IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

Upload: buck-malone

Post on 16-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

IMPROVE Budget SummaryTony Prenni

John Vimont, Bret Schichtel, Scott CopelandOctober 16, 2014

1

10/1

6/20

14

Page 2: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

IMPROVE Operations FundingApril 1, 2014 – March 31, 2015

Funding Source AmountEPA Interagency Agreement $5,210,831EPA Modifications (additional FTIR work) $202,875USFS Contribution $144,000NPS Contribution $144,000Total $5,701,706

10/1

6/20

14

2

Page 3: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

All IMPROVE Funding

10/1

6/20

14

3

Funding Source AmountOperations (EPA, NPS, USFS) $5,701,706EPA In-Kind Support (salary/travel) $140,000NPS Optical/Scene Monitoring $506,139NPS Site Operators $195,000NPS Analysis (CIRA) $400,000NPS In-Kind Support (salary/travel) $250,000USFS Site Operators, Logistics $800,000USFS In-Kind Support (salary/travel) $50,000FWS Site Operators and In-Kind $100,000Total $8,142,845

Page 4: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

IMPROVE ExpensesFunding Source AmountUC Davis, Network Operation & Filter Analysis, 12 months

$3,095,984

DRI*, Filter Purchase and Analysis, 12 months

$1,030,562

RTI*, Filter Analysis, 12 months $414,600UC Davis, Cooperative Agreement $727,218DRI, Special Studies $25,000IMPROVE Reporting (CIRA) $108,000IMPROVE Steering Committee Meeting $14,108Program Overhead $260,542Total $5,676,014

10/1

6/20

14

4

Total Funds: $5,701,706

*DRI and RTI costs are based on the number of filters analyzed. This is an estimate.

Page 5: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

Filter Estimates

• DRI Estimate: 21,000 • DRI previous 12 months: 20,746

• RTI Estimate: 20,000• RTI previous 12 months: ~21,000

10/1

6/20

14

5

Page 6: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

Projected Funds: $5,473,831

Projected ExpensesApril 1, 2015 – March 31, 2016

Funding Source AmountUC Davis, Network Operations & Filter Analysis, 12 months (assume 3% increase)

$3,188,864

DRI, Filter Purchase and Analysis, 12 months

$1,071,815

RTI, Filter Analysis, 12 months $425,200UC Davis, Cooperative Agreement $525,343IMPROVE Reporting $108,000IMPROVE Steering Committee Meeting $15,000Program Overhead $259,292Total $5,592,513

10/1

6/20

14

6

Projected Funds: $5,473,831

Assuming static funding, NEXT YEAR SHORTFALL: $119k

Page 7: IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, 2014 1 IMPROVE Steering Committee Meeting 10/16/2014

IMPR

OVE

Ste

erin

g Co

mm

ittee

Mee

ting

What does a $119k shortfall mean for the program?

• SHUTTING DOWN ~6 sitesOR

• SHUTTING DOWN the entire network for ~2 additional weeks per year

OR• EPA money expected in March; to ensure contractors are paid

on time, contracts/task orders are offset to May/June timeframe (exact dates vary by contractor).• By funding all contractors through the 1st week of May next year

(i.e. less than 12 months), we can save:

~$120kTHIS CAN ONLY BE DONE ONCE!

There is a chance that payment will be delayed.

10/1

6/20

14

7