illawarra flame university of wollongong solar …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b...

20
Rev. Description Date Amendments TEAM UOW UNIVERSITY OF WOLLONGONG WOLLONGONG NSW, AUSTRALIA 2522 [email protected] www.illawarraflame.com.au Team Name: Address: Contact: Client: Lot Number #303 Drawn By: Checked By: Copyright: None; Project is Public Domain Date: Scale: @ A3 P.R China National Energy Adminstration Solar Decathlon China 2013 P1 Preliminary Issue 1 31.8.12 C1 Schematic Design Issue 21.9.12 C2 Schematic Design Re-Issue 30.1.13 C3 Final Submission 15.3.13 C4 As Built Issue 03.6.13 03/06/13 COVER G-000 RYAN DOBBS SCOTT REDWOOD Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR DECATHLON 2013

Upload: others

Post on 06-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

03/06/13

COVER

G-000

RYAN DOBBS

SCOTT REDWOOD

Illawarra Flame UNIVERSITY OF WOLLONGONG

SOLAR DECATHLON 2013

Page 2: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

1

A-600

1

A-600

W3.0

D03

D09

1 2 3 4 5 6 7

E

D

C

B

A

W1.0

D01

5

A-602

5

A-602

D08

2

A-600

2

A-600

3

A-601

3

A-601

12495

7475

12495

1800 1800 1800 1800 1800 1800

D07

W6.0

CPDSERVICEDUCT

4

A-601

4

A-601

W4.0W4.1

D04

D02 W1.1

E1

E1

E1 E1

E1

E1

E1

E2

E1

E2

E2

E1E2

P3

P2

P4

I4P3

P3

P3

I1

I1

195

1085

200

3995

200

1605

195

1990

590

1340

5400

6885

2000

140

1800

1800

1800

1800

1100 2680 3660 5055

455

KITCHENDECK

ENTRYDECK

SUNDECK

MAINBEDROOM

STUDY/ GUESTBEDROOM

LAUNDRY

SHWR.

