INCISIVE VERIFICATION NEWSLETTERDECEMBER 2004
IN THIS ISSUE:
01 TO OUR READERS | PAGE 1
02 ADVANCED VERIFICATION FLOW | PAGE 2
03 PROCESSOR-BASED EMULATION | PAGE 10
04 THE INCISIVE ASSERTION LIBRARY | PAGE 14
05 INCISIVE DEBUG AND ANALYSIS TIPS | PAGE 17
ncisive platform news and events................... 19
-
8/22/2019 Incisive Dec04
2/21
TO OUR READERS
01
Hello and welcome to the December 2004 issue of the Cadence Incisive Newsletter,
the quarterly technical verification newsletter for design and verification engineers. The
Incisive Newslettercontains articles and information to help you increase the speed and
efficiency of your verification efforts for todays complex system-on-chip (SoC) projects.
In this issue, you will find a smaller number of articles to accommodate the more detailed
technical information each article contains. This months newsletter features the
Advanced Verification Flow, an implementation of the Unified Verification Methodology
that Cadence introduced last year along with the Incisive platform. Flows are a populartopic as more tools and techniques become available to solve verification challenges.
New tools are great, but where should they be used? When should they be used? And
how should these tools and techniques be assembled into an optimal verification flow
that will let you unleash the full potential of an integrated platform like the Incisive
platform? In this article, we introduce the Advanced Verification Flow (AVF), describe
its major stages along with their challenges and benefits, and detail a sample reference
design that is available to help you understand and implement the AVF.
Cadence recently raised the bar on speed and capacity with the introduction of our new
Palladium II acceleration/emulation system. The Palladium family is a processor-based
solution that provides a number of benefits over earlier FPGA-based systems. In our
second article, we will examine the differences between FPGA and processor-based
emulation and describe the advantages and disadvantages of each type of system.
Assertion-based verification is catching on like wildfire as a way to embed expected
design behavior checks, add to your coverage metrics, and help create more self-
documenting designs. To help users get even more power out of assertions, Cadence
is releasing a library of assertion modules that implement checks for common design
structures. In our third article, we review this new library and show how it can be used
in your designs.
Our fourth article continues our popular series on SimVision debugging tips and techniques.
Well show you new ways to use time ranges how to save them and synchronize them
among multiple waveform windows to greatly expand your debug power.
And finally, we once again give you a round up of news and events in Q4 that may be
of interest to you. Want to see an article on a specific topic? Feel free to send in your
requests to [email protected].
I hope you all have a happy holiday season and enjoy any vacation plans you might have.Well see you in 2005 with our next edition of the Incisive Newsletter.
John Willoughby,
Incisive Marketing Director
-
8/22/2019 Incisive Dec04
3/21
Todays larger chips and shorter design cycles have
driven many companies to invest in verification teams
and tools. Yet these verification teams struggle to
do more with fewer resources and outdated tools.
Yesterdays verification techniques are falling short,
and functional verification has become a moving
target for many designers who feel they are going to
battle unprepared and understaffed. Companies are
now realizing that they cant just throw engineers at
the verification problem-they have to take advantage
of new technologies.
Cadence realized this long ago and stepped up to
provide technologies that eliminate the verification
bottleneck. The Cadence Incisive functional
verification platform provides many key verification
technologies, but these technologies by themselves
are not a solution without a proper methodology.
Effective verification must be methodology based, not
tool based. The Cadence Methodology Engineering
(CME) team has developed the Advanced Verification
Flow to bring the most comprehensive verification
strategy to design teams around the world. The CME
team comprises former customers and verification
consultants who are knowledgeable about effective
verification methodology. They have created a
reference design to demonstrate world-class, industry-
leading methodologies. This paper introduces the
reader to the Cadence Advanced Verification Flow
and illustrates the reference design environment that
the CME team created for customers to use as they
adopt Incisive platform technologies.
AVF OVERVIEW
The Advanced Verification Flow (AVF) is an
implementation of the Unified Verification
Methodology (UVM)1,2. It outlines the development
of both transaction-level and implementation-level
functional virtual prototypes (FVPs), which are the
environments used to functionally verify large system-
on-chip (SoC) designs of one million gates and above
(although techniques used in this flow are universal).
The design complexity of chips at this size is such that
a wide variety of techniques and technologies must
be used to successfully complete the project. This
paper walks the reader through all the AVF steps,
from verification planing through full system
verification. It also highlights the flows efficiency
and how it utilizes the appropriate methods and
tools at the appropriate time to maximize verification
throughput. By understanding this flow, the reader will
learn industry best practices for functional verification.
Verification teams are not expected to implement
and perform every major phase or all the steps in
a phase. The AVF is designed to be incrementally
adoptable. Teams can decide based on theirrequirements, group experience, and individual
expertise which technology and, therefore, which
flow steps should be adopted for their project.
GOALS OF THE ADVANCED VERIFICATION FLOW
Provide a roadmap for verification, from project
conception to system verification, which you can
adopt incrementally
Begin verification of the design earlier, increasing
design checkpoints and isolating bugs
Create a verification methodology that promotes
reuse across testbenches and projects
Maximize the verification effectiveness of your
environment for each cycle run
Provide the necessary information, in the form
of documentation and examples, to help teams
successfully develop and utilize advanced verification
methodologies and associated techniques
ADVANCED VERIFICATION FLOW
BY KARL WHITING, CADENCE DESIGN SYSTEMS
02
2 | Incisive Newsletter December 2004
-
8/22/2019 Incisive Dec04
4/21
Explain the benefits and tradeoffs of using
these techniques
Show detailed examples of each step on a real design
Direct users where to go for additional information
BENEFITS OF USING THE ADVANCED
VERIFICATION FLOW
Users can understand how various advancedtechniques integrate together into a complete
verification flow
Users can begin adopting new verification
technologies
Users can select parts of the flow and adopt them
incrementally
Users can walk through the individual steps in the
flow using the reference design
Users can utilize the code, scripts, and infrastructure
of the reference design to jump start their work
The AVF follows the basic guidelines of the UVM.
Figure 1 below illustrates the phases in the flow
starting with the verification plan.
The phases of the AVF are:
Block-level verification Verifies individual blocks being
developed in the SoC. Tests and components used
during this phase can be reused at the system level.
Integrating a block into the FVP The FVP
environment represents the system environment.
Integrating a design block into the FVP allows that
block to be verified using system tests and software
earlier in the design cycle.
Full-chip or system verification Consists of the steps
required to integrate the full chip and verify it.
Transaction-based acceleration can be used in this
phase most effectively.
