Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA: Accelerating Infrastructure Investment Facility in India Tranche 3 DBL Mahagaon-Yavatmal Highways Private Limited (Part 2 of 5) Prepared by India Infrastructure Finance Company Limited for the India Infrastructure Finance Company Limited and the Asian Development Bank.

Upload: others

Post on 13-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Environmental and Social Due Diligence Report

Project Number: 47083-004 December 2019

INDIA: Accelerating Infrastructure Investment

Facility in India – Tranche 3 DBL Mahagaon-Yavatmal Highways Private Limited (Part 2 of 5)

Prepared by India Infrastructure Finance Company Limited for the India Infrastructure Finance

Company Limited and the Asian Development Bank.

Page 2: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

This environmental and social due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

MAHARASHTRA POLLUTION CONTROL BOARDPhone : 957i72-25196S Udyog Bhavan, Ftrst Floor, Opp Bus Stand

Fax : 957 172-251965 vr"*"ls',r'* Railway staiion Rcad chandrapur-442401

EmaiI:[email protected]

Visit At ; hmp: mpcb.gor.in \77

Orange/S.S.I Date:09/08/2017

consent No: RO-GHANDRApUR/coNSENT/ir0B000ss6/A I L /2012

Consent to Establish under Section 25 of the \\-ater (prer.ention & Controlof Pollution) Act. 1g7i & u,der section 2L of the -\ir (pre'ention &control of Pollution) Act. rgEl and Authorization / Rene*-ar ofAuthorization under Rule J of the Hazardous \r-astes (llanagernent.Handling & Trans-boundary ]Iovement) Rules 200g

[To be referred as water Act, Air Act and ]rw (M&H) Rules respectivelyl.

CONSENT is hereby granted to

M/s. Dilip Buildcon Ltd.,.,..,, :::',i::::,, : i

s. No. 478, 47914, 475, 475iL, 475t111,4751L12, 47513, 477, 479, 476, 47213, 32g,Village Sukuli, Tal. Arni, Dist. yavatrnal.

Located in the area declared und.er ilr" pr"rl.ions of the water Act, Air-{uthorization undel the plovision-. of H\\- 0I&H.i R,rles ancl amenCmenrssubject ro the pro\-Islons of rhe Act an,l the Rules and the Ordels thatmade further and subject to the forlowing terms and conditions:

act andthelet,rmay- be

L.

)

The Consent to Establ'il. iigranted for a period upthe unit or 5 years;l,iihic'hUver is earlier.

The ConsentiS'*itiortfre manufacture of -

Commissioning of

comprehensive treatdtertiary treatment as id

operate and maintain thethe treated effluent to the

,",,/1

!r

Sr. ',I.-:[6: Product Name Maxirnurn Quantity UOM1 Stone Crusher 3200 MT/D2 wMM(DLC) 2000 MT/Davt) Sand Classifier 640 TPD4 RMC M 2.5 700 M3/Dav5 RMC CP3O 200 M3/Dav

3. CONDITIONS UNDER WATERACT:(i) The daily quantity of trade effluent from the factory shall not exceed 6.0(ii) The daily quantity of sewage effluent from the factory shall not exceed 1

\}ri

lr

(iii) Trade Effluent: The applicant shall providesystem consisting of primary / secondary and,/orwarranted with reference to influent quality andsame continuously so as to achieve the quality of r

following standards:

6,r,9fr ft

Page 4: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

pHSuspended Solid

I9O s days 27 Des. CC.O.DOiI & GreaseTotal Dissolved SolidChlorides

(iv)Trade Effluent Disposal: Treateffluent for batch mixing. ment; The applicant

1)

2)

3)

4)

5)

6)

7)

BetweenNot to exceedNot to exceedNot to exceedNot to exceedNot to exceedNot to exceed

5.5 to 9.0100 mg/I.100 mg/I.250 mg/I.10 mg/l.2100 mg/l.600 mg/I.

shal] r';, ri: "'- . --.L--: .i::]_i

(v) Sewage Effl

ry*dr,iT{#I::d**lf .iqf # ji*l+it*,#:rr};n::effluent to the fotlowrn*l#il;:'. eve the'n;;ri;;;; trearecl

(1) suspended s:Id.^ Not to exceed 100 mg/1.(2) BOD B days 27o C. f.i", r" u*"""J ioo ms/t.

(vi) sewage Effluent Disposal: The treated- domestic ef{uent s-}ra, be soaked in a: :t JjiJ*: ".1,1,1 [ f :1 ,1# : *,fffi :il;:, ffi,;o o w, if

" ;i,- ; h, fi e u,s e d

(vii) Non-Hazardous Solid Wastes:

Sr. No- Typu OiE..tu' Qrr,rtit_iJO jli--.--._-

G1 T"eatm"nt-Stone Dust DisposalBy SaIe

,.;,:ff Hll"Jr[:?-.,"tr jiili#'df ';:':"#:"yxT'.,1:'Ttl"t:The daily rvater .o.,..r*ruo;;il;: fnn^_.-r-_ ^ -

(i) Domestic pu.pose r the folio*'ing catego.ies is a-' ttndsr:

(ii) \\'ate'gets Poll*ted & Porutants are Biodeg.acrabre ..' 1J.00 c-\[D

[;,il;H,::iL"":1T,"r, p,u;;;;;1,i.,,o,

ei"i"=.;J,iru & ro,i. .. l;?if,,oong, spral.ing in mine pits or fi;;;; _

... tr.iirl C-\ID

:::::dllJr'JiI311 -shal,l .egurarr-v

::l,,ll ro^ the Boarci rhe reru'ns or \\,ate,.tt u .ura'i"L 'r u,u presc,ibed form and pa5' the c"..

";.;"cified under Section B of

5. CONDITIONS UNDERAIRACT :

''i*T,,1rutrq{,16i;::*k;tr;:ir::i::J::i.;t:r:::c.nsis,ing.rand operate and

"rui"rr."l-rrT;;.*":':_i:,.":::: to generatio, of u*Go,

of poilutants to the foilowing,*"Ir"r.jlltinuouslv so as to achieve ir* 1"""i

a. Control Equipment:ti)

il?ir"-i:Xther will be provided with dust corector and Automatic Water

area, stock piles

(ii) Scientific spray^ing of water on all working area, dump, with the help of afproprir," arrirrppression system.

Page 5: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

6.

[iii) Stone shall be properl-1.cor-ered during ransportation.[ivJ The appiicant shiri .1..t. o,r, *ee prantation arong road side, arounddumps or compurso..'u fo..rrri,o" as per proposal appro'ed by ForestDepartment. The tree prantation program sha, be taken up .,ve, inadvance of the a.ctuar mrnrng acti'lry, ,it-,rt g...n uelt orsurncient,"vidth

ilt *:'f,Lis deveroped b"errveen mining irea/road and surrounding

[v] Black topped metared roads sha, be provided and we, maintained toprevent dust formation.[vi] Overloading of dupers shall be avoided to prevent spillages,

Standards for Stack Emissions:

ti'r The appricant sha, observe the fo,o*-ing fuel pattern:-

Sr. -\r. o. 'I.ype Of Fuel fift, ittnl1 HSD 1 185 LtrlDav2 tISI-) 590 Ltr/Dav3 HSD 195 LtrlDau4 flsI_) 130 T,inln5 HSD 95 IttilDav

(ir) The applicant shall erect thespecifications:-

.ofri 'er(s) of followingthet

G 5OO KVA 5.0 (Above loof)

Sr. No. Chimnev Ail;;h;ffi) Height in Mtrs.1 uust Uollector 5.0 (Abov" ro"n2

I

I

I

I

(iii) The appljca#+i;furovide ports in the chimney/(s) and facilities such asladder, praJforlr-r etc. for monitoring the ,i, ,*i.rions and the same sha, beopen for,in-g.pection toland for use of the Boardb staff. The chimney(s) ventsattach€il to various sources of emission .t;i;;;"##a,Iilr,lr_0"r.= if;r*;.a

s_2, "t"","J"rr,","I;;ii;J;1"ted/ disprayed to raclitate

(iy)u

" " industry shall take adequate measures for control of noise revers fromi"it;-' "-"j""1" own sources within the premises so as to maintain ambient air quality'r,,"' standard in respect of noise to.less tfrr"iiig(O during day time and 70dB(A) during night time. Day time is ,u"korr"d-r, between 6 a.m. and 10p.m. and night time is reckoned but*"un tO p* ,ra 6 a.m.

(v) Other Conditions:1' The industry should not cause any nuisance in surrounding area.2' The industry should monitor.tu.i. ur"i""r"". ,"a ambient air regularly.

7. CONDITIONS UNDER HAZARDOU,S_ W-ASTE (MANAGEMENT, HANDLING &TRANSBOUNDRY MOVEMENT) RULES, 2008:

(, The Industry shail not generat e any hazardous waste.

)4-'

?t*-'*-,i5rc

Sffi#

DGDG 100

K\A

Page 6: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

B' Industry shall comply with following additional conditions:

i' The applicant shal maintain good housekeeping and take adequate measuresh::*ir"l-:1j"1":Ht,,*il " 'o"'""'-lo^'?"*',ot to cause nuisance to

{.. ii'

;l"utrX"}:i}i;i#l}i[Xl minimum 33% orthe availabre open rand under s,een

'iii' soiid waste - The non hazardous solid waste arising in the factory premises,; sweepings, etc., be disposed of scientificu[v ." ,, ,ot to cause any nuisance /pollution' The applicani shall take necessary permissions from civic authorities:,,

fOr diSpOSal tO dumping *r"""j. -^v uvv'DDary pulrrllSSrw,D uurrl CIVICAuth

iv' The applicant shall provide for an alternate erectric power .o.,r""'.rrffijiurt tooperate all pollution control facilities insi"ri"a u, he applicant. to maintaincompliance with the terms and conditior" oitrr" ll.rsurt. In the absence, theapplicant shall stop, reduce or otherrvis;, .;;;;j iiiar"tio, to abide by terms& conditions of thls consent ""*".ai"* o"lf"r., i"ri"f.

