IMPLEMENTATION OF MALÈ DECLARATION ON CONTROL AND PREVENTION OF AIR POLLUTION AND
ITS LIKELY TRANSBOUNDARY EFFECTS FOR SOUTH ASIASITUATION IN SRI LANKA
By
R.N.R.JayaratneSenior Environmental Officer
Air, Noise, Vibration Monitoring and Male Declaration Unit Central Environmental Authority
National Stakeholders Forum – Sri Lanka – 12th June 2007
PHASE 1 WAS INITIATED WITH THE ADOPTION OF THE
IMPLEMENTATION PLAN BY THE FIRST NETWORK
MEETING HELD IN FEBRUARY 1999.
PHASE 1 WAS THE ESTABLISHMENT OF A NETWORK
ORGANIZATIONS TO IMPLEMENT THE DECLARATION
AND
COMPILATION OF BASELINE INFORMATION ON
AIR QUALITY MONITORING AND MANAGEMENT IN
THE PARTICIPATING COUNTRIES.
National Stakeholders Forum – Sri Lanka – 12th June 2007
BASELINE STUDIES PROVIDED VALUABLE INFORMATION
ON TACKLING THE TRANSBOUNDARY AIR POLLUTION IN
THE PARTICIPATING COUNTRIES AND CLEARY IDENTIFIED
THE GAPS IN THE EXISTING MONITORING SYSTEM.
ALSO THE ACTION PLANS PREPARED BY THE PARTICIPATING COUNTRIES PROVIDED THE NATIONAL PRIORITIES IN IMPLEMENTING THE MALE DECLARATION.
PHASE 1 OUTPUTS WERE REVIEWED AND ADOPTED AT THE SECOND MEETING OF NETWORK HELD IN MARCH 2000, KATHMANDU, NEPAL.
National Stakeholders Forum – Sri Lanka – 12th June 2007
Monitoring Activities Under Malé Declaration Phase II
• MoU signed- End of May, 2002MoU signed- End of May, 2002
• In-country training & Equipment Received End of June, 2003In-country training & Equipment Received End of June, 2003
• CEA started monitoring of Sulphure Dioxide, Nitrogen Dioxide at the CEA started monitoring of Sulphure Dioxide, Nitrogen Dioxide at the selected monitoring site at Dutuwewa, Galenbindunuwewa in selected monitoring site at Dutuwewa, Galenbindunuwewa in August 2003August 2003
• Wet Deposition monitoring started in the latter part of November Wet Deposition monitoring started in the latter part of November 2003. 2003.
• Sulphure Dioxide and Nitrogen Dioxide monitoring using passive Sulphure Dioxide and Nitrogen Dioxide monitoring using passive samplers is carried out monthly and wet deposition monitoring is samplers is carried out monthly and wet deposition monitoring is carried out weekly.carried out weekly.
National Stakeholders Forum – Sri Lanka – 12th June 2007
PM 10 SAMPLING
PM 10 sampling at the site is not carried out because of Non availability of a suitable power supply
National Stakeholders Forum – Sri Lanka – 12th June 2007
1
2
SOUTH- WEST (MAY-SEP)
NORTH-EAST (DEC- FEB)
SITE 1- GALENBINDUNUWEWA
Dutuwewa
SITE 2- HORTAN PLAINS
National Stakeholders Forum – Sri Lanka – 12th June 2007
Monitoring of SO2 & NO2 using Passive Sampling
National Stakeholders Forum – Sri Lanka – 12th June 2007
0
0.2
0.4
0.6
0.8
1S
ep-2
003
No
v-20
03
Jan
-200
4
Mar
-200
4
May
-200
4
Jul-
2004
Sep
-200
4
No
v-20
04
Jan
-200
5
Mar
-200
5
May
-200
5
Jul-
2005
Sep
-200
5
No
v-20
05
Jan
-200
6
Mar
-200
6
May
-200
6
Month
SO
2 C
on
cen
trat
ion
s (μ
gm
-3)
DIFFUSIVE SAMPLE RESULTS FOR SO2
National Stakeholders Forum – Sri Lanka – 12th June 2007
0
1
2
3
09-2
003
11-2
003
01-2
004
03-2
004
05-2
004
07-2
004
09-2
004
11-2
004
01-2
005
03-2
005
05-2
005
07-2
005
09-2
005
11-2
005
01-2
006
03-2
006
05-2
006
MONTH
NO
2 C
on
cen
trat
ion
s (μ
gm
-3)
DIFFUSIVE SAMPLE RESULTS FOR NO2
National Stakeholders Forum – Sri Lanka – 12th June 2007
Volume of wet Deposition
0
1000
2000
3000
4000
5000D
ec
-03
Ma
r-0
4
Ju
n-0
4
Se
p-0
4
De
c-0
4
Ma
r-0
5
Ju
n-0
5
Se
p-0
5
De
c-0
5
Ma
r-0
6
Ju
n-0
6
Se
p-0
6
De
c-0
6
Date
Vo
lum
e m
l
National Stakeholders Forum – Sri Lanka – 12th June 2007
0.0
2.0
4.0
6.0
8.0
No
v-0
3
Ju
n-0
4
De
c-0
4
Ju
l-0
5
Fe
b-0
6
Au
g-0
6
Variation of PH – wet deposition- wet only collectorVariation of PH – wet deposition- wet only collector
Date
PH
National Stakeholders Forum – Sri Lanka – 12th June 2007
0.0
2.0
4.0
6.0
8.0N
ov
-03
Ju
n-0
4
De
c-0
4
Ju
l-0
5
Fe
b-0
6
Au
g-0
6
Ma
r-0
7
Variation of PH – wet deposition- Bulk collectorVariation of PH – wet deposition- Bulk collector
PH
Date
National Stakeholders Forum – Sri Lanka – 12th June 2007
Wet Deposition Monitoring at Dutuwewa
National Stakeholders Forum – Sri Lanka – 12th June 2007
Ambient Air Quality
• Ambient Air Quality at Dutuwewa was monitored using Automated Monitoring Equipment also from 22nd July 2004 to 29th July 2004 (During the South West Monsoon)
and • from 23nd Jan. 2005 to 30th Jan. 2005
(During the North East Monsoon).
