inception workshop 01 august 2012 united nations development programme ministry of emergency...

8
“Integrating Climate Change Risks into Water and Flood Management by Vulnerable Mountainous Communities in the Greater Caucasus Region”. Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Upload: marian-owens

Post on 18-Jan-2018

215 views

Category:

Documents


0 download

DESCRIPTION

The project aims to reduce vulnerability of the mountain communities to climate change induced water stress and flood hazards by improved water and flood management. This will be accomplished through  addressing the management framework at the legislative and policy level,  strengthening institutional capacity by introducing new non- structural methods and providing training,  empowering communities to actively participate in water and flood management

TRANSCRIPT

Page 1: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

“Integrating Climate Change Risks into Water and Flood Management by Vulnerable Mountainous Communities in the Greater Caucasus Region”.

Inception Workshop01 August 2012

United Nations Development Programme

Ministry of Emergency Situations of the Republic of Azerbaijan

Page 2: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Background

Many of the communities of the Greater Caucasus region of Azerbaijan, especially the mountain communities, are at risk from climate induced flooding and water stress.

The people have become resilient to the difficult conditions of the region, but now climate change is exacerbating both problems.

Reducing the vulnerability of these communities requires proactive adaptation to the impacts of climate change..

Page 3: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Project ObjectiveThe project aims to reduce vulnerability of the

mountain communities to climate change induced water stress and flood hazards by improved water and flood management.

This will be accomplished through

addressing the management framework at the legislative and policy level,

strengthening institutional capacity by introducing new non-structural methods and providing training,

empowering communities to actively participate in water and flood management

Page 4: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Project AreaThe proposed project area encompasses the southern side of the Greater Caucasus Mountains, extending from the northwest of this region, in the area of the towns of Belakan and Zagatala, toward the southeast near the towns of Ismayilli and Gabala. This covers an area of just over 22,000 km2. The whole area is part of the larger Kura River Basin, which is one of the two main rivers of Azerbaijan.

Page 5: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Project Outcomes

Outcome 1: Water and flood management framework is modified to respond to adaptation needs and improve climate risk management.

Outcome 2: Key institutions have capacities, technical skills, tools and methods to apply advanced climate risk management practices for water stress and flood mitigation.

Outcome 3: Community resilience to floods and water stress improved by introducing locally tailored climate risk management practices.

Page 6: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Project Budget

Total Budget 9,960,000

UNDP 260,000

GEF 2,700,000 Government (in parallel)

7,000,000

Page 7: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Project Progress

Project Document was signed between Ministry of Emergency and UNDP on 09 March 2012

Project Manager is recruited National Project Director is appointed by the

Minister of Emergency Internal Working group comprising experts from

the Ministry of Emergency is established Allocation of Project Premises discussed and

agreed National Consultant for Inception Workshop and

Inception Report is recruited Recruitment of National Lead Adviser is ongoing.

Page 8: Inception Workshop 01 August 2012 United Nations Development Programme Ministry of Emergency Situations of the Republic of Azerbaijan

Thank you for attention!