In-circuit verification Some systems require that you
create a prototype or an in-circuit environment to
verify more of the hardware and software together
before tapeout. The AVF recognizes this need, but
does not describe the in-circuit flow. (A description
of the in-circuit flow, however, is available in another
Cadence document.)
It is a major goal of the AVF that verification IP
developed for one phase or step carries forward andis reused in other phases, thus reducing the overall
work load. In addition, it is important for design
teams to be able to reuse old tests and verification IP
from previous projects. However, the AVF does not
advocate that a verification team throw out their
existing testbench methodologies. The flow is
intended to complement and enhance an existing
verification methodology in an evolutionary manner.
VERIFICATION PLANNING
The success of any project depends, first, on a well-
developed plan, followed by efficient execution of
the plan. The AVF starts with a planning phase thatprovides a roadmap for verifying an SoC design. It
documents the goals for verification, the methods and
technologies that will be used to achieve those goals,
and the tests that need to be developed. The plan is
used throughout the flow to track progress and ensure
that the goals are being achieved. It chooses which
of the flow phases will be followed and describes the
details of each step in each phase. Finally, the plan
defines the functional verification completion
requirements and tapeout criteria.
The steps associated with the creation of a verification
plan3 are as follows:
Set verification goals Describes measurable
functional verification goals.
Develop the feature list Describes the system
features to be verified.
Define the verification environment Defines the
environment to be used to verify the system features.
TL FVP
Verification plan
Block-levelverification
Integrate blockinto FVP
Full-chip/systemverification
In-circuit systemverification
Major flowstep
Dependencydirection
Figure 1: Advanced Verification Flow
Verification planning Specifies requirements, lists
functionality to test, and lists the tests that must be
created. The flow is developed to ensure that the
testbench created is robust enough to handle all theverification challenges that the team will encounter.
Creating the transaction-level functional virtual
prototype (TL FVP) The FVP is an executable
specification of the system that can be utilized during
all phases of the flow and by the software group to
start software development.
Incisive Newsletter December 2004 | 3
-
8/22/2019 Incisive Dec04
5/21
Define assertions at all levels Defines the assertions
that will assist the designer by finding structural bugs
earlier in the design cycle. Assertions are also useful for
debugging by associating a problem to a specific area
of RTL code.
Create the list of tests Defines tests to be used to
verify the system features.
Develop the coverage and completion requirements
Describes coverage metrics, goals, and functional
verification completion requirements needed
before tapeout.
Determine resource requirements Defines resources
needed to accomplish all the goals. Resources include
engineers, machines, software, and tools-and their
quantities-needed for verification.
CREATING THE TRANSACTION-LEVEL FVP
After the planning process, the next stage of the
flow is to develop an FVP. The FVP is an executable
specification of the design. It can be used to evaluate
the system architecture, make performance tradeoffs,and develop low-level software, and it ultimately
defines the final SoC functionality and partitioning.
The FVP contains transaction-level models (TLMs),
system-level tests, application checkers, and
performance monitors. It is typically written in C, C++,
or SystemC. The SystemC library was created to make
system modeling easier.
In creating the FVP, the verification team begins
creating the testbench and system-level tests early in
the design cycle. Both software and hardware teams
use the FVP during development. The software team
can begin writing and executing code against the FVP,
maturing the software side of the system earlier in thedesign cycle.
The steps associated with the creation of an FVP are
as follows:
Create digital and analog TLMs TLMs are the design
blocks in abstracted form. TLMs run faster and enable
system testing earlier in the design cycle.
Create system tests Develops system directed and
constrained random tests.
Create application checker The application checker
verifies the high-level functionality of the system.
Develop and integrate software Boot code,
diagnostics, and hardware drivers can be developed
and tested using the FVP.
Create test harness The test harness connects
everything and enables you to run a simulation with
the correct configuration.
Compile and link Defines the compile and link
process where testing control is defined.
Run tests and softwareDefines the run process
and how to control the tests to run and their setup,
scenarios, and configurations from the command line.
Debug the FVPDefines the process for verifying your
FVP environment.
Synchronize with the verification plan Monitors
progress against the verification plan by promoting
test, coverage, bug, and schedule reviews.
BLOCK-LEVEL VERIFICATION
Either after or concurrent with the creation of the FVP,
one or more design blocks must be verified. Because
designs are complex, SoC design practices require that
functionality be split up into blocks with well-defined
interfaces. A design block can be any logical or
functional partition in the design. SoC design blocks
are typically between 30-100K gates in size and are
partitioned with well-defined or standard interfaces
on the exterior.
The steps associated with block-level verification are
as follows:
Perform static analysis on the blockDescribes the
process for checking the RTL with a lint checker and
assertion density evaluator before simulation is run.
Accumulate testbench Describes the components
needed to verify the block design, including
transactors, interface monitors, response checkers,
stimulus generators, and scoreboards. Some of these
components need to be pre-planned in order to
maximize acceleration performance later.
Create or re-use tests Defines the directed and
constrained random testing process.
Add functional and interface assertions Defines the
process of adding PSL structural checks, pre-existing
protocol monitors, and checkers that check common
design elements. All provide coverage informationas well.
Create test harness Defines the test harness,
which connects everything and enables you to run
a simulation with the correct configuration.
Compile and link Defines the compile and link
process where testing control is defined.
Run tests and software Defines the run process
and how to control the tests to run and their setup,
scenarios, and configurations from the command line.
Debug the block Defines the process for verifying
your block-level design.
Check code and functional coverage of the blockDescribes the process for performing code and
functional coverage analysis.
Accelerate block to smooth the path for system
verification This outlines the process for getting
the block ready for hardware acceleration. It confirms
that the RTL can be synthesized into the hardware
accelerator and will behave correctly when accelerated.
4 | Incisive Newsletter December 2004
-
8/22/2019 Incisive Dec04
6/21
Incisive Newsletter December 2004 | 5
Synchronize with the verification plan Monitors
progress against the verification plan by promoting
test, coverage, bug, and schedule reviews.
INTEGRATING A BLOCK INTO THE FVP
Once a block has been verified in its own environment,
it is ready to be placed in the system environment and
tested against the FVP. Integrating a design block into
the FVP is the next step in the flow.
The steps associated with the integration of a block
into the FVP are as follows:
Modify test harness Adds the RTL block to the FVP
Compile and link Defines the compile and link
process where testing control must be defined
Run the FVP tests and software Defines the run
process and how to control the tests to run and their
setup, scenarios, and configurations from the
command line
Debug the block in the FVP environment Defines
the process for verifying your block-level design inthe FVP environment
Synchronize with the verification plan Monitors
progress against the verification plan by promoting
test, coverage, bug, and schedule reviews
FULL-CHIP OR SYSTEM VERIFICATION
The verification of a full chip or a system is an
iterative process that focuses on the interconnection
of blocks in the system. For example, you can start
the process by connecting the processor to a couple
of key blocks that transfer data. By doing this, these
key blocks can be configured and basic data flow
across these blocks can be tested. Next, attachanother block and test its processor connection and
the connection to one of the blocks in the testbench.