;

v' The applicant shall not change or alter quantit5-, qualit5.. the ,ate of clischa.ee.temperature or the mode oithe effluent / ";l;.i;. or haza'dous *-astes i'

;'":.T] equipments provided for rvithout pru'io.,. ,.-.itt"r, pe,rnission of the

vi' The appiicant shall provide fac,ity fbr conection of en. .

s a mp te s of tra de ^ "; "";;;;" m,i" rrr,

"

" ; ;ffi # ;., ;T:ffi ::i:::ilrff ijthe Board staff at the termln.ili,+*.rc#;;#r:nd

shalr pay to the Boardfor the services rendered;1ill".U"Urif] -- r----vv qr

vii' The appiicant slall m^a\; an application for renerval of the consent at least 60days before the date of the "rpi..5i

o111re consent.

viii.The firm shall submit to this office, th3 B0;h da1, of Septembel er_er1- 1.ear.. theEnvilonmental Statem"", n"n".* "fo.

tt "

fira.rciaL y:e-i ending. 31., Jlarch mthe prescribed Form-v as pre ,r." ,."r..-r*'"iirl"""rn of the Enr-ir.onment(Protection) (Second a-"rra'-*ij i,ules, rggZ. - -' - l

ix' As'inspection book shal be opened and made a'ailabre to the Board,s office's.-.dui.ing their visit to the uppii"uri. *

-'The appiicant shalr insta, a separate er.ectric meter. shorving the consumptionof energv for operation of d"-;;;; ;nd industrar "mr".,t treatment plantsand air pollution cont,ol_syst"-. i."grster shorvin* ""r."rrotion of chemicarsused for treatment shall be maintainei,

separate drainage system shalr be provided for corjection of trad.e arrd sewagJ;effluents' Terminal manholes shall ie"provided at the end of collection systemrwith arrangement for measuring the flow. No effluent.r,Jr r" admitted in thepipes / sewers down- stream of the terminar *r.rhol*. Nolrnrr"r, sharl find itsway other than in designed and provided coilectior.i.,n*. '

x.

xl.

W,,\s.1..-

:.,...:':;

xii' Neither storm water nor_ discharge from other premises shall be allowed to mixwith the effluents from the factorir.

\r,

Page 7: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

9. The Capital investment of the industry is Rs. 744.00 Lacs. 1, --' ,,--M(Sjldshi) _E

xiii.The project authorities shall install well designed water sprinklingarrangements including fixed and mobile sprayers for dust suppression.

Regional Officer,Chandrapur

To,IWs. Dilip Buildcon Ltd.,S. No. 478, 47814, 475, 47511, 475llll, 4751112,

47513, 477, 478, 476, 47213, 329, Village Sukuli,Tal. Arni, Dist. Yavatrnal.

Received Consent fee of -Sr. No. Arnount(Rs.) Transaction No. Transaction Date1 250001- TXN1707000508 06-07-24'\!1

i

Page 8: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Application for Consent/ AuthorisationSir,I/We hereby apply for*

1. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act, 1974 asamended.

2. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981, asamended.

3. Authorization/renewal of authorization under rule 5 of the Hazardous Wastes (Management and Handling) Rules, 1989, as amended inJanuary,2000, in connection with my/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as perthe details given below.

Consent Information

UAN No:MPCB-CONSENT-0000034403

Industry Information

Consent To: IIN No.: Submit to:Operate SRO - Chandrapur

Type of institution: Industry Type: Category: Scale:Industry O64 Stone crushers Orange S.S.I

EC Reqd. EC Obtained EC Ref. No.No No -

Whether construction-buildup area is more than 20,000sq.mtr.(Existing Expansion Unit)

No

General Information

1. Name, designation, o ce address with Telephone/Fax numbers, e-mail of the Applicant Occupier/Industry/Institution / Local Body.

Name AddressBHANU PRATAP SINGH M/S DILIP BUILDCON LTD. BASE CAMP VILL MHAMOSLA

Designation TalukaSR. MANAGER YAVATMAL

Area District27 Yavatmal

Telephone Fax7898401083

Email Pan [email protected] AACCD6124B

Page 9: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

2. (a) Name and location of the industrial unit/premises for which the application is made (Give revenue Survey Number/Plot numbername of Taluka and District, also telephone and fax number)

Industry nameM/S DILIP BUILDCON LTD

Location of Unit Survey number/Plot NumberMHASOLA 130, 132/1

Taluka DistrictYAVATMAL Yavatmal

(b) Details of the planning permission obtained from the local body/Town and Country Planning authority/Metropolitan Developmentauthority/ designated Authority.

Planning permission Planning AuthorityMHASOLA GRAMPANCHAYAT MHASOLA

Name of the local body under whose jurisdiction the unit is located and Name of the licence issuing authority

Name of Local Body Name of the licence issuing authorityGRAMPANCHAYAT MHASOLA GRAMPANCHAYAT MHASOLA

3. Names,addresses with Telephone and Fax Number of Managing Director / Managing Partner and o cer responsible for mattersconnected with pollution control and/or Hazardous waste disposal.

Name of Managing Director Telephone numberSHRI DILIP SURYAWANSHI 0755402998

Fax number O cer responsible for day to day businessBHANU PRATAP SINGH

4. (a.) Are you registered Industrial unit ? Yes

Registration number Date of registrationU45201MP2006PLC018689 Jun 12, 2006

5. Gross capital investment of the unit without depreciation till the date of application (Cost of building, land, plant and machinery). (Tobe supported by an a davit/undertaking on Rs.20/- stamp paper, annual report or certi cate from a Chartered Accountant for proposedunit(s), give estimated gure)

Gross capital (in Lakh) * Veri ed * Consent Fee 744.00 CA Certi cate 25000.00

6. If the site is located near sea-shore/river bank/other water bodies/Highway, Indicate the crow y distance and the name of the waterbody, if any.

Distance From Distance(Km) * NameSH/NH 1.00 --NA--

River 10.00 --NA--

Human Habitation 6.00 --NA--

Religious Place 0.00 --NA--

Historical Place 30.00 --NA--

Creek/Sea 1000.00 --NA--

6b. Enter Latitude and Longitude details of site

Latitude Longitude0 0

Page 10: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

7. Does the location satisfy the Requirements Under relevant Central/State Govt. Noti cation such as Coastal Regulation Zone.Noti cation on Ecologically Fragile Area, Industrial Location policy, etc. If so, give details.

Location Approved IndustryArea

Sensitive Area If Yes, Name Of Area Industry Location withReference to CRZ

NA No No NA A1

8. If the site is situated in noti ed industrial estate,

Details(a) Whether e uent collection,treatment and disposal system hasbeen provided by the authority.

No NA

(b) Will the applicant utilize thesystem, if provided.

No NA

(c) If not provided, details of proposedarrangement.

NA

9.

(a) Total plot area (in squear meter) (b) Built up area and (in squear meter) (c) Area available for the use oftreated sewage/ trade e uent forgardening/irrigation. (in squear meter)

97512 2000 NA

10. Month and year of commissioning of the Unit.

2017-09-20

11. Number of workers and o ce sta

Workers sta Hrs. of shift Weekly o100 50 8 SUNDAY

12.

(a) Do you have a residentialcolony Within the premisesin respect of Which thepresent application is Made?

Yes WORKER COLONY AND LABOUR COLONY

(b) If yes, please state population stayingNumber of person staying Water consumption Sewage generation Whether is STP provided?

15000 0 No

(c) Indicate its location and distance with reference to plant site.Number of person staying Water consumptionMHASOLA 130, 132/1 0.5

13. List of products and by-products Manufactured in tonnes/month, Kl/month or numbers/month with their types i.e.Dyes, drugs etc.(Give gures corresponding to maximum installed production capacity

Products Name and Quantity

ProductName

UOM ProductName

Existing Consented ProposedRevision

Total Remarks

Stone Crushers MT/Day AGGREGATE 0 0 3200 3200 STONECRUSHER250TPH

Metal MT/Day WET MIX 0 0 2000 2000 WMM/DLCPLANT 200TPH

Metal MT/Day DRY SAND 0 0 640 640 SANDAIRCLASSIFIRE

Page 11: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Metal MT/Day HOT MIX(DBM&BC)

0 0 1600 1600 BATCH MIXPLANT 160 TPH

RMC m3/day READY MIXCONCRETE

0 0 700 700 RMC M2.25

RMC m3/day READY MIXCONCRETE

0 0 200 200 RMC CP-30

Products Name and Quantity

Product Name UOM Quantity RemarksNA --NA-- 0 NA

14. List of raw materials and process chemicals with annual consumption corresponding to above stated production gures, intonnes/month or kl/month or numbers/month.

Name of Raw Material UOM Quantity HazardousWaste

HazardousChemicals

Remarks

CEMENT m3/day 400 No No NA

500MM STONE BOULDER MT/Day 3000 No No NA

BITUMEN MT/Day 100 No No NA

15. Description of process of manufacture for each of the products showing input, output, quality and quantity of solid, liquid andgaseous wastes, if any from each unit process.

