inab complaint policy€¦ · web viewwilton park house, wilton place, dublin 2, ireland tel +353 1...

2
Wilton Park House, Wilton Place, Dublin 2, Ireland Tel +353 1 607 3003 Fax +353 1 607 3109 E-mail [email protected] Web www.inab.ie Notification of intent to perform EMAS verification/validation activity AF-3E Please complete the following details at least four weeks prior to performing EMAS verification/validation activities: Verification body name/ Name of licenced verifier: Accreditation or licence details: If possible, please provide hyperlink to schedule on accreditation/licensing body’s website, which will provide evidence that accreditation/licensing is still valid and not affected by suspension or withdrawal and that the scope of accreditation/licensing covers the specific activities of the organization under verification. Verification team composition: Competence of team: In particular, related to legal requirements specific to the environment in the industrial sector being verified Time and place of the verification/validation: Address and contact details of the organisation whose system is being verified: INAB use only: AF-3-E Notification of intent to perform EMAS verification/validation activity Issue 1 February 2016 Page 1 of 2

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INAB Complaint Policy€¦ · Web viewWilton Park House, Wilton Place, Dublin 2, Ireland Tel +353 1 607 3003 Fax +353 1 607 3109 E-mail inab@inab.ie Web Wilton Park House, Wilton

Wilton Park House, Wilton Place, Dublin 2, IrelandTel +353 1 607 3003 Fax +353 1 607 3109 E-mail [email protected] Web www.inab.ie

Notification of intent to perform EMAS verification/validation activity

AF-3E

Please complete the following details at least four weeks prior to performing EMAS verification/validation activities:Verification body name/Name of licenced verifier:

     

Accreditation or licence details:If possible, please provide hyperlink to schedule on accreditation/licensing body’s website, which will provide evidence that accreditation/licensing is still valid and not affected by suspension or withdrawal and that the scope of accreditation/licensing covers the specific activities of the organization under verification.

     

Verification team composition:      Competence of team:In particular, related to legal requirements specific to the environment in the industrial sector being verified

     

Time and place of the verification/validation:

     

Address and contact details of the organisation whose system is being verified:

     

INAB use only:Date notification received      

AF-3-E Notification of intent to perform EMAS verification/validation activityIssue 1 February 2016 Page 1 of 2

Page 2: INAB Complaint Policy€¦ · Web viewWilton Park House, Wilton Place, Dublin 2, Ireland Tel +353 1 607 3003 Fax +353 1 607 3109 E-mail inab@inab.ie Web Wilton Park House, Wilton

Wilton Park House, Wilton Place, Dublin 2, IrelandTel +353 1 607 3003 Fax +353 1 607 3109 E-mail [email protected] Web www.inab.ie

Notification satisfactory:If notification is unsatisfactory, give details.

     

AF-3-E Notification of intent to perform EMAS verification/validation activityIssue 1 February 2016 Page 2 of 2