in side corridor · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir...

10
PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR CHC AT KOHIR (V)& (M), MEDAK (D) TELANGANA STATE AUGUST 2016 PREPARED FOR TELANGANA STATE MEDICAL SERVICES AND INFRASTRUCTURE DEVELOPMENT CORPORATION PREPARED BY S.KUMAR Architects & Engineers H.no. 3-9-7/4/B, Sharadanagar, Ramanthapur, Hyderabad-500013 Ph.no. 040-27032699, 9885852938 DETAILS OF EXISTING CHC HOSPITAL AT KOHIR (V)& (M), MEDAK (D) Telangana State Total Site Area - 2.54 ACRES,10311.7506 SQ.M Total Construction Plinth Area - 1088.88 SQM Open Area -8676.7606 SQM Road Area - 172.33 SQM SNO Description Structure Area of Structure (Sqm) Number of floors Height (M) Frame Type Structural Assessment Year of Construction 1 KOHIR CHC BULDING BLOCK-A RCC Sub Structure & Super Structure GF –1088.88 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS _ 2 OLD UN USED BUILDING BLOCK-B RCC Sub Structure & Super Structure GF –144.56 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS _ 3 OLD UN USED BUILDING BLOCK-C RCC Sub Structure & Super Structure GF –173.76 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS _ 4 OLD UN USED BUILDING BLOCK-D RCC Sub Structure & Super Structure GF –55.46 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS _

Upload: others

Post on 14-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical

PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR CHC AT KOHIR (V)& (M), MEDAK (D) TELANGANA STATE

AUGUST 2016

PREPARED FOR

TELANGANA STATE MEDICAL SERVICES AND INFRASTRUCTURE DEVELOPMENT CORPORATION

PREPARED BY

S.KUMAR Architects & EngineersH.no. 3-9-7/4/B, Sharadanagar,Ramanthapur, Hyderabad-500013Ph.no. 040-27032699, 9885852938

DETAILS OF EXISTING CHC HOSPITAL AT KOHIR (V)& (M), MEDAK (D)

Telangana State

Total Site Area - 2.54 ACRES,10311.7506 SQ.M

Total Construction Plinth Area - 1088.88 SQM

Open Area -8676.7606 SQM

Road Area - 172.33 SQM

SNO Description StructureArea of Structure (Sqm)

Number of floors

Height (M)

Frame Type

Structural AssessmentYear of Construction

1 KOHIR CHC BULDINGBLOCK-A

RCC Sub Structure & Super Structure

GF –1088.88 Ground f 3.65 Rigid Frame

STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS

_

2 OLD UN USED BUILDING BLOCK-B

RCC Sub Structure & Super Structure

GF –144.56 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS

_

3 OLD UN USED BUILDING BLOCK-C

RCC Sub Structure & Super Structure

GF –173.76 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS

_

4 OLD UN USED BUILDING BLOCK-D

RCC Sub Structure & Super Structure

GF –55.46 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS

_

Page 2: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical

FRONT ELEVATION

LEFT SIDE ELEVATION

CHC AT KOHIR

Page 3: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical

CHC AT KOHIR

RIGHT SIDE ELEVATION

OLD BUILDING

IN SIDE CORRIDOR

PHARMACY ROOM

Page 4: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical

CHC AT KOHIR

GENERAL WARD

LABOUR ROOM

TERRICE

Page 5: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical

CHC AT KOHIR

STAIR CASE

Page 6: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical
Page 7: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical
Page 8: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical
Page 9: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical
Page 10: IN SIDE CORRIDOR · 2019-04-22 · preparation of survey map and asset mapping for chc at kohir (v)& (m), medak (d) telangana state august 2016 prepared for telangana state medical