KITCHEN

DINING LIVING

HALL

200

600

600

600

200

FGL

FGL

D05

W2.0

P

2080

1980 100

4050

700

700

SCREEN REFERTO DRAWINGFOR DETAIL

700

W5.0

W5.1

W5.2

W7.0

700

5615

8475

8325

7585

1100 6535 4865

6535 4410 455

2055 1230 750 1230 1390 900 85 3000 755

2215

395

1075

395

2805

1304

60

3240

100

1500

100

1745

195

1800

200

995

480

1255

4801

40 4

80

570

2680 2225 1400 225460 2605 1800

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 100

03/06/13

FLOOR PLAN

A-200

RYAN DOBBS

SCOTT REDWOOD

1 : 100

FLOOR PLAN1

NORTH

VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

Page 3: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

1 2 3 4 5 6 7

E

D

C

B

A

1800 1800 1800 1800 1800 1800

1800

1800

1800

1800

18.4°

DP

DP

DP

DP

DP

DP

5610

300

1800

680

380 1800 295 1510 780 1020 950

510

1075

4550

1575

680

1800 1800

1800 1800

ROOF RIDGE

CLERESTORY RIDGE

T1 T2 T3

R1 R2 R3

P2 P1

HT1 HT2 HT3

E1

A1 A2

P3

18.4° 18.4°

18.4°18.4° 18.4° 18.4° 18.4°

18.4° 18.4° 18.4°

1.3

1.38° 1.38°

1.3

18.4°

880 920 1070 730

2175

850 715 1085 495 1305 710

GUTTER

FLASHING

FLASHING

CAPPING

18.4° 18.4°

DP

RIDGE RL 4500

A3

18.4°

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 100

03/06/13

ROOF PLAN

A-400

RYAN DOBBS

SCOTT REDWOOD

1 : 100

ROOF PLAN1

ROOF SECTION

TRUSS 1

TRUSS 2

TRUSS 3

HALF TRUSS 1

HALF TRUSS 2

HALF TRUSS 3

RAKE ROOF 1

RAKE ROOF 2

RAKE ROOF 3

POD ROOF 1

POD ROOF 2

POD ROOF 3

AWNING ROOF 1

AWNING ROOF 2

AWNING ROOF 3

ANNOTATION

T1

T2

T3

HT1

HT2

HT3

R1

R2

R3

P1

P2

P3

A1

A2

A3

VISUAL SCALE 1:100 @ A310m2m 8m6m4m0m

NORTH

ENTRY ROOF E1

Page 4: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

GFL

0

FFL

600

U/S CEILING JOIST

3000

EDCBA

2400

600

D07

PITCH 18.4 °PITCH 18.4 °

W5.2 W5.1

W5.0

700

100

700

GUTTER

820

1280

540

1560

GFL

0

FFL

600

U/S CEILING JOIST

3000

RIDGE

4500

1 2 3 4 5 6 72400

600

W3.0W4.0W4.1

2175

300

1500

600

100

700

PITCH 1.38 °

PITCH 1.38 °

W2.0

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 50

03/06/13

BUILDINGELEVATIONS

A-501

RYAN DOBBS

SCOTT REDWOOD

1 : 50

WEST4

1 : 50

SOUTH3

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

LEGEND

D0#

W#

DOOR REFERENCE TAG

WINDOW REFERENCE TAG

Page 5: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

GFL

0

FFL

600

U/S CEILING JOIST

3000

EDCBA

2400

600

D07

PITCH 18.4 °PITCH 18.4 °

W5.2 W5.1

W5.0

700

100

700

GUTTER

820

1280

540

1560

GFL

0

FFL

600

U/S CEILING JOIST

3000

RIDGE

4500

1 2 3 4 5 6 72400

600

W3.0W4.0W4.1

2175

300

1500

600

100

700

PITCH 1.38 °

PITCH 1.38 °

W2.0

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 50

03/06/13

BUILDINGELEVATIONS

A-501

RYAN DOBBS

SCOTT REDWOOD

1 : 50

WEST4

1 : 50

SOUTH3

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

LEGEND

D0#

W#

DOOR REFERENCE TAG

WINDOW REFERENCE TAG

Page 6: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

CUPBOARD

A-504

A-504

B

A-504

J

A C

F

G

DH

I

E

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

As indicated

03/06/13

INTERIORELEVATION

A-504

RYAN DOBBS

SCOTT REDWOOD

KITCHEN

LIVINGDINING

HALL

PLAN1:100

KITCHEN A KITCHEN B

KITCHEN E LIVING C LIVING D DINING E

DINING G HALL H HALL J

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

�����

HALL I

DINING F

R.C LEVEL

F.F LEVEL

F.F LEVEL

R.C LEVEL

F.F LEVEL

R.C LEVEL

3051

700

3051

700

3501

700

Page 7: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

A-505 BF

A

CA-505D

E

FFL

600

2400

3051

700

R.C LEVEL

351

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

As indicated

03/06/13

INTERIORELEVATION

A-505

RYAN DOBBS

SCOTT REDWOOD

NORTH INTERNAL A WEST INTERNAL B

SOUTHINTERNAL C

POD EASTINTERNAL D

POD NORTH INTERNAL E

EASTINTERNAL F

PLAN 1:100

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

STUDY/ GUEST BEDROOM

POD

�����

F.F LEVEL

R.C LEVEL

3051

700

2400

.351

Page 8: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

A-506 1

F

-

BMAIN BEDROOM

POD

A-506E

-

2400

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

As indicated

03/06/13

INTERIORELEVATION

A-506

RYAN DOBBS

SCOTT REDWOOD

