I-STC Vision and Mission • Vision: To be the trusted source of R&D results, defining and delivering
reliable, cost-effective systems that reduce residential energy use by 30-50%.
• Mission: To identify specific process gaps and barriers that must be addressed for Building America (BA) and its project participants to successfully:
– Develop system solutions that successfully target key stakeholder needs.
– Develop integrated quality assurance/quality control approaches that minimize risks.
– Develop a residential efficiency knowledge base that is a trusted source of information and is accessible to all key stakeholders.
-
I-STC Draft Strategic Plan Development Process
• September 2011
– Develop draft of priorities based on previous I-STC meetings and aggregate gaps from 2010 and 2011 REE Stakeholder and Technical Update meetings.
– Conduct initial prioritization activity with I-STC mailing list members.
• October 2011
– Develop draft strategic plan for REE Research Planning Meeting.
• November/December 2011
– Conduct prioritization activity based on draft strategic plan.
– Review current BA team projects and their relation to priorities.
– Finalize I-STC Strategic Plan and management process for 2012.
-
I-STC Draft Priorities
Gaps That Will Be Filled by End of CY12
-
Priorities to be Partially Addressed by BA by 2012
Steps to fill gap: conduct research on target audiences of BA program, develop metrics to track plan effectiveness
Rank Description Project Titles Lead Orgs CY
1 Outreach Plan for Building America Communications Strategic Plan PNNL, NREL, BARA 11/12
-
Priorities to be Partially Addressed by BA by 2012
Steps to fill gap: develop a clear definition of the implementation process, conduct research into industry structure and stakeholders, determine how implementation impacts each BA team
Rank Description Project Titles Lead Orgs CY
2 Implementation Process Definition With NREL/DOE
Communications Strategic Plan PNNL, NREL, BARA
12
-
Steps to fill gap: conduct peer review of CEER project, identify any stakeholders or processes not addressed, report on time/cost savings of new value stream map process
Rank Description Project Titles Lead Orgs CY
3
Value-Stream Map of the Retrofit Process
Change Management to Effect the Adoption of Cost Effective EE Upgrades CEER
11/12
Advancing Community Scale Energy Assessments & Upgrades NELC
11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: analyze projects listed, identify gaps in learning materials, develop continuous learning process
Rank Description Project Titles Lead Orgs CY
5
Continuous Learning Mechanisms for Contractors to Transition
to Energy Efficient Design/Construction
Developing the Retrofit Contractor Infrastructure BA-PIRC 11
Pilot - Beopt Usability BARA 11 Developing Energy Performance
Remodeling "Start-up" Kit NAHBRC-IP 11?
Transitioning HVAC Contractors to Home Performance Contractors IBACOS 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: develop process to identify and report failure points in implementation process
Rank Description Project Titles Lead Orgs CY
6
Documentation of Critical Failure Points in
the Process of Implementing Energy Efficiency
in Homes
Evaluation of Public/Private Delivery Systems BA-PIRC 11/12 High Performance Residential Retrofits with Affordable
Housing Initiatives BA-PIRC 11/12
Tracking and Documenting Scalability of High Performance Residential Retrofits at the Community Scale BA-PIRC 11/12
Change Management to Effect the Adoption of Cost Effective EE Upgrades CEER 11/12
Field Assessment of Advanced New Home Construction Nstar 11/12 Advancing Community Scale Energy Assessments &
Upgrades NELC 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: complete implementation process definition, identify field guide delivery methods, measure database development
Rank Description Project Titles Lead Orgs CY
7 Technical Solutions and Best Practices in
Field Guides Developed for Different Climate Zones
Integral to BA Program All Ongoing
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: analyze above efforts and other information on homeowner tendencies, create peer-reviewed staged upgrades plan for homeowners
Rank Description Project Titles Lead Orgs CY
8
Plans of Staged Energy Upgrades for Homeowners
Phased Deep Retrofits BA-PIRC 11/12
Market Characterization Project CEER 11/12
Taxonomy of Current Audit and Retrofit Delivery Systems NELC 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: identify target audiences, review projects, research project gaps
Rank Description Project Titles Lead Orgs CY
9
Market Research About Motivations, Drivers, and
Needs of Various Audiences
Evaluation of Public/Private Delivery Systems BA-PIRC 11
Change Management to Effect the Adoption of Cost Effective EE Upgrades CEER
11
Developing Energy Performance Remodeling "Start-up" Kit NAHBRC-IP
11?
