![Page 1: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/1.jpg)
Improvements to the U.S. Nuclear Regulatory Commission’s Operating
Experience Program and Future Challenges
Commissioner Peter B. LyonsU.S. Nuclear Regulatory Commission
Improving Nuclear Safety Through Operating Experience Feedback
- Present Challenges and Future Solutions -May 29, 2006
![Page 2: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/2.jpg)
2
NRC Strategic Objective
Enable the use and management of radioactive materials and nuclear fuels for beneficial civilian purposes in a manner that protects public health and safety and the environment, promotes the security of our nation, and provides for regulatory actions that are open, effective, efficient, realistic, and timely.
![Page 3: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/3.jpg)
3
Key Strategy
Evaluate and utilize domestic and international operational experience and events to enhance decision-making.
![Page 4: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/4.jpg)
4
The Message
Learn from your experiences and those of others.
![Page 5: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/5.jpg)
5
Operating Experience (OpE) History
• In the 1970s, NRC had no systematic method for evaluating collected data
• Post-TMI, NRC created the Office of Analysis & Evaluation of Operational Data (AEOD), and the Institute of Nuclear Power Operations (INPO) was formed
• In 1994 and 1998, task group evaluations made many recommendations – Eliminating unnecessary functions– Eliminating or reducing overlap
![Page 6: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/6.jpg)
6
OpE History
• In 1999, the Office of AEOD was dissolved. Functions were split between two separate offices (NRR and RES)
• In 2003, Davis-Besse Lessons Learned Task Force found shortcomings in agency’s OpE activities
• In 2004, staff developed the framework and infrastructure for a new OpE program for reactors
![Page 7: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/7.jpg)
7
Revised Reactor OpE Program Launched January 2005
• Established a central clearinghouse to collect, communicate, and evaluate reactor OpE information and apply the lessons learned
• Many improvements– international OpE now a formal element of
screening process– new database and internal Web access page– increased interaction between HQ, regions,
and technical staff
![Page 8: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/8.jpg)
8
Program at a Glance
![Page 9: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/9.jpg)
9
Reactor OpE Program Input – Output Overview
Screening
Communication
Evaluation
Application
Incident Reporting System (IRS)Internal Nuclear Event Scale (INES)
International OpE
Daily Events ReportsPlant Status Reports
Licensee Event ReportsPart 21 Reports
Domestic OpE: Industry
Inspection FindingsMorning Reports
Preliminary NotificationsRegional Project Calls
Studies/Trends
Domestic OpE: NRC
OpE Clearinghouse
Generic CommunicationsMorning Reports
OpE BriefingsCommunications
Web Page
Informing Stakeholders
InspectionLicensing
Influencing Agency Programs
RulemakingInformation Request
Taking Regulatory Actions
Storage
![Page 10: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/10.jpg)
10
OpE Areas of Attention• EPU-related issues at Quad
Cities– Steam dryer cracking– Failure of electromatic relief
valves• Standing wave in valve
standpipe
• Turbulent flow passing over a cavity creates vortices that produce pressure pulsations
• When the frequency of standing wave coincides with the frequency of pressure pulsations, high amplitude pressure fluctuations take place.
![Page 11: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/11.jpg)
11
OpE Areas of Attention -Electrical Grid Reliability
U.S. Federal Energy Regulatory Commission
U.S. Nuclear Regulatory Commission
![Page 12: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/12.jpg)
12
OpE Areas of Attention• Service water system degradation
– Silt/sand intrusion events– Shaft/coupling failures– Several generic communications issued
Before After
![Page 13: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/13.jpg)
13
Unauthorized Intruder in Service Water Intake Structure
![Page 14: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/14.jpg)
14
OpE Areas of Attention – External Events/Natural Phenomena
• Hurricane Andrew, a Category 5 hurricane, hit Turkey Point with sustained winds of 145 miles per hour (mph) and gusts up to 175 mph (1992)– Improvements made from Andrew lessons learned resulted in
improved performance during 2005 hurricane season• Improved communication infrastructure• Improved interaction with FEMA prior to plant restart
– Lessons learned from 2005 hurricanes• Greater focus needed on materials licenses during events• Develop an NRC procedure for response to natural events• Provide better accountability for inspectors sent to the sites• Improve diversity and reliability of agency communications
![Page 15: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/15.jpg)
15
Other OpE Areas of Attention
• Gas intrusion into safety systems– Indian Point 2 (“White” finding)
• Design control issues– Kewaunee turbine building flooding
(“Yellow” finding and INES Level 2 event)
• Shutdown/low power events/conditions– Waterford RCS vacuum/void transfer
events (Special Inspection)
![Page 16: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/16.jpg)
16
No Risk – High Impact
• Some operating experience involves no public health impact, but may require significant regulatory attention
• For example: Inadvertent release of small amounts of tritium to the environment – can create strong public concern and a significant challenge for the regulator
![Page 17: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/17.jpg)
17
Inspector Access to OpE• OpE Gateway website provides access to several searchable
databases for inspector use– Inspection findings– Generic communications– 50.72 event notifications & other event reports– 50.73 licensee event reports– Inspection reports– INPO SEE-IN documents (SOER, SER, SEN, O&MR)– Part 21 reports– International OpE (IRS, INES)
• OpE community forum provides prompt notification of relevant OpE to various inspectors
• Regional offices share relevant OpE during morning conference calls
![Page 18: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/18.jpg)
18
International OpE Activities
• Full participation in the International Nuclear Event Scale of IAEA and OECD/NEA
• Participation in Incident Reporting System of IAEA and OECD/NEA
• Exchange of operating experience through routine interfaces, meetings, conferences, and agreements
• Availability of domestic operating experience for public access
![Page 19: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/19.jpg)
19
Reactor OpE Program2005 Successes
• Over 1000 OpE items screened
• 127 OpE communications to technical staff
• 30 OpE issues evaluated and closed
• 7 OpE senior management briefings
• All daily reports evaluated for INES rating
• 66 Generic Communications issued
• 30 technical groups formed to review OpE
![Page 20: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/20.jpg)
20
Future Challenges
• Continued focus on sharing and applying OpE by the regulator and the industry
• Obtaining OpE on new reactor construction/operation
![Page 21: Improvements to the U.S. Nuclear Regulatory Commission’s Operating Experience Program and Future Challenges Commissioner Peter B. Lyons U.S. Nuclear Regulatory](https://reader036.vdocuments.us/reader036/viewer/2022062320/56649cec5503460f949b7f76/html5/thumbnails/21.jpg)
21
Documents & Guidance
To find NRC’s publicly available documents on OpE, go to the “Electronic Reading Room” at:
www.nrc.gov