This process continues until all blocks are integrated.
The testbench evolves through this process.
Throughout the debug process you are modifying
and adding components, assertions, and tests to the
testbench to further verify the full chip or system.
The steps listed below outline the flow for a single
iteration through the verification of the full chip or
system. As you incrementally integrate blocks in the
system, steps (such as accumulate testbench, create
more tests, add more assertions, and add more
coverage checks) are revisited to increase thefunctional coverage of the testbench.
Accumulate testbench Describes the components
needed to verify the block design, including
transactors, interface monitors, response checkers,
stimulus generators, and scoreboards. Some of these
components need to be pre-planned to enable
hardware acceleration at a later stage.
Create more tests Describes the process of testing
functionality, interconnection of blocks, and corner
cases using constrained random techniques.
Create more assertions Defines the process of adding
PSL structural checks and utilizing pre-made checkers
that check functions and interfaces.
Add more coverage checks Describes the process of
adding functional coverage checkers (in some cases
automatically obtained with assertion checkers).
Integrate software HW/SW co-simulation is an
important part of verifying the full chip or system.
There is increasing competitive pressure to develop
and integrate software (such as boot code, diagnostics,
and hardware drivers) earlier in the cycle.
Implement transaction-based acceleration
Simulation acceleration combines a software simulator
running on a workstation with a hardware accelerator.
During simulation acceleration, the design under
verification (DUV) is synthesized and realized in
the accelerator while any non-synthesizable objects
(testbenches, verification components, tests) are runon the software simulator.
Create test harness Defines the test harness,
which connects everything and enables you to run
a simulation with the correct configuration.
Compile and link Defines the compile and link
process for both simulation and acceleration and
defines testing control.
Run full regression suite and software Defines the
run process for both simulation and acceleration, and
shows how to control the tests to run and their setup,
scenarios, and configurations from the command line.
Debug the chip or system Defines the process forverifying your full-chip design.
Check coverage Describes the process for performing
code and functional coverage analysis.
Synchronize with the verification plan Monitors
progress against the verification plan by promoting
test, coverage, bug, and schedule reviews.
Perform completion analysis Describes the process
for reviewing the project and determining if the
design is ready for tapeout.
IN-CIRCUIT VERIFICATION
The next logical step for systems that must be attachedto hardware is in-circuit emulation. The AVF does not
go into any more detail on the in-circuit verification
step, because this step is a flow within itself.
-
8/22/2019 Incisive Dec04
7/21
6 | Incisive Newsletter December 2004
REFERENCE DESIGN ENVIRONMENTS
To illustrate the AVF and highlight the advanced
verification methodologies it promotes, we took an
existing design and created top-down and bottom-up
verification environments. The design project will
be referred to as Eagle. The Eagle design is a
networked video processing chip that can be used in
a networked picture frame, for example. It is an SoC
design that consists of multiple processors, hardwareIP blocks, and firmware.
HIGHLIGHTS
Multiple processor implementation
2GB (total) external addressing for data, code,
and video memory
External SRAM and DRAM interface
56-bit encrypt/decrypt engine (DES)
JPEG decompression engine
Standard buses
FEATURES
Two 32-bit LEON RISC processors
Controller
DSP
Decryption engine
VGA controller
AMBA AHB/APB-compliant internal bus
2-channel DMA controller with dual 10/100 Ethernet
MACs
Firmware for system control and JPEG decompression
EXTERNAL INTERFACES
Dual 10/100 Ethernet port
VGA/LCD port
Standard serial interface
The internal block structure of the Eagle design is
shown in Figure 2.
Encrypted and compressed video streams are
passed to the chip over two Ethernet channels to
corresponding Media Access Control (MAC) blocks.
Inside each MAC block, the Ethernet frame is
decomposed and the payload (video stream) is
placed in a FIFO. The control processor runs firmware,
hardware drivers, and applications. Software running
on the processor controls the processing of video
frames. The DMA block is programmed and transfersthe video frame to the DES blocks FIFO. The DES
block decrypts 64 bits of video using a 56-bit key. The
DSP then decompresses the video image and renders
it for VGA display. Following this transformation, the
video image is streamed out the VGA port in rows to
the monitor for display.
CREATION OF THE TRANSACTION-LEVEL FVP
For the Eagle design, the transaction-level FVP was
created using the same block-level view as the planned
RTL. Each block was either represented as a
transaction-level model (TLM) in SystemC, or as an
instruction set simulator (ISS) for the processing units.We created the TLMs to be functionally and register
accurate. Because they are abstracted versions of the
real design, they simulate very fast. We were able to
develop software using this environment as well. There
are two software routines that execute within Eagle.
The first is the master controller firmware, which
performs the main functions of controlling data
transfers and housekeeping functions. The second
program performs JPEG decompression. These
programs are written in C, compiled for the
appropriate machine architecture, and transformed
into memory load files.
The development of the transaction-level FVP allowedearly development of the firmware. In addition, the
TLMs were created with the expectation that they
would be utilized as reference models in the RTL
testbenches. Lastly, the verification components in this
environment were reused later for the full-chip
testbench. The FVP environment allowed us to create
and debug parts of our testbench environment far
earlier than we would have normally been able to.
The testbench created for the transaction-level FVP is
shown in Figure 3. Software and video images are
loaded into the simulation. The DES, DSP, AHB, DMA,
VGA, and memory are all TLMs.
Controllerprocessor(VHDL)
MAC 1(Verilog)
FIFO memory(8KB)
MAC 2(Verilog)
FIFO memory(8KB)
VGA (VHDL)
AHB/Wishbone
Video RAM
DMA (Verilog)
Memory
DSP (VHDL)
2 FIFOs
DES (Verilog)
AMBAAHB
Figure 2: Eagle block-level structure
-
8/22/2019 Incisive Dec04
8/21
Incisive Newsletter December 2004 | 7
The testbench works in conjunction with the software.
Testbench components were created such that theycould be reused in the RTL simulation. The segmentor
component loads a JPEG image from a file. It then
segments it into specific sized chunks and sends it
to the system test. The system test packs it into an
Ethernet frame and sends the Ethernet transaction to
the Ethernet/DMA TLM. Software then controls the
processing of video frames. There are two points of
reference for the testbench to check that the system
is working correctly. The first opportunity is after
decryption occurs and the JPEG image is sent back out
the Ethernet channels. This video image is compared
against the expected JPEG image for correctness. The
second opportunity is when the image is sent out ofthe VGA interface in RGB format. This RGB data is
stored and compared against an expected image for
correctness. The simulation will fail if either of these
checks fails.
