india emission regulations summary - idema€¦ · · 2011-08-30india emission regulations...
TRANSCRIPT
Indian Diesel Engine Manufacturers' Association
INDIA EMISSION REGULATIONS
SUMMARY
03-Aug-2011For reference only. Please refer to documents from
concerned ministries for correctness.
Ramesh Pasarija
Chairman, Technical Committee
IDEMA
Indian Diesel Engine Manufacturers' Association
Important Note
The norms informed here are for
reference only and there may be some
03-Aug-2011
reference only and there may be some
errors. For precise norms and dates of
implementation, please refer to
appropriate documents from the
concerned ministries.
2
Indian Diesel Engine Manufacturers' Association
Index
1. India – Air Quality and Noise Standards
2. Fuel Sulphur Road Map
3. Diesel Genset
4. Auto – Diesel & CNG
03-Aug-2011
4. Auto – Diesel & CNG
5. Construction Equipment Vehicle
6. Agricultural Tractor
7. Power Tiller
8. Marine
3For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' AssociationNational Ambient Air Quality Standards, India
PollutantIndia
Averaging periodIndustrial, Residential,
Rural & other areasSensitive area
Carbon Monoxide (CO)1 Hour ** 4 mg/m3 4 mg/m3
8 Hours ** 2 mg/m3 2 mg/m3
Perticulate Matter, PM₁₀24 hours** 100 µg/m3 100 µg/m3
Annual* 60 µg/m3 60 µg/m3
03-Aug-2011 4
₁₀Annual* 60 µg/m3 60 µg/m3
Perticulate Matter,PM₂.₅24 hours** 60 µg/m3 60 µg/m3
Annual* 40 µg/m3 40 µg/m3
Sulphur Dioxide (SO₂)
- - -
24 hours** 80 µg/m3 80 µg/m3
Annual* 50 µg/m3 20 µg/m3
Nitrogen Dioxide (NO₂)
- - -
24 hours** 80 µg/m3 80 µg/m3
Annual* 40 µg/m3 30 µg/m3
For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' AssociationNational Ambient Air Quality Standards, India
PollutantIndia
Averaging periodIndustrial, Residential,
Rural & other areasSensitive area
Ozone (O₃) 1 Hour ** 180 µg/m3 180 µg/m3
8 Hours ** 100 µg/m3 100 µg/m3
24 hours** 1 µg/m3 1 µg/m3
- - -
03-Aug-2011 5
Lead (Pb)- - -
- - -
Annual* 0.5 µg/m3 0.5 µg/m3
Ammonia (NH₃)24 hours** 400 µg/m3 400 µg/m3
Annual* 100 µg/m3 100 µg/m3
Benzene (C₆H₆) Annual* 5 µg/m3 5 µg/m3
Benzo(a)Pyrene (BaP) Particulate phase only
Annual* 1 ng/m3 1 ng/m3
Arsenic (As) Annual* 6 ng/m3 6 ng/m3
Nickel (Ni) Annual* 20 ng/m3 20 ng/m3
Cadmium (Cd) - - -
For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
03-Aug-2011 6For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
India Diesel Fuel Sulfur Road Map
2005 2006 2007 2008 2009 2010 * 2011 * 2012 * 2013 *
03-Aug-2011
India - Metro 350 - 500 350 350 350 350 50 - 350 50 50 50
India - All 500 - 2500 500 500 500 500 350 - 500 350 350 350
Figures - in PPM
7
* Sulfur road map beyond 1-Apr-2010 is estimated.
For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Diesel Genset Engines below 800 kWm
Category
Current Norms : CPCB - I
Effective from
NOx HC CO PM Smoke limit
g/kW-hr
Light absorption
co-efficient m-1
@ full load
0 - 19 kW
03-Aug-2011
Implemented
from 2003-2005
depending upon
power band
9.20 1.30 3.50 0.30 0.70
>19 - 36 kW
37 - 75 kW
> 75 - 129 kW
130 - 560 kW
561 - 800 kW
Fuel Sulphur Less than 500 ppm for Certification, Less than 2500 ppm for in field
Smoke : Opacity to be measured at rated load only
Test Cycle : D2-5 Mode cycle specified under ISO 8178
8For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Category
Future Norms : CPCB - II
Effective from
NOx + HC CO PM Smoke
g/kW-hr
Light absorption co-
efficient m-1 @ full
load
0 - 19 kW 01-Jul-2013 7.50 3.50 0.30 0.70
Diesel Genset Engines below 800 kWm
As per discussion with CPCB. Notification awaited.
