8/16/2019 IM Program Structure IM22 http://slidepdf.com/reader/full/im-program-structure-im22 1/13  Investment Program Structure- IM22 – Change Definition:- Investment program structure is created with sub-ordinate nodes (position ids) which are logical representation of Capital budgeting process and its control in the organization. All position ids should be released for enable budgeting process. Prerequisite:- Investment program posi tion and Top position id should be created before creation of IM structure. Menu Path:- Accounting  Investment Management  Program  Master Data  Inv. Program Structure  IM22 - Change Double click IM22 Maintain the following fields  Investment Program  Position id  Approval year

Upload: mayura-mulla

Post on 05-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 1/13

 

Investment Program Structure- IM22 – Change

Definition:-Investment program structure is created with sub-ordinate nodes (position

ids) which are logical representation of Capital budgeting process and its

control in the organization.

All position ids should be released for enable budgeting process.

Prerequisite:-

Investment program position and Top position id should becreated before creation of IM structure.

Menu Path:-

Accounting→ Investment Management → Program → Master Data

→ Inv. Program Structure→ IM22 - Change

Double click IM22

Maintain the following fields  Investment Program

  Position id  Approval year

Page 2: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 2/13

 

Page 3: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 3/13

 

Create top node of InvestmentProgram 

Page 4: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 4/13

 

Enter PositionID (key) and

Page 5: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 5/13

 

Page 6: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 6/13

 

Page 7: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 7/13

 

Page 8: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 8/13

 

Page 9: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 9/13

 

Page 10: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 10/13

 

Page 11: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 11/13

 

Page 12: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 12/13

 

Pl.ensure that all position id’s are released.

Finally Click on and save the structure.

Page 13: IM Program Structure IM22

8/16/2019 IM Program Structure IM22

http://slidepdf.com/reader/full/im-program-structure-im22 13/13

 

 Now Investment Program position is released and can be used for budgeting.