BLOCK-LEVEL VERIFICATION
In the Eagle design, the DES block was newly created
and therefore required a block-level verification
environment. Figure 4 illustrates the block-level
testbench for the DES block. Encrypted images
(with an encryption key) are fed into the DES block,
decrypted, and then sent back to memory. The
testbench consists of directed and constrained randomtests; an AHB master transactor and assertion monitor;
a response checker that utilizes the TLM from the FVP;
and a segmentor that reads JPEG images into the
testbench and segments them into payloads, which
are bundled into Ethernet packets by the tests. The
DES block has embedded assertions that check the
design as it simulates and accumulate functional
coverage statistics. This powerful testbench easily
verified the DES block while reusing parts of the
FVP and creating components and tests that can
themselves be reused in the full-chip testbench.
AHBassertionmonitor
DES RTL
AHB master
transactor
Segmentor
Random test
Test 2
Test 1
JPEGimage
Scenariofile
AHB
FileVIPTLMs
Transactionchannel
VerificationIP
RTL
Signal
Responsechecker
DES TLM
Figure 4: DES block-level testbench
EthernetDMA
DSPDES RTLISS
VGA Memory
AHB
Segmentor
System testSystem test
System test
JPEGimage
JPEGimage
Codeimage
Codeimage
Compare ComparePass? Pass?
VGA
Memoryload
Memoryload
MII
Videoimage
Exp. videoimage
AHB master
FileVIPTLMs
Transactionchannel
VerificationIP
Figure 5: Integration of the DES block into the transaction-
level FVP
INTEGRATING THE BLOCK INTO THE TRANSACTION-
LEVEL FVP
Once the FVP is created, RTL blocks that have been
verified in a standalone testbench can be integrated
with the system and run against the software. This
is huge advantage to this methodology. If you are
developing multiple blocks, you no longer have to wait
for them all to be developed before you integrate
them with the system environment. Each block can be
integrated on it own and run with system tests and
software. Figure 5illustrates this phase.
EthernetDMA
DSPDESISS
VGA Memory
AHB
Segmentor
System testSystem test
System test
JPEGimage
JPEGimage
Codeimage
Codeimage
Compare ComparePass? Pass?
VGA
Memoryload
Memoryload
MII
Videoimage
Exp. videoimage
FileVIPTLMs
Transactionchannel
VerificationIP
Figure 3: Eagle transaction-level FVP
-
8/22/2019 Incisive Dec04
9/21
8 | Incisive Newsletter December 2004
In the Eagle design, we integrated the DES RTL into a
transaction-level wrapper. This required the use of the
AHB master transactor to translate the transactions
being sent by the AHB TLM into the signal-level
protocol on the DES block. The normal FVP system-
level tests and software were then executed without
modification to further test the DES block.
VERIFICATION OF THE FULL CHIPBy the time we approached the verification of the full-
chip Eagle design, we had already created much of the
verification environment. The transaction-level FVP,
segmentor, system tests, and response checker from
the other testbench environments were reused
(unchanged) in the full-chip testbench. The full-chip
testbench is illustrated in Figure 6.
The same segmentor and system tests are reused
from the FVP environment. These have already been
debugged and work without modification in this
environment. The system tests pass JPEG-packed
Ethernet frames to the MII master transactor. The
MII and VGA transactors had to be developed for
this environment. The transactor passes the Ethernet
frames to the MAC blocks via the signal protocol. Just
like in the transaction-level FVP environment, thesame two points of reference exist for the testbench
to check that the system is working correctly. We
used a response checker in both cases to compare
actual results against expected results. We created a
generic response checker that could be used to check
different transactions. In this picture, there are two
response checkers. One is being used to compare
Ethernet frames from the design against expected
Ethernet frames from the transaction-level FVP. The
other is checking RGB data from the design against
expected RGB also arriving from the FVP. Both
response checkers are the same piece of code. We
utilized the template construct in C++ to create one
component that can be instantiated and used to
compare different transactions arriving from different
parts of the design.
Our simulations at the full-chip level include the
software. We were able to integrate the ISS into
this environment by adding a master transactor at
the interface to capture the reads and writes from
the ISS and translate these into AHB reads and writes
on the signals.
SUMMARY
The practical application of the Advanced Verification
Flow varies depending on the system being developedand the team doing the implementation. The AVF
was developed in a modular way such that design
and verification teams can adopt the methodology
incrementally. If you have been struggling with
response checking and do not create TLMs today, this
might be one starting point for incorporating the AVF.
But equally, there are two dozen other ways to start
using the AVF incrementally in your own environment.
Todays larger chips and shorter design cycles have
been the impetus for Cadence to step up and provide
technologies that remove the verification bottleneck.
The Incisive platform provides key verification
technologies such as the IUS simulator kernel, HAL,SystemC, SystemVerilog, PSL, the Incisive Assertion
Library, the verification IP library, functional coverage,
code coverage, and the SimVision debug environment.
This powerful platform in conjunction with the
Advanced Verification Flow makes the Cadence
methodology-based solution very effective in solving
a companys toughest verification challenges.
DSPDESProcessor
EthernetDMA
VGA
AHB
Segmentor
System testSystem test
System test
JPEGimage
Codeimage
Codeimage
Pass?
VGA
Memoryload
Memoryload
MII
MII master
MII master
MII monitor
MII
MII monitor VGA monitor
FVP
MII responsechecker
VGA responsechecker
FileVIPTLMs
Transactionchannel
VerificationIP
RTL
Signal
Figure 6: Full-chip testbench
-
8/22/2019 Incisive Dec04
10/21
Incisive Newsletter December 2004 | 9
The Cadence Methodology Engineering team has
created a reference design to demonstrate the AVF
and industry-wide leading-edge methodologies. This
reference environment was created using a wide
variety of techniques and technologies and is being
used by customers as they adopt new techniques or
technologies from the Incisive platform. Cadence
offers the AVF on a CD that contains the following:
AVF tutorial
Documentation
AVF description
AVF user guide
AVF detailed reference manual
Reference design and examples
Verilog/VHDL RTL source code with assertions
SystemC testbench source code
Verification IP
AHB master, slave and monitor, MII master and
monitor, and VGA monitor transactors DES and VGA response checkers
Constrained random and directed tests
Instruction set simulator
SoC development project directory structure
Scripts and Makefiles
The Advanced Verification Flow provides a roadmap
for verification, from project conception to system
verification, and it can be adopted incrementally. It
enables teams to start verification of their designs
much earlier and enhances design checkpoints to
isolate bugs quicker. This methodology promotesdesign reuse across the verification environments,
thus requiring less code. The AVF maximizes
verification effectiveness of your environment
for each cycle run, providing more bang for your
buck. It helps teams successfully develop and utilize
advanced verification methodologies and associated
techniques by example and with documentation. You
can utilize the code, scripts, and infrastructure of the
reference design to jump start your verification work.
