increasing reliability for industrial applications · 2018-04-26 · loads testing accelerated life...

25
#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC Increasing Reliability for Industrial Applications Kevin Knill, Director Solutions Architecture Adamantios Mettas, VP Business Development HBM Prenscia Solutions

Upload: others

Post on 07-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Increasing Reliability for Industrial Applications

Kevin Knill, Director Solutions Architecture

Adamantios Mettas, VP Business Development

HBM Prenscia Solutions

Page 2: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

About Us

Prenscia Solutions is part of a global engineering organization • A new OSI Partner! • 6,000 companies served • 25,000 reliability and durability engineers trained Empowering decisions through software and service solutions to convert engineering data into actionable information to improve efficiency, availability, reliability, safety, durability…

NASA

Delta

Kuwait Oil

Ma’aden

Ford GM

Caterpillar Honeywell

General Electric

US Army

Lockheed Martin

FCA PSA

John Deere

General Dynamics

Page 3: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

3

Reliability, Durability and Prognostics… Multiple Industries

Software Tools Reliability/Durability Solutions

• Design Optimization

• Operational Usage

• Safety Design

• Damage prediction

• Vibration analysis

• Deterioration

System Performance

• KPI Monitoring

• Maintenance Optimization

• Forecasting

• “What-if” Scenarios

• Design Optimization

• Life Cycle Cost Analysis

• Predicting reliability

• Forecasting

• Safety Design

• Risk Analysis

• Maintenance Strategy

Component Performance

• Continuous monitoring

• Failure Mode Analysis

• Key parameter identification

• Prognostic analysis for remaining useful life

Page 4: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

OSI Interfaced Architecture

PI Connector PI Server External Devices

Signal Preprocessing

AF Server Failure Reporting Corrective Actions Reliability Analysis

and Predictions

Signal Processing Usage Severity

Vibration Analysis Pattern Matching

Tags

Page 5: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Our Business By combining physics of failure with patterns of failure … our models, analysis and systems provide high confidence information to support … accelerated development, improved operations, greater safety, risk management, improved asset management, and other key business decisions Deeper knowledge, superior insight and assurance delivered

Page 6: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Asset Lifecycle Performance Cradle to grave: from initial design to last use

Boeing 747 50 years of development 100 years of operations

Operating Aircraft Development

2020 2030 2040

Page 7: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Development Lifecycle

Reliability Requirements System Usage

Component Failure Modes Design and Test Loads System and Failure Modeling Reliability Baseline Supplier Selection

Operational Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

Process FMEA Control Plans Validation Testing Defect Tracking Burn-in

Incident/Failure Reporting Root Cause Analysis Warranty/Field Data Analysis Fleet Monitoring

Concept/Design Develop & Test Manufacture Warranty

Page 8: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Accelerating Real World Conditions

Optimum proving ground schedule to replicate field failures:

• What surfaces/distances?

• What vehicle weight conditions?

• What road speeds?

• What manoeuvres?

Acceleration factor?

Correlations between proving grounds?

Page 9: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Page 10: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Matching Damage to the Real World Proving ground events

Target Damage

Optimizer

Accelerating the replication of field failure modes

Page 11: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Develop Products for Reliability and Durability

Accelerated

Testing

Virtual Testing

Operational Monitoring

Page 12: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Development Lifecycle

Concept/Design Develop & Test Manufacture Warranty

Reliability Requirements System Usage

Component Failure Modes Design and Test Loads System and Failure Modeling Reliability Baseline Supplier Selection

Operational Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

Process FMEA Control Plans Validation Testing Defect Tracking Burn-in

Incident/Failure Reporting Root Cause Analysis Warranty/Field Data Analysis Fleet Monitoring

Operational Feedback

Page 13: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Understanding what’s Important Delivering more with less!

