in support of army’s transformation briefing for ndia ... · project number task number work unit...

22
MINES, COUNTERMINE AND DEMOLITIONS In Support of Army’s Transformation Briefing for NDIA Firepower Conference 20 June 2001 The Oldest PM Office Established 1961 BRIEFER: Colonel Bud Irish Project Manger for Mines, Countermine and Demolitions DSN: 880-7041 email <[email protected]>

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

MINES, COUNTERMINE AND DEMOLITIONS

In Support of Army’s Transformation

Briefing for

NDIA Firepower Conference

20 June 2001

The Oldest PM OfficeEstablished 1961

BRIEFER:Colonel Bud Irish

Project Manger for Mines,Countermine and Demolitions

DSN: 880-7041email <[email protected]>

Page 2: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Report Documentation Page

Report Date 20JUN2001

Report Type N/A

Dates Covered (from... to) -

Title and Subtitle Mines, Countermine and Demolitions

Contract Number

Grant Number

Program Element Number

Author(s) Irish, Bud

Project Number

Task Number

Work Unit Number

Performing Organization Name(s) and Address(es) TACOM

Performing Organization Report Number

Sponsoring/Monitoring Agency Name(s) and Address(es) NDIA (National Defense Industrial Association 2111Wilson Blvd., Ste. 400 Arlington, VA 22201-3061

Sponsor/Monitor’s Acronym(s)

Sponsor/Monitor’s Report Number(s)

Distribution/Availability Statement Approved for public release, distribution unlimited

Supplementary Notes Proceedings from Armaments for the Army Transformation Conference, 18-20 June 2001 sponsored by NDIA

Abstract

Subject Terms

Report Classification unclassified

Classification of this page unclassified

Classification of Abstract unclassified

Limitation of Abstract UU

Number of Pages 21

Page 3: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Where We Fit in the Tank-automotive &Armaments Command (TACOM)

DSA

PM-TAWS

PM-HTV

PM-CMS

PM-Paladin

PM-MortarsPM-LTV

PM-MCD

TACOMCG

ACALA Acq CenterResource

Management DSA

ARDEC IMMC TARDEC

PM-SmallArms

PM-LAV

Over 300 Systems$7.4B Procurement$828M RDTE$1.1B FMS

Page 4: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Organization

MINESDIVISION

DEMOLITIONSDIVISION/NON

LETHAL

COUNTERMINEDIVISION

PROGRAMMANAGEMENT

DIVISION

PROJECT MANAGER

COL Bud Irish

John Rosamilia Larry Nee Jim Tower George Firrincili

DEPUTYPROJECT MANAGER

Chuck Digney

TSM ECS

DCD MANSCEN

USSOCOM

USMC

ARDEC

NVL

CECOM

ARL

Page 5: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

TACOM Operates at theHeart of Army Transformation

ObjectiveForce

Interim Force

CombatSupport

Objective Force

211 SYSTEMSACROSS

THE FULLSPECTRUM

CombatServiceSupport

GroundCombat

Legacy Force

Page 6: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

The Army Transformation

Initial BCT

LegacyForce

ObjectiveForce

InterimForce

Interim

Sustain & Recapitalize

S&T R&D Procurement

Transform

Transform

ObjectiveForce

2000First

InterimBCT

First UnitEquippedObjective

2003

TechSolutions

. . . Responsive, Deployable, Agile, Versatile,Lethal, Survivable, Sustainable

Initial BCT Interim

Page 7: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Magnetic Signature Duplicator*

BCT Engineer Squad Vehicle (ESV)

Lightweight Plow and Roller*

Obstacle Marking System*

TowedESMC or Volcano

9-Hornets, 2-APOBS, 8 SLAMS, 3-PSS-12/HSTAMIDS

* Included in IAV RFP

Page 8: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Explosive Standoff Minefield Clearer

(ESMC)

95% effective in clearing a lane BCT FUE 2QFY05

Defeats all approved Threat ATmines

VariantsBCT 70 x 3.3 m

Legacy 100 x 4.3 m

Page 9: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

• Mounts on M200A1 trailer• 2 - 40 port racks• 40 M87A1 Canisters Per Rack/6 Anti-Tank Mines Per Canister• Maximum of 480 Mines Per

Mission

VOLCANO(Warfighting Capability for BCT)

Page 10: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Wide Area Munition (Hornet)

l One Man Portable - 35 lbs. Max.