REFERENCES
[1] Its About Time: Requirements for the Functional
Verification of Nanometer-scale ICs; Lavi Lev, Rahul Razdan,
and Christopher Tice; Cadence Design Systems white paper.
[2] Professional Verification: A Guide to Advanced
Functional Verification; Paul Wilcox, Boston: Kluwer
Academic Publishers (KAP), 2004; ISBN: 1-4020-7875-7.
[3] Principles of Functional Verification; Andreas S. Meyer;Elesevier Science, 2004; ISBN: 0-7506-7617-5.
RESOURCES
System-on-Chip Verification Methodology and Techniques;
Prakash Rashinkar, Peter Paterson, and LeenaSingh; Kluwer
Academic Publishers (KAP), 2001; ISBN 0-7923-7279-4.
Advanced Verification Techniques; Leena Singh, Leonard
Drucker, and Neyaz Khan; Kluwer Academic Publishers
(KAP), 2004; ISBN 1-4020-7672-X.
Writing Testbenches, Second Edition; Janick Bergeron;
Kluwer Academic Publishers (KAP), 2003; ISBN 1-4020-
7401-8.
-
8/22/2019 Incisive Dec04
11/21
FPGA-based emulation is widely understood by
engineers because they are accustomed to designing
with FPGAs. Much less familiar are processor-based
emulators and ample amounts of misinformation
abound. This article will attempt to remove the
mystery surrounding processor-based emulation and
to explain how design constructs are mapped into it.
PROCESSOR-BASED EMULATOR
ARCHITECTUREIn the early 1990s, IBM pioneered a different
emulation technology that was an offshoot of earlier
work they had done in hardware-based simulation
engines. To understand how a processor-based
emulator works, it is useful to briefly review how
a logic simulator works. Recall that a computers
arithmetic-logic unit (ALU) can perform basic Boolean
operations on variables (e.g., AND, OR, NOT) and that
a language construct such as always @ (posedge
Clock) Q = D forms the basis of a flip-flop. In the
case of gates (and transparent latches), simulation
order is important. Signals race through a gate chain
schematically left to right so to speak, or top tobottom in RTL source code. Flip-flops (registers)
break up the gate chain for ordering purposes.
each chain to an ALU, thus parallelizing the process
and reducing the time required, perhaps to one half.
A processor-based emulator has from tens of
thousands to hundreds of thousands of ALUs, which
are efficiently scheduled to perform all the Boolean
equations in the design in the correct sequence. The
following series of drawings illustrate this process.
Step 1: Reduce logic to four input Boolean functions
PROCESSOR-BASED EMULATION
BY RAY TURNER, CADENCE DESIGN SYSTEMS
03
Load E
Invert
AND D
AND C
OR B
STORE A
6 CPU clock cycle
A = B + C D E
Figure 1: Logic simulation CPU does Boolean math on
signals and registers
One type of simulator, a levelized compiled logic
simulator, performs the Boolean equations one at
a time in the correct order. (Time delays are not
relevant for functionallogic simulation.) If two ALUs
were available, you can imagine breaking the design
up into two independent logic chains and assigning
Original circuitA
A
B
B
C
C
E
EF
F
G
GH
H
J
J
M
MN
NKL
LS
S
P
P
R
R
Clock
F/F
CLK
Clock
F/F
CLK
Clock
F/F
CLK
Clock
F/F
CLK
K
The set of Boolean equations after reducing the logic
to four input functions is:
IF (Clock is rising) C = A
S = C & B & E & F
M = NOT (G + H + J + S)P = NOT (N + NOT (M & K & L) )
IF (Clock is rising) R = P
Additionally, the following sequencing constraint
set applies:
The flip-flops must be evaluated first
S must be calculated before M
M must be calculated before P
Primary inputs B, E, and F must be sampled
before S is calculated
Primary inputs G, H, and J must be sampled
before M is calculated
Primary inputs K, L, and N must be sampled
before P is calculated
Note: primary input A can be sampled at any time
after the flip-flops
10 | Incisive Newsletter December 2004
-
8/22/2019 Incisive Dec04
12/21
One possible scheduling is shown above. (This is done
for illustrative purposes and does not necessarily
reflect the most efficient scheduling.)
Step 3: Result of scheduling logic:
SPECIFIC TECHNOLOGY IN THE
PALLADIUM SYSTEM
Each custom ASIC in a Palladium system implements
a number of Boolean processors (see Table 1 below).
These ASICs are assembled with additional memory
dies onto a ceramic multi-chip module (MCM). Each
Palladium emulation boardcontains a number of
interconnected MCMs. A Palladium IIsystem can
have up to 16 emulation boards for a total of 884,736
processors. The memory on each MCM can be flexibly
shared between modeling design memory and logic
analyzer trace memory.
Calculate C Sample B Sample G Calculate R1
Sample E Sample H Sample N2
Sample F Sample J3
Sample K4
Calculate S Sample L5
Calculate M6
Receive M7
8
9
Sample A Calculate P10
Processor2
Timestep
Processor1
Processor3
Processor4
Processor5
Step 2: Schedule logic operations among processors
and time steps:
Processor 1Step 1
A
B
C
EF
GHJ
M
NKL
S
P
RClock
F/F
CLK Clock
F/F
CLK
Processor 2Step 5
Processor 3Step 6
Processor 5Step 10
Processor 5Step 1
In addition to having the Boolean equations
represent the design logic, the emulator must also
efficiently implement memories and support physical
IP bonded-out cores. For simulation acceleration, itmust also have a fast, low-latency channel to connect
the emulator to a simulator on the workstation, since
behavioral code cannot be synthesized into gates in
the emulator. For in-circuit operation, the emulator
needs to support connections to a target system and
test equipment. Finally, to provide visibility into the
design for debugging, the emulator contains a logic
analyzer (which will be described in a future article).