National Stakeholders Forum – Sri Lanka – 12th June 2007
Automated Air Quality Monitoring at Dutuwewa
National Stakeholders Forum – Sri Lanka – 12th June 2007
National Stakeholders Forum – Sri Lanka – 12th June 2007
Air Quality at Dutuwewa During South-West Monsoons
0.000
0.005
0.010
0.015
0.020
1 18 35 52 69 86 103 120 137 154 171
Date &time
Po
luta
nt
Co
nce
ntr
atio
ns
PP
M
O3 SW
NO SW
NOx SW
NO2 SW
SO2 SW
b
National Stakeholders Forum – Sri Lanka – 12th June 2007
Central Environmental Authority
Station: CEA MobileDutuwewa - NE monsoon
23/1/2005 to 30/1/2005
90
68
45
22
0
338
315
292
270
248
225
202
180
158
135
112
0%
10%
20%
30%
.2 to .5
.5 to 1
1 to 1.5
1.5 to 2
2 to 2.5
> 2.5
Magnitude(m/s)
0.0% calm
N
89.1% Valid Data present. National Stakeholders Forum – Sri Lanka – 12th June 2007
Air Quality at Dutuwewa During North-East Monsoons
0.000
0.005
0.010
0.015
0.020
1 18 35 52 69 86 103 120 137 154 171
Date &time
Po
luta
nt
Co
nce
ntr
atio
ns
PP
M
O3 NE
NO NE
NOx NE
NO2 NE
SO2 NE
National Stakeholders Forum – Sri Lanka – 12th June 2007
Comparison of Air Quality at Dutuwewa During Two Monsoons
0.000
0.005
0.010
0.015
0.020
Time
Po
luta
nt
Co
nce
ntr
atio
ns
PP
M
O3 SW
SO2 SW
O3 NE
SO2 NE
National Stakeholders Forum – Sri Lanka – 12th June 2007
Comparison of Air Quality at Dutuwewa During Two Monsoons
0.000
0.005
0.010
0.015
0.020
Time
Po
luta
nt
Co
nce
ntr
atio
ns
PP
M
O3 SW
SO2 SW
O3 NE
SO2 NE
National Stakeholders Forum – Sri Lanka – 12th June 2007
Acidification
Health
Informationfor the
Policy Process
Monitoringand
Modelling
Corrosion
Impacts on Crops
Malé Declaration
Impacts of Air Pollution
On going and continuing Activities for the Malé Declaration
Preparation of Preparation of emission inventoryemission inventory
National Stakeholders Forum – Sri Lanka – 12th June 2007
National Stakeholders Forum – Sri Lanka – 12th June 2007
National Stakeholders Forum – Sri Lanka – 12th June 2007
Problems Encountered;
Non durability of plastic material of the lid and the funnel holder of the wet only collector and funnel of bulk collector in Sri Lanka’s climatic condition, mainly due to hot sunshine, the material became brittle.
Need spare lids at least one for every 06 months However we have managed with a local plastic plate
National Stakeholders Forum – Sri Lanka – 12th June 2007
National Stakeholders Forum – Sri Lanka – 12th June 2007
Due to following facts, Our monitoring site Due to following facts, Our monitoring site will be shifted more suitable location as soon will be shifted more suitable location as soon as possibleas possible
Unsteady power supply at the selected siteUnsteady power supply at the selected site PM 10 Sampling cannot be donePM 10 Sampling cannot be done
Bordering conflict prevailing areaBordering conflict prevailing area Possible attack by wild elephants and Possible Possible attack by wild elephants and Possible attack by conflicting partiesattack by conflicting parties due to prevailing wardue to prevailing war situationsituation
National Stakeholders Forum – Sri Lanka – 12th June 2007
Ozone passive samplingPassive sampling at the selected second site (Horton plains)Starting of dry deposition monitoring (PM10)Corrosion study – One or more locationsAny other activity as agreed in this meeting depending on the availability of funding
National Stakeholders Forum – Sri Lanka – 12th June 2007