imagination at work. manager: amit agarwal july 21, 2014 fmp summer internship 2014 molly mcwilliams
DESCRIPTION
Standardize process Store audited data in Excel Modeling automation Reset CMR Automation Overview FMP Internship | 21 July 2014 Focus on establishing sustainable processes Background PM/Fin. (LDM) J. Steger-Parker Tech. Modeling N. Christopher Key contacts LDM IT S. Shah MWHR IT K. Davis Durability Eng. A. Tomasik IT PM A. Peterson Dedicated teams driving automation execution Inputs enable automation Data Inputs Repository Key Projects 3 Loco Status MWHR/ Mileage In service dates OH schedule Contract start/end Loco Datamart (LDM) Creates single repository for required inputs Eliminates duplication of tasks Allows for repeatable, auditable process to exist Billing Tech. Modeling Financial Modeling MWHRs Loco Database Key benefits of automation Summer projects focus areas Functional Owners Technical OwnersTRANSCRIPT
Imagination at work.
Manager: Amit AgarwalJuly 21, 2014
FMP Summer Internship 2014Molly McWilliams
2
Molly McWilliams
FMP Internship | 21 July 2014
Pennsylvania State UniversityFinance B.S., Economics B.S.Class of 2016
Penn State Women’s Water PoloTravel Team Member
Penn State Investment AssociationAnalyst, Industrial Goods Sector
HometownErie, Pennsylvania
InterestsTravel, sports, reading, watching movies
Current AssignmentGSS Risk InternSpecific Area: Risk Analytics ValidationManager: Amit Agarwal
2010 20112012
2013+Standardize process
Store audited data in Excel
Modeling automation
Reset
CMR Automation Overview
FMP Internship | 21 July 2014
Focus on establishing sustainable processes
Background
PM/Fin. (LDM)J. Steger-Parker
Tech. ModelingN. Christopher
Key contacts
LDM ITS. Shah
MWHR ITK. Davis
Durability Eng.A. Tomasik
IT PMA. Peterson
Dedicated teams driving automation execution
Inputs enable automationData
InputsRepositor
yKey
Projects
3
Loco Status
MWHR/ Mileage
In service dates
OH schedule
Contract start/end
Loco Datamart
(LDM)
• Creates single repository for required inputs
• Eliminates duplication of tasks
• Allows for repeatable, auditable process to exist
Billing
Tech. Modelin
gFinancial Modelin
g
MWHRs
Loco Databas
e
Key benefits of automation
Summer projects focus areas
Functional OwnersTechnical Owners
4
Locomotive status
FMP Internship | 21 July 2014
Loco status overview
Project objectives
• Ensure data in LDM ties to CMR audited files• Manually adjust status and contract start/end
in LDM• Work with IT team to manually adjust as
required
What is loco status?Loco status tracked daily as active or non-active to help derive loco count, an input used for billing and CMR process.Why is it important?• Enables Billing and CMR modeling
automation
Business impact Next steps
Operational activity in field
LDM Loco Datamart
eServices Data Warehouse
LDM UIMonthly
Team collects operational status data,
loads to LDM
LDM automatically updated
1
2
3 Built manual CMR loco count for 3 customersSnapshot built critical for CMR modeling project
Tested IT enhancements pre-releaseID’d bug impacting gross loco count accuracy
Validated CMR net loco count for 3 customersUpdated status of 80,640 locos in LDM
1
2
3 Eliminate need for manual report adjustmentsShare ‘lessons learned’ to fix future snapshots
Complete validation of gross loco count reportEnsure report ready to use in CMR modeling
Complete validation of 3 additional customersPrioritized based on need for future CMRs
5
Megawatt hours
FMP Internship | 21 July 2014
• Obtain CMR audited files with MWHR PIT-a)
readings• Validate & store CMR PIT readings in LDM user
interface• Reconcile accuracy of reports used as CMR
output(a-Point In Time = most recent MWHR reading)
Business impact
1
2
3
Next steps
Built single repository for 2013 PIT readingsClosed 8,850 MWHR readings for 9 customers
What is a Megawatt Hour (MWHR)?Indicator of locomotive usage, collected each time locomotive enters service shopsWhy is it important?• Indicator for future overhauls on
locos• Used for deriving overhaul schedule• Enables CMR modeling automation
LDM Loco Datamart
Data Warehous
e
MWHR Report
Operational activity in field
Update readings in MWHR UI
DE downloads SAS report for modeling
MWHR overview
Project objectives
Validated 4 LDM MWHR reports used for CMRsEnsured accuracy in report logic
Identified MWHR report logic errorsPartnered with IT to implement SAS fixes 1
2
3 Work with KTZ CMR team to validate readingsAdd KTZ 2013 PIT readings to repository
Validation of LDM reportsDocument reports and purpose for CMR team
Develop ongoing validation processIT to own executing validation prior to each CMR
6
Key takeaways
FMP Internship | 21 July 2014
Effectively communicating with management and executives
Obtaining buy-in while interacting with a cross-functional team
Developing an operational understanding of the business
Building relationships with the risk team, FMPs, and fellow interns
7
Questions?
FMP Internship | 21 July 2014