03-Aug-2011
0 - 19 kW 01-Jul-2013 7.50 3.50 0.30 0.70
>19 - 36 kW01-Jul-2013 4.70 3.50 0.30 0.70
37 - 75 kW
> 75 - 129 kW
01-Jul-2013 4.00 3.50 0.20 0.70130 - 560 kW
561 - 800 kW
Fuel Sulphur Less than 350 ppm
Smoke : Opacity to be measured at each point of the 5 mode test cycle & need to
comply with the limits.
Test Cycle : D2-5 Mode cycle specified under ISO 8178
9For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Noise Regulations for the Gensets below 1000 kVA
03-Aug-2011
All DG sets up to 1000 kVA must have acoustic
enclosures, with noise below 75dBA at distance of 1
meter, at 75% load.
Effective from 1-Jan-2005
10For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Noise Regulations for the Gensets above 1000 kVA
Noise from DG sets shall be controlled by providing an
acoustic enclosure or treating the room acoustically, at
the users end.
03-Aug-2011
the users end.
The acoustic enclosure or acoustic treatment of the room
shall be designed for minimum of 25 dB (A) insertion loss
or for meeting the ambient noise, which ever is on the
higher side.
Effective from 1-Jan-2005
11For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
The Ministry of Environment & Forests, Govt. of India, has notified Emissions standards
for Diesel Gensets from 800 kW - 75 mW / 150 mW.
( Ref. GSR # 489(E) F.No.Q-15017/ 24/ 2002-CPW Dated 09-Jul-2002 )
Genset Single point Emissions data
Commissioning
Existing Diesel Generator Sets Emission Regulations in India
Applicable for Engines above 800 kWm
03-Aug-2011
Commissioning
date NOX NMHC CO PM
( ppmV ) ( mg/Nm3 ) ( mg/Nm3 ) ( mg/Nm3 )
Before 01-Jul-03 1100 150 150 75
Between 01-Jul-03
and 01-Jul-05970 100 150 75
After 01-Jul-05 710 100 150 75
On site Emissions measured at > 85% - 100% load, corrected to 15% oxygen
on dry basis. Volume Nm3 correction to 25 Deg C and 101.3 kPA
12For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Stack Height for Diesel Gensets above 800 kWm
03-Aug-2011 13For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Current Regulations for Auto – Diesel Heavy Duty > 3500 kg GVW
Bharat Stage – IV (BS-IV) in 13 Metros from 01-Apr-2010
Bharat Stage – III (BS-III) in rest of the country from 01-Oct-2010
Category Test Cycle
Current Norms - Bharat Stage III
Effectivefrom
CO HC NOx PM
g/kW-hr
03-Aug-2011
Diesel vehicles with GVW > 3500 kg
Engine Steady state cycle (ESC)
01-Apr-05 2.10 0.66 5.00 0.10
Diesel vehicles with GVW > 3500 kg & advanced exhaust after treatment system
Engine Transient Cycle (ETC)
01-Apr-05 5.45 0.78 5.00 0.16
Category Test Cycle
Current Norms - Bharat Stage IV
Effectivefrom
CO HC NOx PM
g/kW-hr
Diesel vehicles with GVW > 3500 kg
Engine Steady state cycle (ESC)
01-Apr-10 1.50 0.46 3.50 0.02
Diesel vehicles with GVW > 3500 kg
Engine Transient Cycle (ETC)
01-Apr-10 4.00 0.55 3.50 0.03
14For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Current Regulations for Auto – CNG Heavy Duty > 3500 kg GVW
BS III
Steady State
03-Aug-2011
NOxg/kW-h
COg/kW-h
NMHCg/kW-h
5 2.1 0.66NOxg/kW-h
COg/kW-h
NMHCg/kW-h
Methaneg/kW-h
3.5 4 0.55 1.1
Steady StateBS IV
Transient
15For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Applicable DF factor on Automotive Engine Emission Norms in INDIA
Vehicle Manufacture may opt for fixed deterioration factor
Engine Type Test Cycle NOx HC NMHC CO PM CH4
03-Aug-2011
Engine Type Test Cycle NOx HC NMHC CO PM CH4
Diesel Engine ESC 1.05 1.05 --- 1.10 1.10 ---
Diesel Engine ETC 1.05 1.05 --- 1.10 1.10 ---
CNG, LPG or
Gaseous EngineETC 1.05 1.05 1.20 1.10 --- 1.20
For reference only. Please refer to documents from
concerned ministries for correctness. 16
Indian Diesel Engine Manufacturers' Association
Future Regulations for Auto
03-Aug-2011
OBD for Diesel as well as CNG will be implemented from
1-Apr-2013 on BS-IV engines / vehicles.
