inaugural south region sme leaders innovation forum … · 2/2/2015 · the project delivery...
TRANSCRIPT
The project delivery specialists
Inaugural SOUTH Region SME Leaders Innovation Forum
28th January 2015
expertise.The project delivery specialists
Introductions
2
Paul O’Leary
Engineering Manager
Ray Smiddy
3D Coordinator
Pa O’Donoghue Mechanical Engineering
Department Manager
Agenda
1) Introduction to PM Group
2) Our connections to higher education institutes (HEI’s)
3) Example: What innovation means to us?
4) Case study: creating a new course.
5) Feedback for the HEI’s
3
The project delivery specialists
PM Group – An Introduction
expertise.The project delivery specialists
The Project Delivery Specialists
You can rely on our team of 2,200+ people to deliver your project successfully
• Integrated Design and Construction firm
• Proven track record since 1973
• Employee-owned company
• Revenue over €300 million
• 18 offices worldwide
• Projects in 30 countries
5
Worldwide Office Network
International Office Network
BelgiumChinaCzech Republic IndiaIreland
PolandRussiaSaudi ArabiaSingaporeSlovakia
TurkeyUnited KingdomUnited States
6
Our services
Project & Programme
Management
Engineering Design
Architecture Construction Management
Health & SafetyOutsourced Technical Services
Managed Services
Commissioning
&
Qualification
Environment & Sustainability
Consultancy
7
Sectors Focus
8
Food
EnergyMedicalTechnology
Healthcare
AdvancedManufacturing
International Financial Institutions
Biopharma MissionCritical
World Class Safety Performance
10
MERCK Vaccines & Biologics Facility:
• 1 Million hours without LTI
• Over 500 people on site
• ‘Best International Project’ in Curt Safety Awards
SHELLCorrib Onshore Gas Terminal:
• 1 Million hours without LTI (consecutively 2008, 2009, 2010)
• Over 1,300 people on site
• NISO Safety Award
The project delivery specialists
connected
Our connections to higher education institutes
connected.The project delivery specialists
Cork Office’s Connections to HEI’s
1. Education
• Employee education assistance scheme
• New piping design course at CIT
2. Corporate Social Responsibility Program
• Academic external assessor
• One off guest lectures
• Sponsorship of Masters students
• CIT Industry Advisory Panel 2014
• UCC Industry Advisory Panel 2015
3. Recruitment
• Interns
• Career Fairs
• Hire 15-20 graduates per annum
Why Interns? Email from client senior manager to CEO
13
Dave, We have come to the very final phase of a $30mm investment in our project here in Ringaskiddy. We were extremely fortunate to have the services of one of your less experienced colleagues – Cillian …...….. the project team have given me very strong feedback – consistent with my own experience, …. He has shown tremendous dedication and skill throughout the project lifecycle – well surpassing the expectations of some of the most experienced project engineers – myself included. He has done an exemplary job …… interacted with all of the various disciplines and contractors and ensured tight control and coordination throughout the whole project such that we have had the highest possible performance in terms of quality and document completion.On a personal level he has demonstrated maturity and calmness at all times and maintained the persona of a true gentleman.On behalf of my colleagues and myself, I want to take this opportunity to congratulate him and wish him every success in what is assured to be a stellar career.Sincerely,
The project delivery specialists
example
innovation.The project delivery specialists
What innovation means to us
What innovation means to us: BIM
15
1. Enhancing 3D tools : in-house R&D
2. Use of CGI
3. 3D (space) & 4D (time) & 5D (cost)
4. Design to cost
The project delivery specialists
Case study
cooperate.The project delivery specialists
Creating a new course
Example project: Pharmaceutical Sector
17
Ingredients
• Field
• €250M
• Client: Statement of requirements
Space is money
• 3D build not 3D design
• > 1,000 pieces of equipment
• Layout / Adjacency
• 50 km of pipe (Charleville)
• 200 km of cables (Dublin)
• 15 km of ducting (Midleton)
Project team size (design phase): typical size
18
Project
Manager
Architects
10
Civil /
structural
10
Process /
equipment
20
3D &
Piping
30
EIA
20
Building
services
15
Other
10
Project Engineers,
Project Controls,
Procurement,
15
No college course exists for 25% of
the team
3D & Piping Team Ideal Composition: mix of junior to senior
19
3D coordinator
3D coordinatorLead
Designer
Designer
Senior Designer
Intermediate
designer
Senior Designer
Junior Designer
Designer
Lead
Designer
Intermediate
designer
Junior Designer
3D & Piping Team Actual Composition:all seniors as there wasn’t a feeder club
20
3D coordinator
3D coordinatorLead
Designer
Senior Designer
Senior Designer
Lead
Designer
Senior Designer
Senior Designer
Senior Designer
Senior Designer
Senior Designer
Senior Designer
Steps to developing a springboard course with CIT
• Grey hair review of course outline
• Building blocks
• CIT: Relevant existing modules
• PM: in-house training modules
• Feels like a bespoke course for PM Group
• Approx. 6 month process
Feedback
• PM provides training to graduates on 3D tools
• Revit, SP3D, Intools, SPPID
• Engineering Courses – Biopharma content?
• Need: More Process Engineers, Project Managers, Schedulers
• Need: Level 6: E/I & building services & structural designers
• Suggestion: Blended course or elective modules within existing courses
• Process safety (Level 8: Process Engineering)
• Project manager (Level 8: Engineering)
• Internships – work!
• Piping design course – good candidates.
• Graduates are impressive
Thank you - contact us at …
Paul O’LearyEngineering ManagerT: 021 4522912
M: 087 7382076