IP corehosting
Verilog and VHDL
High-speed RTL compiler
Behavioral
Runtime controland debugenvironment
Workstation
FullVision
C/C++ Incisive sim
SystemC HDL
High-speedin-circuitemulationinterface
Embeddedlogicanalyzer
High-speedco-simulationdata pump
Customprocessorarray
Programmablememory array
Palladium
Figure 2: Processor-based emulator architecture
Processors per ASIC 768256
ASICs per MCM 21
Processors per board 55,29616,640
Processors per system (16 boards) 884,736266,240
Maximum gates per board 16 million8 million
Maximum gates per system 256 million128 million
Memory chips per MCM 83
GBytes per system 7468
Domains per board (# users/bd.) 98
Processor cycle time 5.3ns7.5ns
Typical emulation speed 600KHz-1.5MHz
300750KHz
Maximum I/O pins per system 61,4404,224
ASIC geometry (Leff) .07.12
Transistors per MCM 1.4 billion100 million
Palladium IIPalladium
Table 1: Comparison of the original Palladium systemto Palladium II
Figure 3: Palladium II processor module
Incisive Newsletter December 2004 | 11
The custom silicon for Palladium II systems is designed
in-house and fabricated using IBMs 70-nanometer
(Leff
), 8-layer copper process (see Figure 3).
-
8/22/2019 Incisive Dec04
13/21
12 | Incisive Newsletter December 2004
During each time step, each processor is capable
of performing any four input logic functions using
as inputs the results of any prior calculation of any
of the processors and any design inputs or memory
contents. Processors are physically implemented
in clusters with rapid communication within those
clusters. The compiler optimizes processor scheduling
to maximize speed and capacity.
DESIGN COMPILATION
Compilation of an RTL design is completely
automated through the following sequence:
1. Map RTL code into primitive cells:
gates, registers, etc.
2. Synthesize memories
3. Flatten the hierarchy of the design
4. Reduce Boolean logic (gates) into four
input functions
5. Break asynchronous loops in the design
by inserting a register at an optimal place6. Assign external connections for the target system
and any hard IP
7. Set up any instrumentation logic required
(e.g., logic analyzer visioning)
8. Assign all design input and output to processors
in a uniform way
9. Assign each cell in the design to a processor
priority is given to assigning cells with common
inputs and/or outputs to the same processor or
cluster, and to assigning an equal number of cells
to each processor
10. Schedule each processors activity into sequential
time steps the goal is to minimize the total
number of time steps
The compiler also has to take into account simulation
acceleration connections, tri-state bus modeling,
memory modeling, non-uniform processor
connectivity, logic analyzer probing and triggering,
and other factors. But the Palladium compiler doesnt
have to cope with the highly variable FPGA internal
timing in FPGA emulators. For this reason processor-
based emulation compiles much faster and with
fewer resources. The compiler maintains all originally
designated RT-level net names for use in debugging,
in spite of the Boolean optimization it performs. This
allows users to debug with the signal names with
which they are familiar. (Clock handling in Palladium
technology was presented in the last newsletter.)
TRI-STATE BUS MODELING
Tri-state buses are modeled with combinatorial logic.
When none of the enables are on, the Palladium
system gives the user a choice of pull-up, pull-
down, or retain-state. In the latter case, a latch is
inserted into the design to hold the state of the bus
when no drivers are enabled. If multiple enables are
on, then for pull-up and retain-state logic 0 will
win, and for pull-down logic 1 will win. (Note:
this is a good place to use assertions.)
ASYNCHRONOUS LOOP BREAKING
Since the Palladium system does not model gate-level
timing (delays are 0), asynchronous loops are brokenautomatically by a delay flip-flop during compilation.
The Palladium compiler will automatically break
asynchronous loops without user intervention.
However, by allowing the user to specify where loop
breaks should occur, Palladium performance may be
enhanced, since the performance of the Palladium
system is related to the length of long combinatorial
paths. By inserting delay elements to break false
paths or multiclock-cycle paths, performance can
be improved if these paths are the critical paths of
the design. The breakNetand breakPin commands
provide a way of breaking loops or paths without
editing design sources.
LONG COMBINATORIAL PATHS
Palladium processors operate from an instruction
stack of 160 words (Palladium II) or 256 words
(Palladium). These are the time steps into which the
design calculations are sequenced. Occasionally a
design may include a very long combinatorial path
that cannot be scheduled into 160/256 sequential
steps. This does not necessarily mean that the path
has more than 160/256 gates, as scheduling
must take many time sequence constraints into
consideration. In such a case, the scheduler will
complete the path by scheduling the remainingBoolean operations in a second pass using the
unused processor time steps. A design with a long
combinatorial path can also be the result of trying
to squeeze too many gates into an emulator, but, as
a benefit, it provides a tradeoff between emulation
speed and capacity.
SUMMARY
Processor-based emulation has proven itself superior
to FPGA-based emulation for every design goal
or challenge: emulation speed, compilation speed,
debug productivity, number of users, maximum
capacity, and amount of memory (see Table 2).
Compile speed is ten times faster on one-tenth
the number of workstations minutes vs. hours.
Emulation speed is faster on nearly all designs an
average of 44% faster overall. The variety of debug
vision choices provide much faster signal trace data
display times six times faster on large designs.
While FPGA-based emulators have been getting
slower in emulation speed from generation to
generation, processor-based emulators have been
getting faster with each new generation.
-
8/22/2019 Incisive Dec04
14/21
Incisive Newsletter December 2004 | 13
Processor-based emulators have demonstrated thatthey are equally capable of handling a large number
of asynchronous clocks in a design without suffering
a performance impact. The ability of processor-based
emulators to instantly probe new signals and change
trigger conditions without requiring a slow FPGA
compile greatly improves the interactivity of
debugging. Processor-based emulators offer very
precise control over input/output timing, which may
be crucial for target environment interfacing. The
Palladium systems unique ability to support JTAG
ports for software debuggers, while using FullVision
for the hardware, delivers the highest speed for
software verification. The design experiments facilityof processor-based emulators increases debugging
productivity. Since users spend most of their design
time debugging, processor-based emulators can
deliver more design turns per day than FPGA-based
emulators. These design benefits translate into
shorter time to market for new products and higher
product revenue.
Compile speed 10-30 million gates/ hour on one CPU
Takes many hourson many CPUs
Emulation speed 600KHz-1.5MHz150-600KHz
Predictable, reliablecompiles
ExcellentFair
Maximum capacity 256 million gates30-120 million gates
Ability to handleasync. designs
GoodGood
Partitioning problems Found early inprocess
Not found untilindividual FPGAcompiles fail
Timing issues inemulation model
Avoided completelyPotential for setupand hold issues andsublet, hard to findtiming problems
Ability to make smallchanges quickly
Can downloadincremental changesto processor
Must dowloadentire FPGA
Processor-basedemulators
FPGA-basedemulators
Table 2: Comparison of FPGA-based and processor-based
emulators
-
8/22/2019 Incisive Dec04
15/21
Assertion-based verification (ABV) is growing rapidly
as engineers experience its many benefits. The value
of ABV is immediately apparent to designers who
easily find bugs that would have taken days to solve,
and to verification engineers who can clearly see
whether they have covered their test plans.