ATTACHED

Part B : Waste Water aspects

16. Water consumption for di erent uses (m3/day)

Purpose Consumption E uentGeneration

Treatment Remarks Disposal Remarks

Domestic Pourpose 15 12 Septic Tank NA On Land forGardening

NA

Water gets Polluted& Pollutants areBiodegradable

60 0 --NA-- NA --NA-- NA

Water getsPolluted,Pollutantsare notBiodegradable &Toxic

0 0 --NA-- NA --NA-- NA

IndustrialCooling,spraying inmine pits or boilerfeed

0 0 --NA-- NA --NA-- NA

Others NA

17. Source of water supply, Name of authority granting permission if applicable and quantity permitted.

Source of water supply Name of authority granting permission Qauntity permittedGROUND WATER WITHIN PREMISES NA 0

18. Quantity of waste water (e uent) generated (m3/day)

Domastic Boiler Blowdown Industrial Cooling water blowdown6 0 0 0

Process DM Plants/Softening Washing Tail race discharge from

Page 12: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

0 0 0 0

* 19. Water budget calculations accounting for di erence between water consumption and e uent generated.

NA

20. Present treatment of sewage/canteen e uent (Give sizes/capacities of treatment units).

Capacity of STP (m3/day)0

Treatment unit Size (mxm) Retention time (hr)0 0 0

21. Present treatment of trade e uent (Give sizes/capacities of treatment units) (A schematic diagram of the treatment scheme withinlet/outlet characteristics of each unit operation/process is to be provided. Include details of residue Management system (ETP sludges)

Capacity of ETP (m3/day)0

Treatment unit Size (mxm) Retention time (hr)NA 0 0

22.

(i) Are sewage and trade e uents mixed together? No

If yes, state at which stage-Whether before, intermittently or after treatment. NA

23. Capacity of treated e uent sump, Guard Pond if any.

Capacity of treated e uent sump (m3) NA

E uent sump/Guard pond details No NA

If yes, state at which stage-Whetherbefore, intermittently or aftertreatment.

No NA

24. Mode of disposal of treated e uent With respective quantity, m3/day

(i) into stream/river (name ofriver)

NA (ii) into creek/estuary (nameof Creek/estuary)

NA

(iii) into sea NA (iv) into drain/sewer (ownerof sewer)

NA

(v) On land for irrigation onowned land/ase land. Specifycropped area.

12 (vi) Connected to CETP NA

(vii) Quantity of treatede uent reused/ recycled,m3/day Provide a locationmap of disposalarrangement indicating theoutler(s) for sampling.Treated e uent reused /recycled (m3/day)

0

25. (a) Quality of untreated/treated e uents (Specify pH and concentration of SS, BOD,COD and speci c pollutants relevant to theindustry. TDS to be reported for disposal on land or into stream/river.

Untreated E uent

pH NA

SS (mg/l) NA

Page 13: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

BOD (mg/l) NA

COD (mg/l) NA

TDS (mg/l) NA

Speci c pollutant ifany

Name Value

1 1

Treated E uent

pH NA

SS (mg/l) NA

BOD (mg/l) NA

COD (mg/l) NA

TDS (mg/l) NA

Speci c pollutant ifany

Name Value

1

(b) Enclose a copy of the latest report of analysis from the laboratory approved by State Board/ Committee/Central Board/CentralGovernment in the Ministry of Environment expected characteristics of the untreated/treated e uent

NA

26. Fuel consumption

Fuel Type UOM Fuel Consumption TPD/LKD Calori c value--NA-- --NA-- 0 0

Ash content Sulphur content Quantity Other (specify)0 0 1 0

Fuel Type UOM Fuel Consumption TPD/LKD Calori c valueHSD Lit/Day 3500 0

Ash content Sulphur content Quantity Other (specify)0 0 1 0

27. (a) Details of stack (process & fuel stacks: D. G. )

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 NA 160 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

25.33 MS ROUND 8

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.5 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

INBUILT DUST COLLECTOR NA INBUILT DUST COLLECTOR 350

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type2 DG SET 500 KVA 500 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

50 MS ROUND 5

Page 14: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 500

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type3 DG SET 500 KVA 500 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

50 MS ROUND 5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 500

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type4 DG SET 500 KVA 500 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

50 MS ROUND 5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 500

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type5 DG SET 160 KVA 160 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

9 MS ROUND 3

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 160

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type6 DG SET 100 KVA 100 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

6 MS ROUND 2.5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

Page 15: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 100

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type7 DG SET 82 KVA 82 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

4 MS ROUND 2.5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 82

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type8 DG SET 350 KVA 350 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

18 MS ROUND 4

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 350

27. (B) Whether any release of odoriferous compounds such as Mercaptans, Phorate etc. Are coming out from any storages or processhouse.

NA

28. Do you have adequate facility for collection of samples of emissions in the form of port holes, platform, ladder\etc. As per CentralBoard Publication Emission regulations Part-III ( December, 1985 )

Poart hole No Details NA

Platform No Details NA

Ladder No Details NA

29. Quality of treated ue gas emissions and process emissions. Quantity of treated ue gas emissionsand process emissions.

Sr.No.

Stack attached to Parameter Concentration mg/Nm3 ow (Nm3/hr)

1 HOT MIX PLANT SPM 100 1

(Specify concentration of criteria pollutants and industry/process-speci c pollutants stack-wise. Enclosea copy of the latest report of analysis from the laboratory approved by State Board/Central Board/Central Government in the Ministry of Environment & Forests. For proposed unit furnish expectedcharacteristics of the emissions..

NA

Page 16: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Part - D: Hazardous Waste aspect

30. Information about Hazardous Waste Management as de ned in Hazardous Waste (Management & Handling ) Rules, 1989 asamended in Jan.,2000. Type/Category of Waste as per

Waste (Annually) Schedule ICat No Type Qty MinNA 0

Max Method of collection Method of reception Method of storageNA NA NA

Method of transport Method of treatment Method of disposal NA NA NA

Waste (Annually) Schedule II31. Details about use of hazardous waste

Name of hazardouswaste/Spent chemical

Quantity used/month Party from whom purchased Party to whom sold

NA 0 NA NA

32.

a. Details about technical capability and equipments available with the applicant to handle the Hazardous WasteNA

b. Characteristics of hazardous waste(s) Specify concentration of relevant pollutants. Enclose a copy of the latest reportof analysis from the laboratory approved by State Board/Central Board/Central Govt. in the ministry of Environment &Forests. For proposed units furnish expected characteristicsNA

33.

Copy of format of manifest/record Keeping practiced by the applicant.NA

34.

Details of self-monitoring (source and environment system)NA

35.

Are you using any imported hazardous waste. If yes, give details.NA

36.

Copy of actual user Registration/certi cate obtained from State Pollution Control Board/Ministry of Environment &Forests, Government of India, for use of hazardous waste.NA

37.

Present treatment of hazardous waste, if any (give type and capacity of treatment units)NA

Page 17: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

38. Quantity of hazardous waste disposal

(i) Within factory0

(ii) Outside the factory (specify location and enclose copies of agreement.)0

(iii) Through sale (enclosed documentary proof and copies of agreement.)0

(iv) Outside state/Union Territory, if yes particulars of (1 & 3 ) above.0

(v) Other (Specify)0

Part - E: Additional information

39.

a. Do you have any proposals to upgrade the present system for treatment and disposal of e uent/emissions and/orhazardous waste.0

b. If yes, give the details with time- schedule for the implementation and approximate expenditure to be incurred on it.0

40.

Capital and recurring (O & M) expenditure on various aspect of environment protection such as e uent, emission,hazardous waste, solid waste, tree- plantation, monitoring, data acquisition etc. (give gures separately for itemsimplemented/to be implemented).NA

41.

To which of the pollution control equipment, separate meters for recording consumption of electric energy are installed ?NA

42.

Which of the pollution control items are connected to D.G. Set (captive power source) to ensure their running in theevent of normal power failureNA

43. Nature, quantity and method of disposal of non- hazardous solid waste generated separately from the process of manufacture and waste treatment.(Give details of area/capacity available in applicant s land)

Type Quantity UOM Treatment Disposal Other DetailsNA 0 --NA-- NA NA NA

44. Hazardous Chemicals Give details of Chemicals and quantities handled and Stored.

(i) Is the unit a Majot Accident Hazard unit as per Mfg.Storage Import Hazardous Chemicals Rules ?NA

(ii) Is the unit an isolated storage as de ned under the MSIHC Rules ?NA

(iii) Indicate status of compliance of Rules 5,7,10,11,12,13 and 18 of the MSIHC Rules.

Page 18: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

NA

(iv) Has approval of site been obtained from the concerned authority?NA

(v) Has the unit prepared an o -site Emergency Plan? Is it updated ?NA

(vi) Has information on imports of Chemicals been provided to the concerned authority?NA

(vii) Does the unit possess a policy under the PLI Act?NA

45. Brief details of tree plantation/green belt development within applicant s premises ( in hectors )

Open Space Availability Plantation Done On Number of Trees Planted97512 Square meter 100 Square meter(0.10 %) 100

46.

Information of schemes for waste Minimization, resource recovery and recycling - implemented and to be implemented,separately.NA

47.

(a) The applicant shall indicate whether Industry comes under Public Hearing, if so, the relevant documents such as EIA,EMP, Risk Analysis etc. shall be submitted, if so, the relevant documents enclosed shall be indicated accordingly.NA

(b) Any other additional information that the applicants desires to giveNA

(c) Whether Environmental Statement submitted ? If submitted, give date of submission.NA

48.

I/We further declare that the information furnished above is corect to the best of my/our knowledge.

49.

I/We hereby submit that in case of any change from what is stated in this application in respect of raw materials,products, process of manufacture andtreatment and/or disposal of e uent, emission, hazardous wastes etc. In quality and quantity; a fresh application forConsent/Authorization shall be made anduntil the grant of fresh Consent/Authorization no change shall be made.

50.

