Improving Project Performance
1
How PDRI can improve your project performance
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
• Benefits of PDRI • What is PDRI? • Value • Who uses it? • How is PDRI being used? • What we offer
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
2
Benefits of PDRI
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
• Higher probability of meeting cost and schedule • Lower percentage of change orders • Better team alignment and communication
– Contractor / owner communications • Improved risk assessment • Ability to make “trade-off” decisions • Can be used in developing project portfolio
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
3
• Higher probability of meeting cost and schedule • Standardized scope package • Ability to measure scope definition • Avenue to communicate and reconcile differences • Monitor progress in planning phase • Minimize design rework
– Fewer change orders
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
What Is PDRI?
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
4
• An Acronym – Project Definition Rating Index
• An Index – Score along a continuum representing the level of
scope definition • A Risk Management Tool
– Identifies and measures risks related to project scope definition
• Developed by Construction Industry Institute – Affiliated with University of Texas, US
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
5
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Industrial Buildings Sec%ons: 3 3
Categories: 15 11
Elements: 70 64
Score Low: 70 64
Score: High 1000 1000
Improving Project Performance
6
Elements: 70 for industrial and 64 for buildings
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
A1. Reliability Philosophy
A list of the general design principles to be considered to achieve dependable opera%ng performance from the unit. Evalua%on criteria should include:
Jus%fica%on of spare equipment
Control, alarm, and safety systems redundancy
Extent of providing surge and intermediate storage capacity to permit independent shutdown of por%ons of the plant
Mechanical / structural integrity of components (metallurgy, seals, types of couplings, bearing selec%on, etc.)
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
7
Note: Score is weighted per criteria – weighting not shown here
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Value
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
8
1000 Points
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
N = number of projects
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
9
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
10
• A score – Represents a continuum – Relative to timing – Only as valid as effort/seriousness
• Accuracy (the real score) can be improved with facilitation
• Perhaps is not the most important output of the assessment – Working towards improvement of score
provides benefit This copyrighted material is the property of Project Auditors,
LLC, and may not be reproduced without written permission.
Who uses it?
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
11
PDRI TYPE PDRI USAGE
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
• Saudi Aramco / Aramco Services, Chevron, Conoco Phillips
• NASA, Smithsonian • Jacobs Engineering, Bechtel, ABB Lumus, Black
& Veatch, Cargill, KBR
Improving Project Performance
12
How is PDRI Being Used?
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
• As a checklist in early project development (81%)
• As a “gate” check before moving to the next project phase (72%)
• In conjunction with other front end planning measurement methods (72%)
• As a means of measuring or benchmarking front-end planning process performance (70%)
• More than once on most projects (42%)
Source: CII, Gibson, 2007
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
13
• Other usage of PDRI:
– As an audit tool (42%)
– In a modified form for small or unusual projects (33%)
– To help capture lessons-learned (28%)
Source: CII, Gibson, 2007
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
What We Offer
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
14
• Can be performed during pre-planning – Chevron does multiple
times during front-end planning for larger projects, once for smaller ones
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
• Management discussions (variable) • Time to provide explanation of PDRI
and value: half hour • Two-and-a-half to four hours initially
per package • Report time is additional • Management briefing • Risk mitigation is additional
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
15
• One day course • Agenda
– Value of process – History – Case study – Explanation of building and
industrial PDRIs – Role play exercise – Personal action plan
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Summary
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
Improving Project Performance
16
• PDRI is a tool that works
• PDRI should be used with care
• “Score” is good
– Process of getting there provides additional value
• How will your organization be using this leading practice in the future?
This copyrighted material is the property of Project Auditors, LLC, and may not be reproduced without written
permission.
For more information, contact us