Assessment of Homeowner Information, Motivation, and Skills NELC
11/12
Retrofit Energy Efficiency Implementation Challenges - Creating Demand (the benefits
and impact ) BIRA 11/12/13
Retrofit Energy Efficiency Implementation Challenges - Financing Barriers (Appraisals,
Lending, and MLS) BIRA 11/12/13
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: define training requirements for different roles, create requirements document for training/certification providers, develop materials
Rank Description Project Titles Lead Orgs CY
10
Training Requirements and Training Materials Development
Transitioning HVAC Contractors to Home Performance Contractors IBACOS 11
Evaluation of Public/Private Delivery Systems BA-PIRC 11
Developing the Retrofit Contractor Infrastructure BA-PIRC 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: develop metrics to track time from research to guideline creation, analyze process over time to identify improvement areas
Rank Description Project Titles Lead Orgs CY
11
Speed of Gathering and Delivering Research Results and Products
to Market
Publications Process NREL 11/12 Effective Communication of Energy
Efficiency Research Results BA-PIRC 11
Evaluation of Public/Private Delivery Systems BA-PIRC
11
Developing the Retrofit Contractor Infrastructure BA-PIRC
11
Tracking and Documenting Scalability of High Performance Residential Retrofits
at the Community Scale BARA 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: identify programs and specific attributes to review (Better Building, etc.), identify analysis criteria, conduct analysis, determine process to incorporate findings into BA program
Rank Description Project Titles Lead Orgs CY
12
Business Model Review of Other Retrofit Programs
Developing the Retrofit Contractor Infrastructure BA-PIRC 11
Evaluation of Public/Private Delivery Systems BA-PIRC 11
Change Management to Effect the Adoption of Cost Effective EE Upgrades CEER 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: develop mobile delivery mechanisms, format content for mobile delivery, field testing
Rank Description Project Titles Lead Orgs CY
14 Point-of-Use Training and Bar Codes with Installation Instructions Big-Box Outreach
BARA 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: review of projects listed above, evaluate contractor process pain points, develop assessment process, conduct testing and validation in field trials
Rank Description Project Titles Lead Orgs CY
15
Whole House Practices for the Assessment Process
Evaluation of Public/Private Delivery Systems BA-PIRC
11
Taxonomy of Current Audit and Retrofit Delivery Systems NELC
11?
Scalability of Self and Assisted Audits NELC 11?
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: conduct further analysis of tool target audience, develop and test tool, develop metrics to track tool effectiveness, develop process for delivery of Web-accessible content
Rank Description Project Titles Lead Orgs CY
16
Existing Content Identified, Aggregated, Indexed, and Distributed from a Central
Location
Resource Tool DOE, PNNL, BARA 11/12
Pilot - Web accessible Measure Guidelines BARA 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: analyze current solution adoption habits, develop streamlined measure packages, develop metrics to track adoption rates
Rank Description Project Titles Lead Orgs CY
18
“One Stop Shop” Energy Efficiency Solution for Homeowners
Tracking and Documenting Scalability of High Performance Residential Retrofits at the Community Scale
BA-PIRC 11/12
Information Framework for EE Upgrades CEER
11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: review projects, conduct evaluation with homeowners to determine perceptions, develop strategy to change perceptions
Rank Description Project Titles Lead Orgs CY
20
Key Disconnects Between the Heat Pump Industry and Homeowners
Perceptions of Issues, Terminology, and Metrics
Ground Source Heat Pump Evaluation in Hot Climates BA-PIRC 11/12
Optimization of Hybrid Air Source Heat Pump with Gas-Fired Forced
Air Furnace Backup BA-PIRC 11/12
Ductless Heat Pump Retrofits in Manufactured Housing BA-PIRC 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: review CEER project, conduct research to determine audience needs, develop educational materials, track material effectiveness
Rank Description Project Titles Lead Orgs CY
21