I/We indertake to furnish any other information within one month of its being called by the Board

Yours faithfullySignature : BHANUName : BHANU PRATAP SINGHDesignation : SR MANAGER (LIASION)

Additional Information

Air Pollution

Sr No. Air Pollution Source Pollutants APCS Provided Remark

Page 19: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

1 HOT MIX PLANT SPM IBUILT DUST COLLECTOR NA

Separate EM Provided No Other Emission Sources NA

Measures Proposed NA Foul Smell Coming Out No

Air Sampling Facility Details NA

D.G. Set Details

Description Capacity(KVA) RemarksDG SET (500KVA) 500 STONE CRUSHER

DG SET (500KVA) 500 STONE CRUSHER

DG SET (500KVA) 500 RMC M2.25

DG SET (160KVA) 160 WMM/DLC PLANT

DG SET (100KVA) 100 SAND AIRCLASSIFIRE

DG SET (82KVA) 82 RMC CCP-30

DG SET (350KVA) 35 HOT MIX PLANT

Hazardous Waste Generation

Hazardous Waste Quantity UOM Treatment Disposal Other Details

CHWTSDF Details

Member of CHWTSDF CHWTSDF Name Remarks

Cess Details

Cess Applicable Cess Paid If Yes, UpToNo No Jan 1 1900 12:00:00:000AM

Legal Actions

LegalActionTaken

Legal Record Of Company Legal Action Details Remarks

No

Page 20: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Application for Consent/ AuthorisationSir,I/We hereby apply for*

1. Consent to Establish/Operate/Renewal of consent under section 25 and 26 of the Water (Prevention & Control of Pollution) Act, 1974 asamended.

2. Consent to Establish/Operate/Renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981, asamended.

3. Authorization/renewal of authorization under Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 inconnection with my/our/existing/proposed/altered/ additional manufacturing/processing activity from the premises as per the details givenbelow.

Consent Information

UAN No: Application submitted on:MPCB-CONSENT-0000081813 22-10-2019

Industry Information

Consent To: IIN No.: Submit to:Renewal (Normal) SRO - Chandrapur

Type of institution: Industry Type: Category: Scale:Industry O64 Stone crushers Orange S.S.I

EC Reqd. EC Obtained EC Ref. No.No No -

Whether construction-buildup area is more than 20,000sq.mtr.(Existing Expansion Unit)

No

General Information

1. Name, designation, o ce address with Telephone/Fax numbers, e-mail of the Applicant Occupier/Industry/Institution / Local Body.

Name AddressBHANU PRATAP SINGH M/S DILIP BUILDCON LTD. BASE CAMP VILL SUKULI

Designation TalukaSR. MANAGER ARNI

Area District40 ACERE Yavatmal

Telephone Fax7898401083

Email Pan [email protected] AACCD6124B

2. (a) Name and location of the industrial unit/premises for which the application is made (Give revenue Survey Number/Plot numbername of Taluka and District, also telephone and fax number)

Industry nameM/S DILIP BUILDCON LIMITED

Location of Unit Survey number/Plot NumberSUKLI 476,475/1/1,475/1/2,472/3,475/1,475/2

Page 21: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Taluka DistrictARNI Yavatmal

(b) Details of the planning permission obtained from the local body/Town and Country Planning authority/Metropolitan Developmentauthority/ designated Authority.

Planning permission Planning AuthorityGRAM PANCHAYAT SUKLI GRAM PANCHAYAT SUKLI

Name of the local body under whose jurisdiction the unit is located and Name of the licence issuing authority

Name of Local Body Name of the licence issuing authorityGRAM PANCHAYAT SUKLI GRAM PANCHAYAT SUKLI

3. Names,addresses with Telephone and Fax Number of Managing Director / Managing Partner and o cer responsible for mattersconnected with pollution control and/or Hazardous waste disposal.

Name of Managing Director Telephone numberSHRI DILIP SURYAWANSHI 7728890610

Fax number O cer responsible for day to day businessRAMPAL PAWAR

4. (a.) Are you registered Industrial unit ? No

Registration number Date of registrationU45201MP2006PLC018689 Jun 12, 2006

5. Gross capital investment of the unit without depreciation till the date of application (Cost of building, land, plant and machinery). (Tobe supported by an a davit/undertaking on Rs.20/- stamp paper, annual report or certi cate from a Chartered Accountant for proposedunit(s), give estimated gure)

Gross capital (in Lakh) * Veri ed * Terms * Consent Fee744.00 CA Certi cate 1 25000.00

6. If the site is located near sea-shore/river bank/other water bodies/Highway, Indicate the crow y distance and the name of the waterbody, if any.

Distance From Distance(Km) * NameSH/NH 1.00 --NA--

River 10.00 --NA--

Human Habitation 6.00 --NA--

Religious Place 0.00 --NA--

Historical Place 30.00 --NA--

Creek/Sea 1000.00 --NA--

6b. Enter Latitude and Longitude details of site

Latitude Longitude0 0

7. Does the location satisfy the Requirements Under relevant Central/State Govt. Noti cation such as Coastal Regulation Zone.Noti cation on Ecologically Fragile Area, Industrial Location policy, etc. If so, give details.

Location Approved IndustryArea

Sensitive Area If Yes, Name Of Area Industry Location withReference to CRZ

NA No No NA A1

8. If the site is situated in noti ed industrial estate,

Details

Page 22: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

(a) Whether e uent collection,treatment and disposal system hasbeen provided by the authority.

No NA

(b) Will the applicant utilize thesystem, if provided.

No NA

(c) If not provided, details of proposedarrangement.

NA

9.

(a) Total plot area (in squear meter) (b) Built up area and (in squear meter) (c) Area available for the use oftreated sewage/ trade e uent forgardening/irrigation. (in squear meter)

97512 2000 NA

10. Month and year of commissioning of the Unit.

2017-09-17

11. Number of workers and o ce sta

Workers sta Hrs. of shift Weekly o100 50 8 SUNDAY

12.

(a) Do you have a residentialcolony Within the premisesin respect of Which thepresent application is Made?

No WORKER COLONY AND LABOUR COLONY

(b) If yes, please state population stayingNumber of person staying Water consumption Sewage generation Whether is STP provided?

15000 0 Yes

(c) Indicate its location and distance with reference to plant site.Number of person staying Water consumptionWORKER COLONY AND LABOUR COLONY 0.5

13. List of products and by-products Manufactured in tonnes/month, Kl/month or numbers/month with their types i.e.Dyes, drugs etc.(Give gures corresponding to maximum installed production capacity

Products Name and Quantity

ProductName

UOM ProductName

Existing Consented ProposedRevision

Total Remarks

Stone Crushers MT/Day AGREGATE 0 0 3200 3200 STONECRUSHER 250TPH

Metal MT/Day WET MIX 0 0 2000 2000 WMM/DLCPALNT 200 TPH

Metal MT/Day DRY SAND 0 0 640 640 SAND AIRCLASSIFIRE

Metal MT/Day HOT MIX ( DBM& BC)

0 0 1600 1600 BATCH MIXPALNTS160TPH

RMC m3/day RAEDY MIXCONCRETE

0 0 700 700 RMC M2.25

RMC m3/day READY MIXCONCRETE

0 0 200 200 RMC CP 30

Page 23: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Products Name and Quantity

Product Name UOM Quantity RemarksNA --NA-- 0 NA

14. List of raw materials and process chemicals with annual consumption corresponding to above stated production gures, intonnes/month or kl/month or numbers/month.

Name of Raw Material UOM Quantity HazardousWaste

HazardousChemicals

Remarks

CEMENT m3/day 400 No No NA

500 MM STONE BOULDER MT/Day 3000 No No NA

BITUMEN MT/Day 100 No No NA

15. Description of process of manufacture for each of the products showing input, output, quality and quantity of solid, liquid andgaseous wastes, if any from each unit process.

ATTCHED

Part B : Waste Water aspects

16. Water consumption for di erent uses (m3/day)

Purpose Consumption E uentGeneration

Treatment Remarks Disposal Remarks

Domestic Pourpose 15 12 Septic Tank NA On Land forGardening

NA

Water gets Polluted& Pollutants areBiodegradable

60 0 --NA-- NA --NA-- NA

Water getsPolluted,Pollutantsare notBiodegradable &Toxic

0 0 --NA-- NA --NA-- NA

IndustrialCooling,spraying inmine pits or boilerfeed

0 0 --NA-- NA --NA-- NA

Others NA

17. Source of water supply, Name of authority granting permission if applicable and quantity permitted.

Source of water supply Name of authority granting permission Qauntity permittedGROUND WATER WITH IN PREMISES NA 0

18. Quantity of waste water (e uent) generated (m3/day)

Domastic Boiler Blowdown Industrial Cooling water blowdown6 0 0 0

Process DM Plants/Softening Washing Tail race discharge from0 0 0 0

* 19. Water budget calculations accounting for di erence between water consumption and e uent generated.

NA

Page 24: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

20. Present treatment of sewage/canteen e uent (Give sizes/capacities of treatment units).

Capacity of STP (m3/day)0

Treatment unit Size (mxm) Retention time (hr)NA 0 0

21. Present treatment of trade e uent (Give sizes/capacities of treatment units) (A schematic diagram of the treatment scheme withinlet/outlet characteristics of each unit operation/process is to be provided. Include details of residue Management system (ETP sludges)

Capacity of ETP (m3/day)0

Treatment unit Size (mxm) Retention time (hr)NA 0 0

22.

(i) Are sewage and trade e uents mixed together? No

If yes, state at which stage-Whether before, intermittently or after treatment. NA

23. Capacity of treated e uent sump, Guard Pond if any.

Capacity of treated e uent sump (m3) NA

E uent sump/Guard pond details No NA

If yes, state at which stage-Whetherbefore, intermittently or aftertreatment.

No NA

24. Mode of disposal of treated e uent With respective quantity, m3/day

(i) into stream/river (name ofriver)

NA (ii) into creek/estuary (nameof Creek/estuary)

NA

(iii) into sea NA (iv) into drain/sewer (ownerof sewer)

NA

(v) On land for irrigation onowned land/ase land. Specifycropped area.