Its is similar to Euro-V OBD-Stage 2 regulations
17For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Construction Equipment Vehicles
03-Aug-201118For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Construction Equipment – Current Regulations
Limit Values for Type Approval (TA) as well as for Conformity of Production (COP)
Bharat Stage II (CEV)Effective from
CO HC NOx PM
Category g/kW-hr
kW < 8 1st October, 2008 8.0 1.3 9.2 1.0
8 ≤ kW < 19 1st October, 2008 6.6 1.3 9.2 0.9
19 ≤ kW < 37 1st October, 2007 6.5 1.3 9.2 0.9
37 ≤ kW < 75 1st October, 2007 6.5 1.3 9.2 0.9
03-Aug-2011
37 ≤ kW < 75 1st October, 2007 6.5 1.3 9.2 0.9
75 ≤ kW < 130 1st October, 2007 5.0 1.3 9.2 0.7
130 ≤ kW < 560 1st October, 2007 5.0 1.3 9.2 0.5
Bharat Stage III (CEV)Applicable with effect from
CO HC + NOx PM
Category g/kW-hr
kW < 8 1st April, 2011 8.0 7.5 0.8
8 ≤ kW < 19 1st April, 2011 6.6 7.5 0.8
19 ≤ kW < 37 1st April, 2011 5.5 7.5 0.6
37 ≤ kW < 75 1st April, 2011 5.0 4.7 0.4
75 ≤ kW < 130 1st April, 2011 5.0 4.0 0.3
130 ≤ kW < 560 1st April, 2011 3.5 4.0 0.3
19For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Applicable DF factor on CEV Engine Emission Norms in
INDIA
03-Aug-2011
Engine Type NOx HC CO PM
Diesel Engine 1.05 1.05 1.10 1.10
For reference only. Please refer to documents from
concerned ministries for correctness.20
Indian Diesel Engine Manufacturers' Association
Agricultural Tractors – Current and Future
Bharat (Trem) Emission Standards for Diesel Agricultural Tractors
Engine Power Effective
from
CO HC HC + NOx NOx PM
kW g/kW-hr
Bharat (Trem) Stage I
All 1999.10 14 3.5 - 18 -
Bharat (Trem) Stage II
03-Aug-2011
All 2003.06 9 - 15 - 1
Bharat (Trem) Stage III
All 2005.06 5.5 - 9.5 - 0.8
Bharat (Trem) Stage III A
P < 8 2010.10 5.5 - 8.5 - 0.8
8 ≤ P < 19 2010.10 5.5 - 8.5 - 0.8
19 ≤ P < 37 2010.10 5.5 - 7.5 - 0.6
37 ≤ P < 75 2011.10 5 - 4.7 - 0.4
75 ≤ P < 130 2011.10 5 - 4 - 0.3
130 ≤ P < 560 2011.10 3.5 - 4 - 0.2
21For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
Emission standards for Power Tillers
Category Test Cycle
Previous Norms -Trem II
Effective
from
CO HC + NOx PM
g/kW-hr
03-Aug-201122
fromg/kW-hr
-ISO 8178-4 "C1"
8 Mode cycle01-Oct-06 9.00 15.0 1.00
Category Test Cycle
Current Norms - Trem III
Effective
from
CO HC + NOx PM
g/kW-hr
-ISO 8178-4 "C1"
8 Mode cycle01-Apr-08 5.50 9.50 0.80
22For reference only. Please refer to documents from
concerned ministries for correctness.
Indian Diesel Engine Manufacturers' Association
IMO Regulations
The NOx control requirements of Annex VI apply to install marine diesel engine of over 130 kW output power other than those used solely for emergency purposes irrespective of the tonnage of the ship onto which such engines are installed. Definitions of ‘Installed’ and ‘marine diesel engine’ are given in regulations 2.12 and 2.14 respectively. Different levels (Tiers) of control apply based on the ship construction date, a term defined in regulations 2.19 and hence 2.2, and within any particular Tier the actual limit value is determined from the engine’s rated speed:
Ship Construction
Total weighted cycle emission limit (g/kWh)n = Engine's rated speed (rpm)
03-Aug-2011
TierShip Construction
date on or after
n = Engine's rated speed (rpm)
n < 130 n = 130 - 1999 n ≥ 2000
I 1 January 2000 17.045.n-0.2
e.g., 720 rpm – 12.19.8
II 1 January 2011 14.444.n-0.23
e.g., 720 rpm – 9.77.7
III 1 January 2016* 3.49.n-0.2
e.g., 720 rpm – 2.42.0
* subject to a technical review to be concluded 2013 this date could be delayed, regulation 13.10.
23For reference only. Please refer to documents from
concerned ministries for correctness.