ABV functions on the premise that defects are easier
to fix when they are identified as soon after they
happen as possible. For example, you are better off
catching a FIFO overflow just as it happens, rather
than trying to debug it once the wrong data has
propagated to other blocks. Using assertions,
designers can capture the intention of their designs
(e.g., FIFOs should not overflow) and receive error
messages if the design violates these intentions.
While many engineers recognize the value of
assertions, they often run into the chicken-or-the-
egg problem of schedules. They cannot afford the
time to learn assertion languages like PSL, so they
dont reap the time-saving benefits that would occur
later. Cadence has developed the Incisive Assertion
Library to help solve this problem.
The Incisive Assertion Library (IAL) is a library of
50 Verilog/PSL modules that implement checksfor common design structures. For example, there
is an IAL element that will catch the FIFO overflow
mentioned above. The IAL helps engineers in
two ways:
1. Engineers can use the IAL modules as is
and instantiate them into their designs. These
engineers will immediately reap the benefits
of assertions without needing to spend time
learning PSL.
2. The IAL is delivered as Verilog source. Engineers
can use these modules as templates to create new
functions that were not shipped with the IAL.
This article will explain how to instantiate Incisive
Assertion Library modules into your design so you can
quickly take advantage of assertion-based
verification.
THE INCISIVE ASSERTION LIBRARY
BY RAY SALEMI AND DAVE ALLEN, CADENCE DESIGN SYSTEMS
04
USING THE INCISIVE ASSERTION LIBRARY
The Incisive Assertion Library ships with the Incisive
Unified Simulator, beginning with version 5.4. You
can find it in your Cadence installation under the
tools/ial subdirectory. To use the IAL in your designs,
youll need to do the following:
1. Instantiate the IAL modules you want to use into
your design.
2. Run simulation with the appropriate command-
line switches to enable specific IAL features.
INSTANTIATING IAL MODULES
IAL modules are simply Verilog modules, and you can
instantiate them in one of two ways:
1. You can instantiate the IAL modules inside of the
module you want to test. With this approach, the
IAL assertions will travel with the component
youre testing, which may be useful if the block is
re-used in other designs.
2. You can instantiate the IAL modules outside of
the object you want to test. This allows you to
use IAL modules without modifying the original
RTL. Figure 1 is an example of the second
instantiation method.
fifo #(DATA_WIDTH, ADDR_WIDTH, FIFO_DEPTH) duv_fifo (.reset_n(resetn),
.clk(clk),
.wr_en(enque)
.rd_en(deque)
.wr_data(in_data)
.rd_data(out_data)
);
ial_fifo #(FIFO_DEPTH, DATA_WIDTH) ial_c1 (.reset_n(resetn)
.clk(clk)
.rd_fifo(deque),
.wr_fifo(enque),
.data_in(in_data),
.data_out(out_data)
);
Figure 1: Instantiating an IAL element to test a FIFO
Instantiating this FIFO IAL module automatically gives
you two of the significant benefits of assertion-based
verification. You get assertions that catch errors and
you get functional coverage. Well look at these more
closely in the following sections.
14 | Incisive Newsletter December 2004
-
8/22/2019 Incisive Dec04
16/21
SIMULATING WITH IAL MODULES
Simulating with IAL modules is just like performing
any other Verilog simulation. You simply compile the
IAL modules along with the rest of your design, with
the appropriate command-line switches.
If you invoke your simulation using the single-step
ncverilog command, youll need to add the following
to your command line:-v /ial.v +assert
The -v option specifies that the ial.v library file
should be compiled with the rest of your design. The
+assert option enables the PSL assertions in the
Incisive Assertion Library. So, your simulation
command would look like this:
ncverilog -v /ial.v +assert
If you use the three-step ncvlog-ncelab-ncsim
command, youll need to add the following to your
ncvlog command line:
/ial.v -assert
Your ncvlog command line would look like this:
ncvlog /ial.v -assert
The IAL modules have additional capabilities that can
be enabled at compile time. In the first version, some
modules have additional coverage information and
can use a global reset signal. Table 1 shows the
additional capabilities and the command-line
switches needed to enable these capabilities:
ASSERTIONS IN INCISIVE ASSERTION
LIBRARY ELEMENTS
The FIFO IAL elements contain the assertions shown
in Figure 2.
Enable coverageassertions
-define IAL_COVERAGE_ON
+define+IAL_COVERAGE_ON
Define a globalreset signal
-define IAL_GLOBAL_RESET=
+define+IAL_GLOBAL_RESET=
ncvlog switchncverilog switchDescription
Table 1: Additional IAL module capabilities
For the global reset signal, is the full
hierarchical name of the signal you want to use.
Figure 2: Assertions in the FIFO IAL elements
Lets look at the ial_fifo_overflow assertion as an
example. This assertion catches an error when the
FIFO receives a write even though it has set its full
signal to true. The code for this assertion is as
follows:
psl property ial_fifo_overflow =
never (
((fifo_level == FIFO_DEPTH &&
(`IAL_RESET_SIGNAL)) &&
(({rd_fifo, wr_fifo}) == 2b01)
);
psl assert ial_fifo_overflow;
This assertion states you should never see that the
FIFO has reached its depth and receives a write signal.
If you see this situation, then someone else is
misusing the FIFO. In this case, the Incisive Unified
Simulator will print the following error message:
Ncsim: *E, ASRTST (time 4850 ns) Assertion
top.duv.ial_c1.ial_fifo_overflow has failed
This is a good example of the firewall techniques
many designers use in their blocks. Designers place
assertions at the input pins to their block to
ensure that they are getting correct input. This canhelp reduce debug time designers can quickly
determine if a defect is actually in their block or
caused by incorrect input.
Incisive Newsletter December 2004 | 15
-
8/22/2019 Incisive Dec04
17/21
FUNCTIONAL COVERAGE
The Incisive Assertion Library also automatically
creates a test plan for the module being checked by
creating functional coverage points. The functional
coverage points for the FIFO example are represented
in Figure 3.