12 (vi) Connected to CETP NA

(vii) Quantity of treatede uent reused/ recycled,m3/day Provide a locationmap of disposalarrangement indicating theoutler(s) for sampling.Treated e uent reused /recycled (m3/day)

0

25. (a) Quality of untreated/treated e uents (Specify pH and concentration of SS, BOD,COD and speci c pollutants relevant to theindustry. TDS to be reported for disposal on land or into stream/river.

Untreated E uent

pH NA

SS (mg/l) NA

BOD (mg/l) NA

COD (mg/l) NA

TDS (mg/l) NA

Speci c pollutant ifany

Name Value

Page 25: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

1

Treated E uent

pH NA

SS (mg/l) NA

BOD (mg/l) NA

COD (mg/l) NA

TDS (mg/l) NA

Speci c pollutant ifany

Name Value

1 1

(b) Enclose a copy of the latest report of analysis from the laboratory approved by State Board/ Committee/Central Board/CentralGovernment in the Ministry of Environment expected characteristics of the untreated/treated e uent

NA

26. Fuel consumption

Fuel Type UOM Fuel Consumption TPD/LKD Calori c valueHSD Lit/Day 3500 0

Ash content Sulphur content Quantity Other (specify)0 0 1 1

27. (a) Details of stack (process & fuel stacks: D. G. )

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type1 HOT MIX PLANT 160 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

25.33 MS ROUND 8

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.5 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

INBUILT DUST COLLECTOR NA INBUILT DUST COLLECTOR 350

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type2 DG SET 500 KVA 500 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

50 MS ROUND 5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 500

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type3 DG SET 500 KVA 500 HSD

Page 26: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

50 MS ROUND 5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 500

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type4 DG SET 160 KVA 500 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

9 MS ROUND 3

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA` ACOUSCTIC ENCLOSURE 500

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type5 DG SET 160 KVA 160 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

9 MS ROUND 3

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 160

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type6 DG SET 100 KVA 100 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

6 MS ROUND 2.5

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 100

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type7 DG SET 82 KVA 82 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

4 MS ROUND 2.5

Page 27: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 350

(a) Stack number(s) (b) Stack attached to (c) Capacity (d) Fuel Type8 DG SET 350 KVA 350 HSD

(e) Fuel quantiy (Kg/hr.) (f) Material of construction (g) Shape(round/rectangular)

(h) Height, m (above groundlevel)

18 MS ROUND 4

(i) Diameter/Size, in meters (j) Gas quantity, Nm3/hr. (k) Gas temperature (l) Exit gas velocity, m/sec.0.1 1 70 1

(m) Control equipmentpreceding the stack

(n) Nature of pollutantslikely to present in stackgases such as CI2, Nox, SoxTPM etc.

(o) Emissions control systemprovided

(p) In case of D.G. Set powergeneration capacity in KVA

ACOUSCTIC ENCLOSURE NA ACOUSCTIC ENCLOSURE 350

27. (B) Whether any release of odoriferous compounds such as Mercaptans, Phorate etc. Are coming out from any storages or processhouse.

NA

28. Do you have adequate facility for collection of samples of emissions in the form of port holes, platform, ladder\etc. As per CentralBoard Publication Emission regulations Part-III ( December, 1985 )

Poart hole No Details NA

Platform No Details NA

Ladder No Details NA

29. Quality of treated ue gas emissions and process emissions. Quantity of treated ue gas emissionsand process emissions.

Sr.No.

Stack attached to Parameter Concentration mg/Nm3 ow (Nm3/hr)

1 HOT MIX PLANT SPM 100 1

(Specify concentration of criteria pollutants and industry/process-speci c pollutants stack-wise. Enclosea copy of the latest report of analysis from the laboratory approved by State Board/Central Board/Central Government in the Ministry of Environment & Forests. For proposed unit furnish expectedcharacteristics of the emissions..

NA

Part - D: Hazardous Waste aspect

30. Information about Hazardous Waste Management as de ned in Hazardous Waste (Management & Handling ) Rules, 1989 asamended in Jan.,2000. Type/Category of Waste as per

Waste (Annually) Schedule ICat No Type Qty UOMNA 0 --NA--

Max Method of collection Method of reception Method of storageNA NA NA

Page 28: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Method of transport Method of treatment Method of disposal NA NA NA

Waste (Annually) Schedule II31. Details about use of hazardous waste

Name of hazardouswaste/Spent chemical

Quantity used/month Party from whom purchased Party to whom sold

NA 0 0 NA

32.

a. Details about technical capability and equipments available with the applicant to handle the Hazardous WasteNA

b. Characteristics of hazardous waste(s) Specify concentration of relevant pollutants. Enclose a copy of the latest reportof analysis from the laboratory approved by State Board/Central Board/Central Govt. in the ministry of Environment &Forests. For proposed units furnish expected characteristicsNA

33.

Copy of format of manifest/record Keeping practiced by the applicant.NA

34.

Details of self-monitoring (source and environment system)NA

35.

Are you using any imported hazardous waste. If yes, give details.NA

36.

Copy of actual user Registration/certi cate obtained from State Pollution Control Board/Ministry of Environment &Forests, Government of India, for use of hazardous waste.NA

37.

Present treatment of hazardous waste, if any (give type and capacity of treatment units)NA

38. Quantity of hazardous waste disposal

(i) Within factory0

(ii) Outside the factory (specify location and enclose copies of agreement.)0

(iii) Through sale (enclosed documentary proof and copies of agreement.)00

(iv) Outside state/Union Territory, if yes particulars of (1 & 3 ) above.0

(v) Other (Specify)

Page 29: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

0

Part - E: Additional information

39.

a. Do you have any proposals to upgrade the present system for treatment and disposal of e uent/emissions and/orhazardous waste.0

b. If yes, give the details with time- schedule for the implementation and approximate expenditure to be incurred on it.0

40.

Capital and recurring (O & M) expenditure on various aspect of environment protection such as e uent, emission,hazardous waste, solid waste, tree- plantation, monitoring, data acquisition etc. (give gures separately for itemsimplemented/to be implemented).NA

41.

To which of the pollution control equipment, separate meters for recording consumption of electric energy are installed ?NA

42.

Which of the pollution control items are connected to D.G. Set (captive power source) to ensure their running in theevent of normal power failureNA

43. Nature, quantity and method of disposal of non- hazardous solid waste generated separately from the process of manufacture and waste treatment.(Give details of area/capacity available in applicant s land)

Type Quantity UOM Treatment Disposal Other DetailsNA 0 --NA-- NA NA NA

44. Hazardous Chemicals Give details of Chemicals and quantities handled and Stored.

(i) Is the unit a Majot Accident Hazard unit as per Mfg.Storage Import Hazardous Chemicals Rules ?NA

(ii) Is the unit an isolated storage as de ned under the MSIHC Rules ?0

(iii) Indicate status of compliance of Rules 5,7,10,11,12,13 and 18 of the MSIHC Rules.NA

(iv) Has approval of site been obtained from the concerned authority?NA

(v) Has the unit prepared an o -site Emergency Plan? Is it updated ?NA

(vi) Has information on imports of Chemicals been provided to the concerned authority?NA

(vii) Does the unit possess a policy under the PLI Act?NA

45. Brief details of tree plantation/green belt development within applicant s premises ( in hectors )

Page 30: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

Open Space Availability Plantation Done On Number of Trees Planted97512 Square meter 100 Square meter(0.10 %) 100

46.

Information of schemes for waste Minimization, resource recovery and recycling - implemented and to be implemented,separately.NA

47.

(a) The applicant shall indicate whether Industry comes under Public Hearing, if so, the relevant documents such as EIA,EMP, Risk Analysis etc. shall be submitted, if so, the relevant documents enclosed shall be indicated accordingly.NA

(b) Any other additional information that the applicants desires to giveNA

(c) Whether Environmental Statement submitted ? If submitted, give date of submission.NA

48.

I/We further declare that the information furnished above is corect to the best of my/our knowledge.

49.

I/We hereby submit that in case of any change from what is stated in this application in respect of raw materials,products, process of manufacture andtreatment and/or disposal of e uent, emission, hazardous wastes etc. In quality and quantity; a fresh application forConsent/Authorization shall be made anduntil the grant of fresh Consent/Authorization no change shall be made.

50.

