KONE Building Information Modeling (BIM) workflows provide construction teams with relevant constructability information and geometry related to the vertical transportation of a project. When a project integrates BIM for vertical transportation, there is significant benefit to the communication and collaboration during a project’s pre-construction planning phases. IMPROVED CONSTRUCTION PLANNING WITH KONE BIM BIM FOR ENHANCED COLLABORATION BIM is about more than just digital 3D models. It enables more meaningful collaboration amongst project stakeholders and a higher level of predictability at the construction site. KONE provides data rich BIM content specific to a project and can contribute to advanced BIM deliverables including project timeline simulation and owner BIM handover requirements. These models include major coordination items like building interface elements and can be placed, by KONE, in the correct position in the aggregate project model for planning and coordination purposes. This decreases the workload of the BIM coordinator and provides higher quality geometry than could be produced by a third party. Project specific BIM in Revit, Industry Foundation Classes (IFC) or Navisworks (NWC) formats for either each piece of equipment or the overall project Interaction with the preconstruction 3D coordination process to ensure consistency with the traditional 2D layout deliverables Consultation on advanced BIM deliverables including project timeline simulation and owner handover Overall support throughout a project How we support with BIM

Upload: vuongtuyen

Post on 10-Apr-2018

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: IMPROVED CONSTRUCTION PLANNING WITH … CONSTRUCTION PLANNING WITH KONE BIM BIM FOR ENHANCED COLLABORATION BIM is about more than just digital 3D models. It enables more meaningful

KONE Building Information Modeling (BIM) workflows provide construction teams with relevant constructability

information and geometry related to the vertical transportation of a project. When a project integrates BIM for

vertical transportation, there is significant benefit to the communication and collaboration during a project’s

pre-construction planning phases.

IMPROVED CONSTRUCTION PLANNING WITH KONE BIM

BIM FOR ENHANCED COLLABORATION BIM is about more than just digital 3D models. It enables more meaningful collaboration amongst project stakeholders and a higher level of predictability at the construction site.

KONE provides data rich BIM content specific to a project and can contribute to advanced BIM deliverables including project timeline simulation and owner BIM handover requirements.

These models include major coordination items like building interface elements and can be placed, by KONE, in the correct position in the aggregate project model for planning and coordination purposes. This decreases the workload of the BIM coordinator and provides higher quality geometry than could be produced by a third party.

■ Project specific BIM in Revit, Industry Foundation Classes (IFC) or Navisworks (NWC) formats for either each piece of equipment or the overall project

■ Interaction with the preconstruction 3D coordination process to ensure consistency with the traditional 2D layout deliverables

■ Consultation on advanced BIM deliverables including project timeline simulation and owner handover

■ Overall support throughout a project

How we support with BIM

Page 2: IMPROVED CONSTRUCTION PLANNING WITH … CONSTRUCTION PLANNING WITH KONE BIM BIM FOR ENHANCED COLLABORATION BIM is about more than just digital 3D models. It enables more meaningful

KONEkone.us

A TAILORED APPROACH KONE’s Building Information Models are delivered in a variety of formats according to a project’s individual BIM requirements. Models can be delivered separately and placed by the construction coordinator or localized by KONE to provide a project-specific model for coordination, simulation and management.

The construction models include all key building interface elements for 3D coordination. They can also include site logistics elements to aid in pre-construction planning and facilities data integrated into a model for handover to the building owner or facility manager.

This publication is for general informational purposes only. KONE Inc. reserves the right to alter the product design and specifications without prior notice. Minor differences between printed and actual colors may exist. KONE is a registered trademark of KONE Corporation. Copyright © 2016 KONE Inc.

SF3020

Hoist beam used during installation

correctly placed

Integrated Control System (ICS)

correctly placed with cutouts

Landing door fixing points can be identified

Signalization components and

cutouts correctly placed

Components in elevator pit shown in correct

position; fixing points can be identified

Elevator electrical values and mechanical

forces included in the model

All components that have a physical interface

with the elevator shaft walls are correctly

positioned in the shaft with visible fixing points

CONSTRUCTION MODEL (LOD400) – HIGHLIGHTS(IN ADDITION TO LOD200 MODEL)