INCISIVE ASSERTION LIBRARY
ELEMENT LIST
The IAL contains 50 elements that introduce
assertions to many common design elements. Figure 4
shows the list of elements scheduled for release in
January 2005:
Figure 3: FIFO functional coverage points
BASIC TYPESial_tristate
ial_one_hot
ial_one_cold
ial_zero_one_hot
ial_active_bits
ial_valid_bis
ial_constant
ial_next
ial_always
ial_never
ial_range
ial_bitcnt
ial_gray_code
ial_hamming_dist
ial_mutex
ial_timeout
INTERFACE TYPESial_follower
ial_leader
ial_seq
ial_width
ial_window
ial_stall
ial_together
ial_handshake
INTERFACE+CONTROL
TYPES
ial_outstanding_id
ial_fifo
ial_mclk_mport_fifo
ial_multiplexer
ial_arbiter
ial_case_check
ial_req_gnt_ack
ial_var_time_seq
ial_eq_frame
DATAPATH TYPESial_arith_overflow
ial_crc
ial_decoder
ial_encoder
ial_decr
ial_incr
ial_max
ial_min
ial_delta
ial_serial2parallel
ial_parallel2serial
ial_even_parity
ial_odd_parity
CONTROL TYPES
ial_mem_access
ial_mport_mem_access
ial_stack
ial_eq_seq
Figure 4: Comprehensive assertion library
As you can see, you can now tell whether you have
tested the FIFO at its corner cases. The IAL element
automatically tracks how many times youve performed
certain tasks, like read from it, written to it, and filled
it you automatically have a complete functional
test plan for the FIFO.
The Incisive Assertion Library functional coverage
points are supported by the Incisive platform andcan be read and analyzed using Incisive functional
verification tools.
SUMMARY
The Incisive Assertion Library is the fastest way to
take advantage of the benefits of assertion-based
verification. When you instantiate IAL elements,
you immediately begin reaping the benefits of ABV
without needing to learn PSL. When the time comes
for you to create your own PSL-based checkers, IAL
components will serve as a template to get you started.
16 | Incisive Newsletter December 2004
-
8/22/2019 Incisive Dec04
18/21
Did you know that SimVision enables you to
synchronize time ranges between multiple waveform
windows? That you can save time ranges and use
them in any waveform window? Or that you can
customize the zoom toolbar to display larger zoom
buttons? All of these features are available in
SimVision release IUS5.3 by simply using the zoom
toolbar in the waveform window, represented in
Figure 1.
SAVING TIME RANGES
Another useful feature of the zoom toolbar is theability to save time ranges and use them in all of the
waveform windows. When you drop down the time
range menu, you have the option to keep the current
time range (see Figure 3).
INCISIVE DEBUG AND ANALYSIS TIPS
BY RICK MEITZLER, CADENCE DESIGN SYSTEMS
05
Incisive Newsletter December 2004 | 17
Figure 1: Waveform zoom toolbar
WAVEFORM TIME RANGE LINKING
Employing the linking feature on the waveform
window allows you to open multiple waveform
windows that display different signals, but all at the
same time range. When you change the time range
on one waveform window (either by zooming ormoving to a different time range), the corresponding
time will display on all other linked waveform windows.
Just to the left of the time range entry in the toolbar
is an icon with a broken link. Clicking this icon drops
down a menu that lists all currently open waveform
windows. By clicking on the window names in the
menu, you can link the time ranges in the current
window to the other windows (see Figure 2).
Figure 2: Linking waveform time ranges
Figure 3: Time range menu
-
8/22/2019 Incisive Dec04
19/21
18 | Incisive Newsletter December 2004
The time range menu also gives you the option to
edit time ranges. When you select this option, a
properties window will appear and allow you to
modify the time ranges (see Figure 5). The in-place
editing option on the properties page enables you
to rename time ranges and change the start and
end times.
CHANGING ZOOM BUTTONS
When the zoom toolbar is updated to include the
above functionality, the zoom controls automatically
change to a new format that conserves space and
displays smaller zoom buttons. If you prefer the
larger zoom buttons, however, they are still available
to you through toolbar customization. First, select
View>Toolbars>Customize to bring up the toolbar
customization dialog, shown in Figure 6.
Figure 4: Time range dialog
Figure 5: Editing a time range in the properties window
Figure 6: Toolbar customization dialog
Once this dialog box is open, check the Zoom box
in the left pane. The right pane will list all the items
on the toolbar that can be modified (see Figure 7).
If you want to hide the new compressed zoom
buttons, simply clear the checkbox labeled
zoom_controls and then check the box next to
the zoom buttons you want to show. As you checkor uncheck boxes, the window will preview how the
new toolbar will look.
As you can see, the zoom toolbar on the waveform
window has a number of handy options in a small
space. For more information about the various
features of SimVision release IUS5.3, please refer
to our online SimVision documentation.
Figure 7: Modified zoom toolbar
A dialog box will appear, allowing you to name your
time range and, if desired, change the start and end
times (see Figure 4). After you save a time range, that
time range will be available in all waveform windows
in the dropdown menu.
-
8/22/2019 Incisive Dec04
20/21
INCISIVE PLATFORM NEWS AND EVENTS
PRESS RELEASES
New Palladium II Extends CadenceAcceleration/Emulation Leadership
October 25, 2004
Cadence Delivers Unparalleled Speed and Capacity to Tackle
the Most Complex SoC Verification
Cadence Announces Comprehensive Assertion-based Verification Solution
October 18, 2004
Expanded Support of PSL and SystemVerilog Assertions
Enables More Efficient Verification
Cadence Incisive Conformal Technology BecomesStandardized Solution for Fujitsu Worldwide
September 7, 2004
Deployment Helps Fujitsu Speed Time to Market and
Maximize First Silicon Success of Highly Complex Chips for
Multimedia, Consumer and Communications Applications
NEW COLLATERAL
White paper: Accelerated Hardware/SoftwareCo-verification Speeds First Silicon and First Software
http://www.cadence.com/whitepapers/Coverification_wp.pdfDemonstration: Cadence Palladium IIAccelerator/Emulatorhttp://www.demosondemand.com/clients/cadence/014/dod_
page/previews.asp#4
WORKSHOPS
This quarter, Cadence is offering the followingIncisive platform workshops:
Developing a SystemC Testbench
Developing Self-checking Designs Using Assertions
WEBINAR
Using Assertions to Check Your Designs
This webinar focuses on ways to increase the efficiency
of verifying your complex HDL code.
http://www.cadence.com/webinars/webinars.aspx?xml=abv
Incisive Newsletter December 2004 | 19
-
8/22/2019 Incisive Dec04
21/21
2004 Cadence Design Systems, Inc. All rights reserved. Cadence, the Cadence logo, Conformal, NC-Verilog, Palladium, and Verilog are registered trademarks and Incisive is a trademark of Cadence Design Systems, Inc. All others are
properties of their respective holders.
5693 12/04
Cadence Design Systems, Inc.
Corporate Headquarters
2655 Seely Avenue
San Jose, CA 95134
800.746.6223
408.943.1234
www.cadence.com