIFICATIONS: E(G) E(R)
___________________________________________________________________________________________________________________________________
CALL 961 CONTRACT TM-39772-A TRAFFIC SIGNAL MAINTENANCE GREENFIELD DISTRICT PG. 134
PROJECT CONTROL NUMBER | FED/STATE NUMBER LOCATION
------------------------------------------ -----------------------------------------------------------
1601771 | 160177100ST3 TRAFFIC SIGNAL MAINTENANCE
VARIOUS COUNTIES - AT VARIOUS LOCATIONS THROUGHOUT
THE GREENFIELD DISTRICT
MBE GOAL: 7.00 WBE GOAL: 5.00 QUALIFICATIONS: E(A)