I/We indertake to furnish any other information within one month of its being called by the Board

Yours faithfullySignature : RAMPAL PAWARName : RAMPAL PAWARDesignation : MANAGER ( LIAISON)

Additional Information

Air Pollution

Sr No. Air Pollution Source Pollutants APCS Provided Remark1 HOT MIX PLANT SPM INBUILT DUST COLLECTOR NA

Separate EM Provided No Other Emission Sources NA

Measures Proposed NA Foul Smell Coming Out No

Air Sampling Facility Details NA

D.G. Set Details

Description Capacity(KVA) RemarksDG SET (500 KVA) 500 STONE CRUSHER

Page 31: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

DG SET (500 KVA ) 500 STONE CRUSHER

DG SET ( 500 KVA ) 500 RMC M2.25

DG SET (160 KVA) 160 WMM/DLC PLANT

DG SET (100 KVA) 100 SAND AIRCLASSIFIRE

DG SET (82 KVA) 82 RMC CCP-30

DG SET (350 KVA) 350 HOT MIX PLANT

Hazardous Waste Generation

Hazardous Waste Quantity UOM Treatment Disposal Other Details

CHWTSDF Details

Member of CHWTSDF CHWTSDF Name Remarks

Cess Details

Cess Applicable Cess Paid If Yes, UpToNo No Jan 1 1900 12:00:00:000AM

Legal Actions

LegalActionTaken

Legal Record Of Company Legal Action Details Remarks

No

Page 32: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

lrrcmqfr,"rffim.q,qrBl'' lzots

ffisTqts{*fiFlrak{is{D/ o4l201e

qq1 - q56E'ivrqftq3reT{ 1fr'firffefrfrqc-{ ) fr'qq zot:

3Trivr

n. ftdtqfrtgdirffik tilcl€siff 2s00 !n€EEITqTrfrurEftEIrdtqnuft Adt

,G. et* qFpft Aite.frlT uft-q qrfi{ vcTm sTrt

sTcr'+qis rgfrqssT"t E<r*+Eqlur qRT

qqiirTra- {6rrfliI (}lH

361B)tsqr'6Tqts{-dr

ItEq *srftR5m.c-trliqnftaqrs.frrrei. 60/2 t{ o.9o

tsrR

2500 qRI

rrfrul 25OO HRT

q{ lrmsl 2500 ila qsrr gGii q@me .nrrutrq ( ggq ) E(wHqsTEEs

moqr+km srfr 'e't].+ a trm qiriqT v<un aw tsa qrffe sr&q( sTFIr$ qrdHl ipqia tc e{G' qr

! {qrqql q-{d 3lTeclrqr fu -+rqnrq q* E-St c{f, {rfr -d.

b*tA--* wt ro,ilo,oool-fr+im ts.o+ zots srq+'+$IT

e{Aevrfi:-

1) c€FilrrRq;rs ffi efr"q qd-trf'fi sd-{ c-dE-d wrftr eqemi-fr s{q'{l![r rnun amft

enqTmi-o.

z)qrcTakft gca {rerar fr-ql wqrqT rE grqrs q4-c qra"ry- fo-W-**'**+gQ-er g*i erer+ i;t'er u.e< gsqr zr+T qI fi tqr drq q\'q !-fi k ScoT

qrdr+' -

:l iqi-r qrr*r-+ ftd-sr gq-fm uFNT+ 3-rerq q *-@'rs Hi;n vEr gca araq+ tm iqT{ il$e.rd6ftdT qFd{ q1e]q.rff qTfr Elri-d dfrq q-iqr4rit q<-if {q-eliil( Erufl-cr ftlw-fi eaaqqT

Efrwqr qt*Tt* qlt qrfiff <r$-d.

+) qanx rflE .ft ge,-a-s "n

nw s qev cErd d"qagm{ qqlfr-di {idEr-d sHc aIRtq'rA qidt

!€rirft i-scq qst-As *toqrc qrff .

s) I.IisrrsqT *a+* m gqrad 311hn:i{n qFr*n rr(srit csq qtun lr{rfi eTi-cl d+q

{rFscr* {qrfu 3nffi H}* 3r-rqrcq qtr} uri-e eraqr g{ wcr c tdl sTlqm HqrdT

qrqmr rc( mrrqid *fu q fl A'& sc€T{ t erau urq{ $M *n-cr$ I c-6RrY qfi '{ Trdsf,

{tm tqee ifi-{c x4 ( !e ) 4. IqR*ffi *,{oqid+$€.

OuTfrst-+ cf,MrS eraqm 6{++d v-e'q qre{Td-i-d q1 onteaqt vqrfrm *d-el wmc

$oufrvvnan63nqqu-*urt7)xrq-fiq 6rCrmndr vff'ffi sTrqq-q.fiAT t{RrFTIq C€HI TE mq-q qfi{ xngq qqr q;{o-qffr

iid.8) l1qlqrrTRsri q{q.Erft ftdeT qd-fifr 3re;Hri ei-rc g€ flr€iim l{ ffi fttq qr

eTqlcqrqqrd-dHr.

9) {r1Fr€d{rrt-r fi;* qeflfr-s61T{5-{';mfr sTrfrqyrggrels' ererql sciffi Wfie{rffql q'T

i,eru' qr+rr {q *ruqrqreili 3TRrdT{ ** ffirmt ui+ nq+ H enta.

rol rffi 3t-8 q {rffqt} q-q-d 6$qri sTRIsR 3Tq( ftrcarMr rre-dcla qiff uqt tcS

?]TEi.

i r 1 fr -.o ururo,i qfrfr t qrqI fta-eT era q n-fi i qre+

w _"_

Page 33: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

, r., ffil#;**n* * u u-ff i qra-q qd sn }.** dtr+orq nfe'

I:l ffi';;;; "i,fi"" 1 3ao is€iffi a**qr&qr,.<*-d.qrfr'

10 q{ft.+trnA qBfr{ er.r+ -Ht **t "n-+'-a

v'ur+ qreim q-+BrnITI'+ t'xu eXr+

''' ro t*et .,i* Sg{q 3ls{qq{m titr+*ne'n'fi9'

r s) q-tttiq'froT ufr-q * f to-*'* u frft-qm; frqc q "

q r qGrm fiqq qq q q\e qqt Erd "{

' ttfr*r."*foqrd t'd 3ile'

rqr F{qq qq q qo el=} fu*" 3{r&@T ge's rsrul rr(qrelkT 4ffi ffi E-sql*

'' W"r-ruqt$ uH s-6Ttr'{tHT sTftrfi 3ru!Trr+t6'

,0\ qrqr;ilqrr*r]-d *,"l""*ftfr"* "n*-t *ttEqrfrGqlilt fi-d qn€' dftcE.{r'i

"' ilL,l**; u f** +e.* "oq-s

qiqTdrffiTa ffi ,.,*q'

21) qrcFlrdr+ d'lifi st-dt# "t'

*+-n-" **tt frfi {R' rsr'qd' q-fisrq' qsc$'

taqr,t {. ,r* r=r* ft#,'; =-*" "-* {r8r' 3{Tft Ehffi qM'ft cT-d,ItdT

t+) enls-d *=r aq fufl:IraT e.rd 3T{r€IRI a q+ ftqHT-*qT *lfr sTr$q s{sfrrq rrtqmr

mo1aq6roer-dlim. r --,:-_;o---.'ra rrftFr

ET*mqqlTnqr$.

22)ciqHItIRs6I,qrqraTarigerftrAq@t*".-A='4MlfiqF]qrlq1-d+'qr-d+0TT-qTv-&* uFrsrde-d ""w

#""T-# ti" ' + qm qr ftdcld ftRa +r'qm eR-€I

il-g{gsn}rfr-f,.

z:l .,ffi +*- ft-+fi *losrd' ti6'

;i ffiffi l.#; s* rydq9=r"**6wq!dnqr( <.$'

25) dr*fr iq$"rrA s-trqr q{tqm nqr{ ar$'

;] ##'#" #" * t* *-" * S I y* a* f nar rrc$ m*-*i ff rqr qlrq 3nTr

lu. *t-o11 *rln-s cmrs eTEq6 at$ qr$er

,r, Sruffi ;;,#"#; *n-" ""* sgw fifit rcl*sT&

qroqroi'd-o.

yftrdff:-q. gqfu{rffq g{ftr+Tftsctdsqiqrckffif,T 3T}fr( '

l. n6*e<n roqiq qiilcrR-ffinr 3{tft-d' -

i. -*a t-S.-.r+" a-tkf,qx cErT ie' qim qrkfr aeTr 5#d *lffis-e rffi

;. ftd. c-;d- fr . dS <rqqrm qcrt elqqfir fi-q{ qtcr crtrfi wr g&d

fiffi 6kdT3Tifr'"d.

)L&trffi,w-tcta

gffi\oGtif,cr{f<5,{)

Page 34: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

-\ne4ft,titoli,tnsr;n875?,:o r o

ffia+Tii+mlaq rqaqra

t+{is 63 / o&20 t 9

qrqr: F6rlrq,ilrr sfrq 3i{*{{ ( lifi€s itfi_4F{ ) fifi 20 l3

!{rt!ri ffic1+<si{ftfte 'i na qi+ 2s00 ErF g6c qT rilr lcFi3r4 ll.l!fi itd

3G. aifr clr!ft ++&'itrGffq uEid snrl &rlL

+qrFRg(fi. q.6rlTki&r-

srq'fr]Iz:i 60/2 +io.9o

( 36C ) t€.ri E aln(6

floqr*ftdrEiid{{q{drfiilT qlqr6[{+5{ €rd'{ 3r&q{ 3l{,Jr{ caaFrlrafitd q,rl qr

ctd'aTd S{d sri{lqr ftiidrctq{ C6 Ffri !r+d rr$-d

3, €rft-(!tI{ iqi t o,oo,ooo/- iilt6 24 ar?.2019 srqi q{qr

D cGrirql6rg:iaa& E+q qftffi i4{ 116g( 3nlir eq 3r{++ rEalrlT rrqr }rqt

2l q{?r.qFi rad tqercr f;cr qraiqr 1z erErs s4_{ cr6 ararF &ac$ rrr"mtm*r}

nt*er gdi -.lc{r a+dr ss,cr gsTr a6rar iiilT arc qlra r6ft tqlr srir+il q{qr{r rna6i+ ft:+taT rfa&d !?Fcr+ Fdi" i }*lg ai{r !;Er r.d Er6fi }dr ilqn 4r#

dl*frnr iEi q{arflff'!ar* drhn n+$ ,n"rartfr r.d i'r.qFiir rcT'fl-dr fir64 3rf+arrqfi-drdr cr6n+ qltqrr# n+d

4) Fd{rg larq,ft *r&c qfrfiqc 13sy cE'd (gd:€ll g?rdH ridF{d Fff qFffi qr+q{ari,ff +5i? EFd}s 61rq]ir ql+,

<t rner*g+ dd nr g+rir 3.rilrHsr }f,':Flr T€r'n 1iEq ,.r"n ffi+r d+d nsswsiTd nqrflF 3nffi Hi"n s{qrcri 6lri ar+r irau|r"i rfiI r tnr 3nrdr iri!1in

!lqlr] a< srr4id Aid s 3lid ..{*ri i c?a slTr dsotr arat / rdmq i1ft"{ c-6ta

{ifidr l3 q€, i liqq y/ ( s ) a a lmr sr{drfi Ertr,rrd nif, .