Army Tank originally designed for European theatre

• Needed to operate in other locales

• Significant suspension and track failures observed

Understand failure modes first

Identify key data influencing failures

Then consider redesign

Page 14: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Creative Instrumentation

Embedded Data Acquisition Device

CAE Simulation

Page 15: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Deriving Damage from Available Tags

Component

Loading

Vehicle

Speed

Vehicle

Heading

Acceleration Braking Turning

Readily available tags

Page 16: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Operations Lifecycle

Planning/Concept Design Commissioning Operations & Maintenance

Reliability/availability requirements

Environmental / usage conditions

HAZOP

Safety integrity level (SIL) allocation

Design alternatives

Availability predictions and system modeling

Life cycle cost (LCC) analysis

Throughput simulation Identify critical equipment

Safety instrumented system (SIS) design and SIL assessment

Throughput forecasting

Asset monitoring / bad actors

Root cause analysis

Condition/performance based maintenance

Availability modeling

Spare parts forecasting

SIL verification

Risk based inspection

Maintenance plan creation

Spare parts predictions

Risk based inspection Plan

Operational Feedback

Page 17: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Challenge to obtain accurate Operational Data

Problem Want to correlate vehicle speed to damage • Poor correlation observed

Approach • Identify Neutral-Neutral cycles • Meaningful cycles (Speed > 5mph, Duration > 15s) • Apply machine learning (ML) to vehicle bus parameters • Apply appropriate physics

Results Correlated high/low range to vehicle bus • 80% accuracy with ML • 95% accuracy with ML and physics

Speed measured here but needed here

Page 18: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Operations Lifecycle

Planning/Concept Design Commissioning Operation & Maintenance

Reliability/availability requirements

Environmental / usage conditions

HAZOP

Safety integrity level (SIL) allocation

Design alternatives

Availability predictions and system modeling

Life cycle cost (LCC) analysis

Throughput simulation Identify critical equipment

Safety instrumented system (SIS) design and SIL assessment

Throughput forecasting

Asset monitoring / bad actors

Root cause analysis

Condition/performance based maintenance

Availability modeling

Spare parts forecasting

SIL verification

Risk based inspection

Maintenance plan creation

Spare parts predictions

Risk based inspection Plan

Page 19: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Impeller

Controls

Switches

Motor

Shaft

Bearings

Pump XYZ

Modeling Failures … Subsystem Level

Time (h)

Failu

re P

rob

abili

ty

Page 20: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Building a Digital Twin… Representative of System

Operating Data

Impeller

Controls

Switches

Motor

Shaft

Bearings

Pump XYZ

Impeller

Shaft

Bearings

Switches

Motor

Controls

Digital Twin

Page 21: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

Digital Twins … Help Decision Making

Plant: WWT-1 Location: North

Dakota

RANK System RCI 3 months 6 months 12 months

1 Pump XYZ 61 No Change Better Worse

2 Centrifuge 133 Better No Change No Change

Ranking - Likelihood - Severity

Measure and Report - Detect emerging problems - Identify trends

Actionable Information - Predict failures - Optimize availability - Assess improvement

Page 22: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public

RESULTS CHALLENGE SOLUTION

COMPANY and GOAL

23 #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Summary

Providing tools, analysis, people and solutions to enhance system reliability, durability and safety

Extend asset life

Increase system availability

Improve product designs

Accelerate product testing

Understand why assets fail

Prioritize the failures

Focus on key failure modes

Prudent system monitoring

- Advanced analysis to derive insight

- Reliability assessment to understand impact

On average 10% reduction in maintenance costs

Comparable improvement in system availability

More reliable products delivered to market faster

Page 23: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

About the Presenters

• Kevin Knill

[email protected]

• Director Solutions Architecture

• HBM Prenscia Solutions

• Adam Mettas • [email protected]

• VP Business Development

• HBM Prenscia Solutions

Page 24: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Questions

Please wait for the

microphone before asking

your questions

State your

name & company

Please remember to…

Complete the Online Survey

for this session

Page 25: Increasing Reliability for Industrial Applications · 2018-04-26 · Loads Testing Accelerated Life Testing Reliability Improvement Plan Reliability Growth Testing Warranty Predictions

#OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

HBM Prenscia: Public #OSIsoftUC #PIWorld ©2018 OSIsoft, LLC

Optional: Click to add a takeaway you wish the audience to leave with.

Thank You

Merci

Grazie