Avenues for Realtors and Appraisers to Learn about the Benefits of Energy Efficient Homes
and a Standard Method of Presenting this Information
Change Management to Effect the Adoption of Cost Effective EE
Upgrades CEER 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: identify who would typically use software, identify specific software requirements and best delivery method, create and finalize software tool
Rank Description Project Titles Lead Orgs CY
22 Software That Can Rapidly Analyze Structures in the Field
Evaluation of Audit Tool Source Energy Use Predictions Based on MASCO Home Services Audit and Utility Bill Datasets
BA-PIRC 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: identify software categories, analyze current certification methods, develop centralized certification process document
Rank Description Project Titles Lead Orgs CY
24
Certification Procedures for Energy Efficiency Software Tools
Software Inaccuracy NREL 11/12
Evaluation of Audit Tool Source Energy Use Predictions Based on MASCO Home Services Audit and
Utility Bill Datasets
BA-PIRC 11/12
Side-by-Side Labs to Evaluate Retrofit Measures All
11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: take data from projects and develop benefits documentation for audiences
Rank Description Project Titles Lead Orgs CY
25
Incremental Benefits of Implementing
Energy Saving Measures
Documents
National Measures Database NREL 11/12
Evaluation of Public/Private Delivery Systems BA-PIRC 11/12
Newporter Village – Marine Climate Deep Energy Retrofit BA-PIRC 11/12 Several BA-PIRC New Construction and Retrofit Test Home
Projects BA-PIRC 11/12
Post Occupancy Evaluation of Building America Homes BA-PIRC 11/12 Incremental Benefits of Air-Sealing and Insulating Siding
Retrofits in Existing Single-Family Homes BA-PIRC 11/12
Multi-Family Energy Retrofits - Cascade Homes BA-PIRC 11/12 Measurement of Existing Homes for Retrofitting - Calibration of
Multiple Homes CEER 11/12
Economies of Scale of Community Scale Upgrades NELC 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: analyze current research on usage rates by delivery method, develop pilot materials for various delivery methods, conduct evaluation of user experience, modify content and delivery mechanism as necessary
Rank Description Project Titles Lead Orgs CY
26
Different Delivery Mechanisms for Messaging and Delivering Information
Change Management to Effect the Adoption of Cost Effective EE
Upgrades CEER 11/12
Pilot - Web accessible Measure Guideline BARA
11/12
Pilot - This Old House Outreach; BARA 11/12 BA (non)Demonstration House BARA 11/12
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: analyze current research on consumer adoption habits, develop pilot educational and marketing materials, perform test of materials, revise materials based on feedback
Rank Description Project Titles Lead Orgs CY
27 Simple Educational and Marketing
Campaigns/Materials Aimed at Consumers
Information Framework for EE Upgrades CEER 11
Priorities to be Partially Addressed by BA by 2012
-
Steps to fill gap: NREL works with other programs to identify areas of potential collaboration, develop standards of communication documentation
Rank Description Project Titles Lead Orgs CY
28
Consistent Messaging, Standards, and Requirements Across Programs
Feasibility Study - City Outreach BARA 11
Pilot - This Old House Outreach BARA 11 BA (non)Demonstration House BARA 11/12
Effective Communication of Energy Efficiency Research Results BARA 11
Priorities to be Partially Addressed by BA by 2012
-
Rank Description Project Titles Lead Orgs CY
4 Impact Study of the Building America Program
13 Open Data Repositories to Create Energy-Use Averages
17 Field Guides as Core Documents and Constant Works in Progress
19 Guidelines for HVAC Replacement and Design in a SIP Nailbase Energy Retrofit Scenario
23 One Sticker for Builders Challenge/ENERGY STAR/HERS Ratings
29 Energy Label that Homeowners Can Readily Understand and Assign Value
Priorities Not Currently Addressed by BA
Implementation Standing Technical Committee (I-STC) �Led by the Building America Retrofit Alliance (BARA) Team I-STC Vision and MissionI-STC Draft Strategic Plan Development ProcessI-STC Draft PrioritiesPriorities to be Partially Addressed �by BA by 2012Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities to be Partially Addressed �by BA by 2012 Priorities Not Currently Addressed by BA