4 ofiitJ EFrnr+ qli(5 fliH rd+ ard*ir+c qr aniozqr cqfrIa tdnqr !]ls{

Ifid sFq qr{dr ?!} 3n!1{6 e.G.

7) rrffiStq 6rcr+fafi id_++ qra{46ir iiq@m rRqHr IE 66r q+i rn{i qql flrqii+ir

s) ,rGrirqra4ri q.drirfr 1i&dr +fi{a :r.er*i +rr g {eiidr < ,iqrdr3} Eiiq qr

ol ffq{R{*r{irfl prfr6{ {{aliFrfi 31d.r clF gr@rs 3l{4 3,rilm $8 q {ff { q,r

r-rq q.dr:r.( 6.-r+dd ','u Er, ",{, -nrdr.{- rq, ira '"1i-

l o) *r!t!!it .dt r rrfr!* rtlr i!,!]l rr&it. $qt Mqitt ttifl! qf+ {lqr H31rid

6rqT+riq ],gftnr+n

56q

ctq

Page 35: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

14)

l5)

l6)

tr)

r8)

sr}d-a ** m ftrn nqr <,m 3illrsrs q fi idqn6<{ qt6 },rAc !ffidls qaqnr

arcq"TrdtRsrzlrdrckd3raqlrd.rlcrff fli3r+i4rqiitrr6R6 ndard}a4lc fiIdiiTErd+h 3rfifrqq 11 .. i :r<ifi i'l'm ir+ qFfl <tinr qiii{--ir4i; rn:F --:-? e=.- G-l?i fu ,r!F c-{T -.fu!rrr. }E-rF2\,E;.,li:F-TE- m .r,r,irB,?F6rrq,i!r lgfi-q Jn-ii ( EdrFshfiTril fi-fi ?" 1i qfudfrT4 sq s qs:rqiEifrdrrfis{q{sTrT*qrd+d qrl,

19) fi-4q ql q q" eat l.arn 3,'r+er rd6 cl.r caar;qrd aiqiqa H r*caEftgsll],mrqr*ff q.6Tft-.dcrr qfu6..rlr!mild.

20) c_Grirurorlc{ elrwai* qifrd ssrc qMr crftrnqr &€iffi t S* c+d. arffiii+r;riE s-E+ ffi r,ir'ara an ,rqra ?r ra7.

: Fd=-ni q*-l {d-i" + rr-6 rrr.I i-r .|a . rEl..r= "Eerq

?qir4;€E i rli:t iqq ,lz;ia ,l- c..Frs F4F rrrT. qi, +vnl.l Eri,i ltEri?T

_t, r.=Fr;p= i iqa? ri:r ?- .nr;; ,=a;- +ffi p*r,r, eaaue nrr.zri=E G=;Fi6l "EG-

-rq T{-{iw i+ c ,r qp { ?aEir rd+{ E)ra- r,lirdra.daEr( 3rtsd.

23) rcrqarq +c6 fi{€r s1.qrn}ld.:r , .#r f=r .i.i-+at p'Er d+ c# rc-nl+T tua_ qrrr :rd2t 4]Ilq|*4qffi li-q{ Foqnfuirr n*-o, ...r,ri €F- piq{i, Ea df qi -e^ -a EEar F Ear E€J r{r+} Ea a,q },Ilt

.dr crqra eT .ai EFq lrrr* qrB(s:d qT+d

'- r-s. a-rt ; =F "q i+qr E{-d. di 91so ?TrF ,=n _p?r .rvr{Ern4

6{dqrd+#6

srf.tv'@68?

I :,rffqFffaq-FrartrjrdsqiircftdHff 3i)6.6

?. 6+.f<I.cEnr"qiir{rfuffi{nr iT+fud

.. - _?i':..P Eri T.r- -.: E{- rasfrf qr=ffid1+F d-cE" rr rr rrr rn, ffi rh .rn crirnr i-.n [araal:iarff *frdr 3{ifr-d

r,l;.ft e*rr-t*re*.r*rra

W*

Page 36: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

*. iF:qn n'ota o aft 47-91oGrcoRr+rit *rqfoq ceacra?o 6; a8 2a,a

El?r, riRlY rirr Efiq s?Err ( fr.+rs q Ef++r+ ) fi-qq:o L I

3n'*r

t. ffiE &cqi{ ft{'e:E inlrd qi* 2s00 FrF g6q qIiur cM crM iidT -gla qrrl d+ii.l c.fon @r+- lEri,,ra.

36tB)isqr+etRng ar. ro,rienNcrqrft,rz:i. 6oE +, O.9o

i.qn!.{,r

-2500ir{r

g6c)ssfiE4nq6flr4r6ftdr F6idm s {dr 6tqr qrqr +F{ +s{ ETd-d rrtcr 3T{sni E{am t"qn +o 3llt, i,{qr4+T.d }r1i{l.qr ftrr6lcq{ ca.Fd.+ c{fr llfr.i..

3{) Rlt{€ill nc4 Io,oo,o0o/- ji,ri6 t4.08.20l9 qir} |]Iolr

1 ) q{a]il!'raarE @ il+q i+ffid Edr {d!a 3rftr ir,r c,{er& iTfiflET qllrf sr"fr

) qsrqf Xrd riFels( E-c] lTar{r R gr€rr.q+{ r(n qr" nqq:fi lGnrqrafif

$8er g8i !-d!-i{ A+oT q.ccr go-+< zmnr trer eru +l r+t {;wr fu.3) lrarr rnl66l{ 1i+@T X<,ftd G.ffi cdq{i i +el{ Fi?r gir Tr s,atr +"r i"m irfi.,r+n-rra- ' i;G ",E-ad.,?-

.q4; ;d-i"1 i,rq+ {rFer€tiflE Er*r,+ pfrrd+ !r&d

d aHrrE- 'a?F

c3r+E 1r4f-q,,3r. q,I. ?TffJqf a!-+d I-d$" ftl, qir4.t q+cIaEry {5{qgq B6,!qnqr*

:, :t=n:F ir#l Tr q .T-. r;ry: ."i;a-r 5*e rar qr rra{ aird +q:-E-i €r- r+rr;;E+"i ;T;rr= +-r." -Fr;t traln c?i E-{ .r iar rqr -raqrfi.r:id 6.r '_6r:,:,:,qjr; ]raq eqa,.E,T'er.an qriElArqia{+r i"rr'?ac y.. 3 i d z 1{, {ff sE{=t+n

'. 51* El- a?.dq 6r;ai s?iE "-Fainn r ardB-r ari, a-ar ,r{,r* o lafiq cr+er ii $rsr{6 sni.

1lnrfiq 6rrn4ftdr q{'ffi. }'rs[q6dr r]F@rF ram r( qnr q,ft{ wr< wt *uaia+id.

8) tr.cm.'r.6ri ,{ql{ fr ft+dr q+{d s€{rd arq {n qI@ii ir riir.cre R+d qrfirqkq]qc]Edlsr

9) {lfr+sra{lfier +*fi+ <n<c+ wfr qrdq 9rF fl@r€ c,iEr 3q+m q&ayffqr l+r*mq,rGT{T rq 6{.arqr{ i qfir6R o.,qr Ficrftlqrfl qi* nqr:E& 3nid.

lo) +Frer& 3,* a rrffi r.d 61!qi o.rftqi( qcr ffi {ddqrB qi* {€i:d&wia.

r l) fr€rrsFr+rqTlFrd}qr{{Rer sdeIIff+lTfi 6{rit ctr+ffirql,irrrq,rrorffa.

Page 37: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

rrr) ::n+dd +, E{ fuqrrrqr drtn }rret€ E T{ funqrfiqr 6rS qrdc a{Feru qiqFr

,rcc!T{d}t+€TarqrcFro3r&qrrffiqr"rq6{}3nii6rqiiqrflf rr+dtj?+ "r-rT -fi&F lTr'{E ql.

" ! rF@ <rr Tt {+ dEr ,qd.

fiElm,rri qFrffs EFJr e{+er clq,t qf{ffi Ed6fi flniir eciiflr+ +ffi drri250 fta{ iim {iEds g€{{ 4{!}itq{fir6TA-o.r6rrq,ior €Ei ciqi{ ( t{firs q iififfi{ fi-qc 1o!i qfudff.qq qq q qs 3,Ei rlT!frd

t5)

t6)

l?)

t8)

{l#c{ lGrar ?"srd +d qrt,

19) frqc q1 d €," sdq+ ?rqrd :nSer rd+ orq qasrqrd qM M a.cqr*5eir.rm -IrrSe}frWffiAr qfr.6 i'q!mira.

20) !1qEr1nl*ri Fd 3iqqdi+rrfr&sqc arMr elFrnqrfu.dqrdi ** or$e, erffiffiffirtE&_crffi :{furF6qiirnrffiraftdqliii.

2r) c1?liftr.6 aiaifl €rffi6.*, srffi.q.ilnaff fiaT,iR, {sr,ira, lrfi{rq, iE{{fl,)# i. lql Errs frr.d_er srid sFr+rc 6rom ir$, qFr +ltrerd srq,fr cTf,CSiT

:: , rrrErrr,; dr ErdErd

=,r i+€l ;-:Fir ar.{+q +l!rali1 ,tE{F qrairE4n iM-,r

:Fr4 ci-ii'F q=Ti_ q_q :rg@T!A ifo , i cq q ?.T- i+- {r{= rr+q

2l) cloralq+{d ft{€T6{Eqrn }l€,24) +lrfir$gEr/dqr-qlqrg{qr+fi aHff sllr6rcaaqnnlnriTd.2, 4M qqd!fii iFiir 6(qqrd lnI T.S.