l 100M /360° Effective Radius

l Autonomous Arm to Kill Sequence

l Target Prioritization, Heavy & LightTrack

l Remote Control - M71 RCU

l 30 Day Operational Life

l Supports Early Entry Entry Operations- 82nd ABN DIV

Advanced Hornetl Two-way commo - 3 km

l Dual Mode Airborne sensor

l Minefield mapping

l Redeployability

Page 11: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

• Versatile Package of COTS, GSA & NDI Items AsWell As New & Innovative Technologies• CINC Requested & DA Directed Program toProcure & Field 10 Sets in FY00 & 01

• Urgently Fielded First Set to Kosovo on 18 April 00• Four Additional Sets Crane• Requirement Is for 30 - 90 Sets• Funded for < 30 Sets in POM

Non-Lethal Capabilities Set (NLCS)

50+ types of items, 5 categories:1 - Individual Protective Equip.2 - Munitions3 - Individual Enhancement4 - Mission Enhancement5 - Training Devices

DESCRIPTION

Page 12: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

SELECTABLE LIGHTWEIGHTATTACK MUNITION

(SLAM)

• 2.2 LBS - EFP WARHEAD

• BETTER PERFORMANCE THAN FASCAM

• MAGNETIC BOTTOM ATTACK

• PASSIVE INFRARED SIDE ATTACK

• TIME DEMOLITION, COMMAND DETONATION, SELF DESTRUCT

Page 13: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Anti-Personnel Obstacle Breaching System

(APOBS)

In productionCertified insensitive munition

Set-up < 2 Min35M stand-off

Two man portable

IOC Jun 02 Complex obstacle breacher.6-2M x 45 M path

Page 14: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Handheld Standoff Minefield Detection System

(HSTAMIDS)

FUE 4QFY04Light weight 7-8 lbs

High detection/ Low false alarm rates

Locates mine within .15m Integration efforts with Land Warrior

Page 15: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

The Army Transformation

Initial BCT

LegacyForce

ObjectiveForce

InterimForce

Interim

Sustain & Recapitalize

S&T R&D Procurement

Transform

Transform

ObjectiveForce

2000First

InterimBCT

First UnitEquippedObjective

2003

TechSolutions

. . . Responsive, Deployable, Agile, Versatile,Lethal, Survivable, Sustainable

Sustainment & Recapitalize

Page 16: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

SOLDIERCONTROLLER

WITH APLARADIO

INTRUSION-SENSINGCONTROL

UNITS - ICUs

RFCOMMO

LINK(UP TO1KM)

REPEATER BOOSTS RF COMMO LINK RANGE

Non Self-Destruct Alternative (NSD-A)

• Discriminates (MITL)• Replaces M14/M16

Page 17: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

FIGHTING POSITION EXCAVATOR(FPE)

Reducestime topreparefightingpositionfrom fiveshours to aslittle as onehour

Page 18: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Ground Standoff Minefield Detection System

(GSTAMIDS)

Forward looking detection.Standoff neutralization.Fits on most vehicles.

Improved detection platform.Explosives confirmation.Improved neutralizer.

All AT Mine detection.Mechanical neutralization.Ten systems.

Metal AT mine detectionProofing and spares.

Fielded: 1 FLW, 9 SIAD

Page 19: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

The Army Transformation

Initial BCT

LegacyForce

ObjectiveForce

InterimForce

Interim

Sustain & Recapitalize

S&T R&D Procurement

Transform

Transform

ObjectiveForce

2000First

InterimBCT

First UnitEquippedObjective

2003

TechSolutions

. . . Responsive, Deployable, Agile, Versatile,Lethal, Survivable, Sustainable

S&T ProcurementR&DSTAMIDS

RAPTOR

Page 20: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

Raptor Control

Station

WAMs

Gateways

Sensor

Antenna

Satellite

CORE RAPTOR

• ENHANCED MINEFIELDEFFECTIVENESS THROUGH: - COMMUNICATION,COMMAND AND CONTROLOF ADVANCED HORNET - COORDINATED ATTACKS& TACTICS

• INCREASED SITUATIONALAWARENESS

Page 21: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

. .. .. .. .. . . .. .. .. .. .

Airborne Standoff Minefield Detection System

(ASTAMIDS)

Initiating IPT to research alternative and dedicated platforms FUE ~FY11

Transition from NVESDLAMD ATD FY03/04

Integrates multiple sensors to detectsurface and recently buried minefields

Employ automatic targetrecognition algorithms toanalyze sensor and image data

Page 22: In Support of Army’s Transformation Briefing for NDIA ... · Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) TACOM Performing Organization

PM-MCD Support To