increasing business value through technology & innovation...title: title goes here two lines...
TRANSCRIPT
Copyright 2013. All rights reserved
Increasing Business Value through Technology & Innovation
Owner Operator ForumMarch 21, 2013
Ray Topping, PEFiatech Director
Copyright 2013. All rights reserved
Fiatech
Copyright 2013. All rights reserved
Fiatech Mission
Fiatech is a global community of passionate stakeholders
working collaboratively to lead development and adoption of
technologies and innovative practices to achieve the highest business value
throughout the life cycle of capital assets.
Fiatech Capital Project Technology Roadmap
Copyright 2013. All rights reserved
Advancing Capital Project Productivity is a Non Trivial Pursuit
During the time period 2000 – 2008, how much did productivity increase in the US Construction Industry?
A. 4.5%
B. 2 %
C. 0, no change
D. ‐ 3.5%
Source; McKinsey Report
Copyright 2013. All rights reserved
Fiatech’s Members are united by a common goal“…….make a step change improvement in
productivity in the design, procurement, engineering, construction, and maintenance of capital assets.”
Fiatech ‐ Created by Owner Companies
‐ Includes Members and Partners that represent broad range of industry stakeholders.
Copyright 2013. All rights reserved
Networking, Collaboration
and Partnerships
Projects develop,
demonstrate and deploy
Technology Exchange,
Events, Outreach & Webinars
Awards Program
Recognitions
Delivering Increased Business Value Advancing Technology & Innovative Practices
Copyright 2013. All rights reserved
Fiatech Delivers – 2012 Outstanding Year of Progress, Technology Leadership and Value
www.fiatech.org
Highlights described in our 2012 Annual Report
•Over 20 member lead projects
•Emphasis on business value & implementation by our Members
• Partnered with industry leaders to leverage resources•Annual Conference, Member’s Meeting and Awards Program
•Active Technology Exchange, Webinars, Industry Outreach Program
•Global Activities including European Advisory Council
Copyright 2013. All rights reserved
20 Projects with Deliverables – 2012/ Q1 2013
– Design Projects ‐ 4 Projects, EELCAT, Spec Automation Ph.1, Supplier Exchange, IIP
– Procurement ‐ 4 Projects, EMSA POC, Productivity Improvement Guide, GM Tracking Case Study, PPI Ph. 1
– Construction – 3 Projects incldg. RTFR and RFID Access Control plus Mobile IT COP
– Project Management – 2 Regulatory Streamlining Projects ‐Autocodes POC, and Digital Signatures
– Operations – ALARA virtual work environment, Avatars
– New Materials & Methods – Augmented Reality
– People/Workforce – User Acceptance of Mobile IT
– Information Management – 4 Projects; Interoperability Vision Paper, 2 Projects iRING/ISO15926/JORD, Structural Steel Interoperability, HEED Ph. 1
Copyright 2013. All rights reserved
• Guideline for Replicable Buildings – cut plan review time by 80%, TARGET saved over $20M in calendar year 2011
• ePlan Review – goal: cut permit application time by 60%, can save industry $15 billion/year
• Automated Code Checking (Autocodes) – goal: reduce plan review time from months to minutes, cut review time by 80%
Regulatory Streamlining Initiative –A Step Change Improvement in the Review Process
Lead Fiatech Members
Copyright 2013. All rights reserved
– Specific Automation: – increase productivity and advance interoperability to computer aided design (CAD), building information modeling (BIM)
– Supplier Information Exchange with Design to Support Construction - Standardization of deliverables improves repeatability and productivity to meet design intent.
– Common Design Workflow Checklist, Workflow Mapping Of Engineering Deliverables To Construction – enhance the work processes of Design and the integration with construction
Driving Increased Business Value through Design and Interoperability
Copyright 2013. All rights reserved
Leadership for Advancing Interoperability• Advancing Interoperability Vision Paper, with Calls to Action • JORD Project and iRING – advancing data interoperability with
PCA • Structural Steel Interoperability for the Building and Process
Plant Industries – with AISC and bSa, led by Chuck Eastman, GA Tech
• HEED Project – data exchange for engineered equipment• Oil & Gas Data Project – demonstration project with MIMOSA• ISO 15926 Project Information Flow- 2nd year, piping data
exchanges from design to construction• IIP Project – with iRING Community, ISO 15926 data mapping• Information Management across roadmap with increased focus on
procurement and operations
Copyright 2013. All rights reserved
Information Management Data Exchange
How much did a major chemical supplier save in one year by using the ISO 15926 (like BIM) data standard for consistency checking across internal engineering instrument tools?
A.$1M
B. $8.4M
C. $11.3M
D.$28M
Copyright 2013. All rights reserved
• CII studies have shown that materials and installed equipment can comprise 50-60% of a project’s total cost and control 80% of its schedule (Ibn-Homaid 2002)
• The construction industry only invests 0.15% of its costs in materials management and control, (Marsh,1985),versus 1% for the manufacturing industry (Formoso and Revelo 1999).
Procurement & Materials ManagementOpportunities
CII sources: IR7‐3, EM7‐21, EM7‐21A, RS7‐2, RS7‐1, SD‐92, IR 166_3_v2
Copyright 2013. All rights reserved
Procurement, Materials Management• Enable substantial materials management productivity improvement through end-to-end
increase in visibility, predictability, accountability, traceability & control
Projects•Automating Equipment Information Exchange (AEX)•Global Valve Cross‐Reference e‐Catalog (GVCC)•RFID Valve Tagging Case Study•RFID for Materials Management & Productivity Improvement•Materials Management Productivity Improvement Guide•Global Materials Tracking Case Study•Next Generation Project Performance Predicting•Life Cycle Materials Risk Mitigation•Expediting Equipment & Material Selection and Acquisition (EMSA)
Copyright 2013. All rights reserved
Our Vision: A committed, integrated team skilled in working withadvanced, user‐friendly technologies at that enabling high levels of quality and productivity through the life‐cycle of capital projects.
Technology Enabled Workforce
• 3D ALARA Planning Tool – step change productivity advancement for hazardous environments; huge potential for operations training
• Augmented Reality Project• Best practices recruitment of people in technology‐related fields• Attracting the Next Generation • Developing Core Technology Competencies • Leveraging Technology to Improve Construction Productivity • User Acceptance of Mobile IT Report• Introduction to ISO 15926 Report and Training• Training Course for Implementing Regulatory Streamlining
Copyright 2013. All rights reserved
Our Vision for Intelligent & Automated Construction Sites
The construction process and project site are re‐engineered to make use of emerging information and automation technologies to
• minimize capital facility delivery costs, • expedite facility delivery time, • improve delivered quality, • eliminate re-work, and • minimize lifecycle costs.
“…data from megaprojects shows that 65 percent …failed to meet business objectives.”
paraphrased ‐ …70% of Energy projects have not met budget and 85% have not met schedule
Copyright 2013. All rights reserved
Intelligent and Automated Construction Sites
and Integrated Handover/ Turnover/CommissioningConstruction•Real Time Field Reporting Using Smart Devices – Enhance Construction Productivity and increase effectiveness of Design Coordination•Mobile IT Community of Interest – sharing of advancing practices by our members and our partner COMIT for automating Field Services•RFID Access Control Systems International Case Studies – Global Review of Emerging High Value Practices•User Acceptance of Mobile IT – Assessment of Best Practices for increasing the Use and Benefit for Mobile IT Devices•Real-Time Field Reporting Using Smart Devices – Review of Emerging High Value PracticesHandover/ Commissioning•General Buildings Information Handover Guide•Capital Facilities Information Handover Guide
Copyright 2013. All rights reserved
Focus Areas of Project Activity for 2013
• Interoperability including Handover and Facilities Management
• Mobile Field Devices and Automation for Construction Site
• Regulatory Streamlining including AutoCodes• Procurement/ Materials Management• Project Management Information Systems• Workforce• Technology Advances including Augmented
Reality and Avatars• New Materials & Method
AutoCodes
Copyright 2013. All rights reserved
Networking, Collaboration and Partnerships
Peter Blake, Hatch – “Through discussion with an expert that we only have access to through Fiatech, we were able to save over $250,000 on one project.”
Major EPC firm – Fiatech’s member driven project approach gains us access to experts we would not normally have available and leverages our development investment at least 10 to 1.
The Mobile IT Community of Interest in partnership with COMIT is sharing advanced practices for field automation, delivering productivity improvements for our construction practices. – Fiatech Member
Copyright 2013. All rights reserved
The White House, Office of Science and Technology (OSTP) Grand Challenge
“Bring innovation and technology into engineering & construction to stimulate economic recovery and sustainability, public safety and disaster resiliency.”
Copyright 2013. All rights reserved
• Portfolio of Member Led Projects
• Networking & Collaboration
• Technology Exchange
• Awards & Recognitions
SummaryDriving Productivity Improvement and Business Value
http://fiatech.org/
Copyright 2013. All rights reserved
Join Us! March 25-27