20 #S qFis Irk-i} f*qT FIr$ tB qi} qlsrn F R-qr fu rcqfi trcT q},c affrBa fl-d,F9a:, g.F rrar+ dr61r a=l ,rrd

27) +fr4 rqqlr ftirq nBdii 1+'6_d A+fir cqE-d q+ !T!r fi.ifi-d 1r6l!1ard iq!-+rn

"Grid cftrqal6o

6 l,9Ir FiFilftaitqqanaqFffi, dt

i. icErrrfl-a qM 3q{+ssiir qfd-#4ft-fi i{ift..d

r. ndd=d-dTrr6r4is qjiT crFiffidr qiifrn). {rd tFq, !]Gd -S.{ir, [<Frd ,ia rfFd .izr q*r yrffiqs rdEl

\ ,,r e-E'a--aai,+ ,",4cqraraF arl-iF. qa.,r, +rrrtd.ftrrf*dv +Tffi 6tdr j{ifta

-@iQ-e-,6dc€fdd'

4L @.1"*

Page 38: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

x orvrfrrt€ftffir q NtfrfuL Do te

fra6Tftiq.rt q-rcrffl qEkrrna

tqr*.oJ. t rc nov

ETTUT : - q5RY ,llur sfr-q scwm 1 fu*rs A ffi+rr4 ; frtr:+ ZO t :{<**

snqvr

t. ftdq Mq fr,fik q}qTo q1-fi 250'0 ErRr gsq *.tr"1 qffi qrrruft affiqG. iqt* q-nuft aTN rirr trfrq qr-*fl sqrfr ent

flqriqiq rqfrqyfrR sil*+Bflq dRr

qckrrlra- q6rrrH NH3618) iis-qr

q6rr qtqTftrq{f,T. rror'rtqtErf,

urqrft.rei. 6ot2 *a o.qo

tsrn

2500 ql-q

(rs'sl 2500 qRr

q1 {rffi qtoT 2500 qrq' rilur sf{q ( 5sq ) s.wH q eT-q-*'

owq-mftnT r-qrfr-cqrr+ e {ffi q,{tq Trur q.sr tg,,.{ G'rS-m ir&fi 3rcen$ q{qmr foqrf, }o e+rt. qr

qrqrer* gco 3iltvrTqr ftqlw,nq{ qs q6fr qdil tt*f,.eq erftratr+ wt t 0,00,000/- ftffi 24.09.2a19 s+;qt q{oTI

erfrevrfi:-

l) q{-dmnrr*.rs ffi rt-q qm-{-qtf, qffq rrffif, onFr cr.1errfr& 3ry qrun srr*

s-{Ffi orrrfl.

z) qcrqr* geo riverm fiqr qrqr+r'{q sr€qffi qfta trqil ilelrf, Alqfi qrqr+qrr*rt

g{frqT gdtt sqe;ffi atrf,r uq-sr ffiI T+TqT fitqT Hm SFq r*fr 6vut werr}.

3) rrrqmr ?n(fiifr ftfr€T g{d" qffi virffiE q a,qr€' Htq'r g€r gdm q{ kr nq K qr$.

mrfiftnT ifrq q<qTqrft qrfr f,rtf, fftq qrcTffi qqa qqendilt rsTun-d{ f{rcardr 3rsfr@'r

ffiqrq( s{sT{* Wi qrdfr {Ifti.

4) H6T{ry urwft gflfrs s{PTfuq liQx qErf, dE.c ',fi'{qTr

ErfrS ffiRrd qqrq sTRr+rt qi+

qieErfr +grq gqT-dts qrrqrd qrfr.

s) wqqrsqT ffiM m gtnfu e]t{Lrffiii s{ErfiR {tsr* {ffiq rfiufl lTff* dri-f, atq

xTrqqr* gttrflH qTm aldM %{qr€q 6rr} drtf, eraler S+ W* q tdT }r{trf,I Wtdrqrqrfl rm muqin t'to e flffiBc€q{t 3TatlwwsMq.rtqr$ / ErdKrqqmq q-6gd

rlfr-dr qSqq Aftqq y4 ( \e; a e guneffie.{uqTfr'Aif,

6) Elkqr-{ uFmrd il-dqr *Ttffi y&fi qw{rdq-d qr m.r+fqr vqrFrd +fr-qT yirf,{

Tfi'd qkq qreiqT tfr +rrryqfi +Trt.

z) vnq-fi-q orqrotrr qfrffi 3il?[TeFFm r{r{rFIEr q{qmt tq qta srfr+ trrcrq srqr mlrqin

tia8) qGErqT{66r} q-rdnrft R@l qtr-*tr Tiqr{t q,Tq E€ HrsFiar <q ritrcqr$ ftqtq qr

flqteqtqqrdErcn.

9) vns+ Fflrrc-{ ffim Fpxfi*' +-tr{rcmr *6 +1r&v eTs Hrgrur 3{srfl sqfrm sr& a vtfr qT ii T

iFgFF qrqmr G 6iqrqrq-d=r 3TRrfiR eTR ffiIq.Rr ui<r qr t+o 3rEd.

r0) ffir 3r& e {ffiq* eqq q,{uqr+ sTRrffi{ s1q{ ffi *rrqra vi* tq+ H3rTtfl.

1 1 ) fradT urur*rq qfr=fit qq{ frfr-€T er& e {rfi+ qroq qru} gflac-fiel Eitffifirc*, {Tfr--fl.

Page 39: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:

l4)3Tra-&-d &* q+ firrman f,irfr +r{renq q q{ ftElrq{ qr& +nfrq er{rerrs qrqmr

nrora iq q'roqrn i{o.t slrr+iur+fit fr&-sr affiqErf, er& e rTff+ qr€H *-{u} qdnfirr Eicr{*.Re" {Tfr-d.

loutdq.rq q.Wiql qqffih 3iftfiqq lteo q r+nftq +i HT{Kr l1?e t RiT{ dqr{ rr$qrql qildT Eqter,

rzy++h+r'ni qft{q €Ig{ qq-e@r urq.,rft qfuSqu} ver Qerm w-tr gd'q BrcT{ *.fiT

+ld. ilSq scu;rt fii-dtqr af+TFTr+ t*m e1g{ Q o fr6 sid-( m:6{q Bccqq $rO

"itr+*-no r$e. rfrq ++ ftErrni qt{rdq rnlT ufr-e Erdg.fi ;rrm forn qrfr.

t8)T{ foflqri e* elna 3lq-A-flT sn}frd rrat ffi io fra std{ dW arti Sqq s{qn-or$ e qflqrfi/T{qrf, qrqT {gffi fur vtwfi Gi-{flEr qE{ sri Eftrrmr.+. {r$o.

le){drry'ilur sft'-q wwFt ( kflq e Bftqq0 frqq to{Q qRFm fi-q-q qq q qs 3rq}urffi-f, Yrtr-q( qwqr furd td 3iTt,

zolfiur \3 H Qo erqt foqrd sil-tr€T yfu uTsl y{qrenil qM ffi c€qrrft

guqmmrq{-mtiH{6rft rd{tqrTerEr*.}rfi urrciT-fr .

2l)tr<emqTr*.rt u-d eilqrdi* qTfrfr uqm +Tffi enFr Eqr fr5eTd t &{ q-tfi,

er1trerqrt ffi e frmr ffi€ BTETffi qtqr armra ftnft qi*+

22)qcdmrqrfi effiS vtffi-fi rd, qrffi*. EqTrfi fiiqr {R, rqr,Tr&, wlTvrrl, <marqft,

\cqrt q. qqT rr:il:s FrcfuT 31p6 sT'rfirq q-(orR {rs, silfrr eM qrwft -lrd[tfir

EET.irqqq-RilET.

23) qc{HrtTFr*. Et, q(qlalril rEt ft-Aqr ffit qrag.fiqT ffi qrmr+ qraflr{rd +un -

qr vdq' uFMI*qd eieitr qrs qquqrqE+ t$tr e fr qrq qr fu-il fdkd s{wnd 3trdiqT

asq "ilfl€Ti

3Tq-f,.

24)urotrrlrr +{d ft-qqT mrqro irro

z s I ffi SffaT I "ftn-qlqr grur mrn +ffiS IgTUFFrq m.uqril foTr{ qr-fi.

2 O eM q;q-ffi e-iq€i-{ firqra turn qr61.

27)qffiS uft-q uqat ffidr iqr* sr6 Es a} qrsr& p*, fr-+r ff drsq-fri ffidr qlrq qrn

{d( qrmit ru{ trfu uror* erqr arm qT$€.

zs);fi{q ry fu*q ffi tq-ed aft{r qqftn wfr qvu frqB-d wuqrqr$ Bqrq r

qruqraifio.

srffifi:- ,*fiF*@q. sqhrrn-q sTRrfirfr sqits qiqT qRffifrr 3Tifud

, .l.r6qrsqn F6ITr+ qr+ qlkffim 3Tniyd.

V i. ilflr& ftng{qT+-fr iloRs{Krdntqqtnqrkfi awgdee;rffiw*r+r+x. ffiq Mq fr" dfi {rqqrf, qqn ffirrqftr ftK q'iqr qrkfr aw gde

(@6Ae.

q.ffi qrFrf,roTifrd.

#M,

4,,

Page 40: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:
Page 41: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:
Page 42: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA:
Page 43: INDIA: Accelerating Infrastructure Investment Facility in India … · 2019-12-26 · Environmental and Social Due Diligence Report Project Number: 47083-004 December 2019 INDIA: