in a “conservative” rail - transportation - idc.ac.il · milestone in the development of rail...
TRANSCRIPT
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
Yossi Daskal
CCR Israel.
June 2016
The Mobility Revolution
in a “conservative”
rail - transportation .
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
Milestone in the development of rail transportation.
2
1863 - Tube in London .
1869 - Subway in New York.
1890 - Tram in Vienna.
1901 - First electrical locomotive in Germany .
1981 – Train running 280 Km/h in France .
Today - Passengers trains can run 380 Km/h.
The Maglev (Magnetic Levitation)
500 Km/h.
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
UN Research - directions in transportation in the world.
3
Air
Rail
BUS
private car
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
Curabitur a mauris eget lorem accusam
commodo.
Maecaeans vehicula lacus non libero
bidendum dapibus.
Population Growth1
Total
population [billion]
Rural [billion] Urban [billion]
70%
30%
100%
4.1
6.1
8.0 9.2
1975 2000 2025 2050
The Urbanization is become different…
4
Challenge:
Increasing demand for
passenger transportation,
esp. in urban areas.
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
5
Ve
hic
le c
ap
acity
Vehicle speed
Capacity vs. Speed of an Ideal Metropolitan Network
Commuter
Suburban
(1250)
Monorail
(900)
BRT (120)
Bus (50)
Taxi (4)
LRT (250)
Metro
(1000)
Bicycle (1)
Number of people transported
per hour in urban environment.-
PPHPD
50,000
22,000
2,000
9,000
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
6
Control & Communication Center
With out CCC
2 products from the “Revolution”
PRIMOVE wireless charging Monorail system
Logistic
Providers
City Busses Tramways
Li-Ion
Battery
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
8
News in infrastructure – TBM & Laying of tracks
length – 100 m.
weight – 800 t.
Dig ~ 25 m a day.
Operations team - 25 p.
Concrete elements
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
What change the attitude to the private car ? Only if you have alternatives…
Profitability – cost , save time , more comfortable, use the time in better way.
Reliability – on time , safety , good service.
Availability - waiting in a station not more then 10-15 minutes.
walking to the station not more then 5 minutes.
solutions for Special Needs .
9
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
To Station Model - availability of mobility solutions.
10
x≤400m x≤400m
Suburban InterCity
suburban Urban
Metropolitan
Origin Destination
PR
IVA
TE
AN
D C
ON
FID
EN
TIA
L
© B
om
bard
ier
Inc. or
its s
ubsid
iarie
s. A
ll rig
hts
reserv
ed.
11
Less Road Accidents.
Energy costs.
CO2 Pollution.
Traffic Jams.
Land for roads and Parking.
Standard of living.
The future innovation in rail transportation will help to improve:
מטר 1200
מטר 30