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

PLAN 1:100

WEST INTERNAL A SOUTH INTERNAL B

EAST INTERNAL C

POD SOUTH D

POD EAST E NORTH INTERNAL F

MAIN BEDROOM INTERNAL ELEVATIONS

�����

F.F LEVEL

R.C LEVEL

3051

700

F.F LEVEL

R.C LEVEL

3051

700

ACD

351

Page 9: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

A-507 D

A-507 G

F

E

-

C

B

A

FFL

600

POD CEILING

2905

2305

851

700

151

DRYER

WASHINGMACHINE

FFL

600

POD CEILING

2905

2305

851

700

2151

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

As indicated

03/06/13

INTERIORELEVATION

A-507

RYAN DOBBS

SCOTT REDWOOD

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

PLAN 1:100

SOUTH LAUNDRY A WEST LAUNDRY B NORTH LAUNDRY C EAST LAUNDRY D

SHOWER EAST E SHOWER NORTH F SHOWER WEST G SHOWER SOUTH H

POD INTERNAL ELEVATIONS

�����

H

WC

Page 10: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

GFL

0

FFL

600

E D C B A

600

STUDY/GUESTBEDROOM

MAIN BEDROOM

3A-610

2

A-669

1

A-610

2A-610

700

3100

U/S CEILING JOIST

600

2485

2400

700

820

1280

GFL

0

FFL

600

E D C B A

BATH.CPDHALLDINING

7

A-613

POD CEILING

2905

SCREENING

700

2851

3100

U/S CEILING JOIST

2485

600

400

700

4A-655

3

A-655

THERMAL WALLTERRACOTTA CONCRETE

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 50

03/06/13

SECTIONS

A-600

RYAN DOBBS

SCOTT REDWOOD

1 : 50

SECTION 11

1 : 50

SECTION 22

VISUAL SCALE 1:50 @ A35m1m 4m3m2m0m

Page 11: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

50mm THERMAXINSULATION

35x70mm TIMBERBATTEN @ 600CTS

COLORBOND MINI ORBSHEETING

90mm SHS

145mm KNAUFEARTHWOOLINSULATION

100mm SHS

90x45mm TIMBERSTUDS @ 600CTS

90mm KNAUFEARTHWOOL INSULATION

10mmPLASTERBOARD

PROCTORWRAP ATMEMBRANE

40x15mm RECYCLEDAUSTRALIAN HARDWOOD

19x85mm CYPRESSTIMBER FLOORING

GFL

0

FFL

600

50mm THERMAXINSULATION

35x70mm TIMBERBATTEN

12mmSHADOWCLAD

90mm SHS

50mm THERMAXINSULATION

145mm KNAUFEARTHWOOLINSULATION

100mm SHS

90x45mm STUDFRAME @ 600CTS.

90mm KNAUFEARTHWOOLINSULATION

PROCTORWRAP ATMEMBRANE

10mmPLASTERBOARD

100mm SHS

700

19x80mm CYPRESSTIMBER FLOORING

40x15mm RECYCLEDAUSTRALIAN HARDWOOD

16mm H3 PLYWOOD

35x230mmPRE-PRIMED TIMBERBARGE BOARD

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 5

03/06/13

BUILDINGDETAILS

A-650

RYAN DOBBS

SCOTT REDWOOD

1 : 5A-650

FLOOR DETAIL 22

1 : 5A-650

FLOOR DETAIL 11

VISUAL SCALE 1:5 @ A30.5m0.1m 0.4m0.3m0.2m0m

00 02

Page 12: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

10mm WEATHERTEXSOFFIT LINING

90mm SHS

90x45mm TOP PLATE

10mm PLASTERBOARD

12mm SHADOWCLAD

CUSTOM STEEL FLASHING

140x45mm PURLINS

STEEL TRUSS TO ENGINEER'S SPECIFICATION WITH CLEATS SPACED TO PURLINS

50mm THERMAX INSULATION

PROCTORWRAP HTMEMBRANE

90x45mm STUD FRAME @ 600 CTS

70x30mm CEILING JOIST

TECHSCREW FIXING

COLORBOND TRIMDEK ROOF SHEETING

19x19mm PRE-PRIMEDTIMBER BEAD

PROCTORWRAP ATMEMBRANE

90mm KNAUFEARTHWOOL INSULATION

16mm FURRING CHANNEL

13mm TUFF-R INSULATION230x20mm PRE-PRIMED

TIMBER FACIA

U/S CEILING JOIST

3100

NUT WELDED TO U/S OF 90mm SHS

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 5

03/06/13

ROOF DETAIL 6

A-670

NA,RD

SCOTT REDWOOD

1 : 5

ROOF DETAIL 61

VISUAL SCALE 1:5 @ A30.5m0.1m 0.4m0.3m0.2m0m

A-610

Page 13: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

INTERNALEXTERNAL

35x70mm TIMBER BATTEN

50mm THERMAX INSULATION

12mm SHADOWCLAD

SCREW ATTACHMENT

90mm KNAUF EARTHWOOLINSULATION

90x45mm TIMBER STUD FRAME

90mm SHS

PROCTOR A.T. WRAPMEMBRANE

'J' PBMOULD

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 5

03/06/13

WALL TYPE

A-701

PETER WILSON

SCOTT REDWOOD 1 : 5

E1 EXTERNAL CORNER1201

VISUAL SCALE 1:5 @ A30.5m0.1m 0.4m0.3m0.2m0m

Page 14: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

MAIN BEDROOM

EXTERNAL

50mm THERMAX INSULATION

12mm SHADOWCLAD

90mm KNAUF EARTHWOOLINSULATION

90mm SHS

FINISH CORNER

SAW CUT LINE

10 mm PLASTERBOARD

90x45mm TIMBER STUD FRAME

SARKING

COLORBOND CUSTOM MINI ORB CLAD SHEETING

Rev. Description Date

Amendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA 2522

[email protected]

Team Name:

Address:

Contact:

Client:

Lot Number #303

Drawn By:

Checked By:

Copyright:None; Project is Public Domain

Date:

Scale: @ A3

P.R China National Energy Adminstration

Solar Decathlon China 2013

P1 Preliminary Issue 1 31.8.12

C1 Schematic Design Issue 21.9.12

C2 Schematic Design Re-Issue 30.1.13

C3 Final Submission 15.3.13

C4 As Built Issue 03.6.13

1 : 5

03/06/13

WALL TYPE

A-702

PETER WILSON

SCOTT REDWOOD

1 : 5

E2 TO E3 EXTERNAL CORNER2A-201

VISUAL SCALE 1:5 @ A30.5m0.1m 0.4m0.3m0.2m0m

Page 15: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

SOLAR DECATHLONSTRUCTURAL DISCIPLINE

STRUCTURAL MEMBER SCHEDULEMARK SIZE COMMENTS

PAD FOOTINGPF1 400 x 400 x 100 DEEP

STEEL FLOOR COLUMNSC1 100 x 100 x 3 SHS

FLOOR BEAMFB1 100 x 100 x 3 SHS

WALL BEAMWB1 89 x 89 x 3.5 SHS

WALL COLUMNWC1 89 x 89 x 3.5 SHSWC2 50 x 50 x 3 SHS

FLOOR JOISTSFJ1 150 x 45FJ2 95 x 63 HYSPAN

POD FRAMEF1 100 x 50 x 2.5 RHSF2 100 x 75 x 3.0 RHS

POD COLUMNF1C1 100 x 50 x 2.5 RHSF1C2 100 x 75 x 3 RHSF1C3 50 x 50 x 3 SHS

TRUSSBOTTOM CHORD 75 x 50 x 2.5 RHS

DIAGONAL 50 x 50 x 2.5 SHSTOP CHORD 75 x 50 x 2.5 RHS

TT1 75 x 50 x 2.5 RHS TRUSS TIE BEAMTT2 100 x 100 x 8 EA TRUSS TIE BEAMTV1 75 x 50 x 2.5 RHS TRUSS VERTICALTV2 50 x 50 x 2.5 SHS TRUSS VERTICAL

ROOF BEAMRB1 150 x 100 x 4 RHSRB2 150 x 100 x 4 RHSRB3 125 x 75 x 3 RHS

Rev. Description DateAmendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA [email protected]

www.illawarraflame.com.au

Team Name:Address:

Contact:

Client:

Lot Number #303Drawn By:Checked By:Copyright:None; Project is Public DomainDate:Scale: @ A3

National Energy Adminstrationof China (NEA)

1

1 SUBMISSION FOR 80% 21/9/12

21/9/12

STRUCTURALCOVER SHEET

S-000

B.GIBSONSCOTT REDWOOD

STRUCTURAL DRAWING LISTS-000 COVER SHEETS-100 FLOOR 3D MODELS-101 POD FRAMING 3D MODELS-102 WALL FRAMING 3D MODELS-103 WALL & ROOD 3D MODELS-104 ROOF FRAME 3D MODELS-200 FLOOR PLANS-300 WALL FRAMING PLANS-400 ROOF FRAMING PLANS-500 NORTH ELEVATIONS-501 SOUTH ELEVATIONS-502 EAST ELEVATIONS-503 WEST ELEVATIONS-600 FLOOR DETAILS - SHEET 1S-601 FLOOR DETAILS - SHEET 2S-602 FLOOR DETAILS - SHEET 3S-603 FLOOR DETAILS - SHEET 4S-700 ROOF DETAILS - SHEET 1S-701 ROOF DETAILS - SHEET 2S-702 ROOF DETAILS - SHEET 3S-703 ROOF DETAILS - SHEET 4S-704 ROOF DETAILS - SHEET 5

Page 16: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

Rev. Description DateAmendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA [email protected]

www.illawarraflame.com.au

Team Name:Address:

Contact:

Client:

Lot Number #303Drawn By:Checked By:Copyright:None; Project is Public DomainDate:Scale: @ A3

National Energy Adminstrationof China (NEA)

1

1 SUBMISSION FOR 80% 21/9/12

21/9/12

STRUCTURALFLOOR 3DMODEL

S-100

B.GIBSON.

Page 17: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

Rev. Description DateAmendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA [email protected]

www.illawarraflame.com.au

Team Name:Address:

Contact:

Client:

Lot Number #303Drawn By:Checked By:Copyright:None; Project is Public DomainDate:Scale: @ A3

National Energy Adminstrationof China (NEA)

1

1 SUBMISSION FOR 80% 21/9/12

21/9/12

STRUCTURALPOD FRAMING 3DMODEL

S-101

B.GIBSONSCOTT REDWOOD

Page 18: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

Rev. Description DateAmendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA [email protected]

www.illawarraflame.com.au

Team Name:Address:

Contact:

Client:

Lot Number #303Drawn By:Checked By:Copyright:None; Project is Public DomainDate:Scale: @ A3

National Energy Adminstrationof China (NEA)

1

1 SUBMISSION FOR 80% 21/9/12

21/9/12

STRUCTURALWALL FRAME 3DMODEL

S-102

B.GIBSONSCOTT REDWOOD

Page 19: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

Rev. Description DateAmendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA [email protected]

www.illawarraflame.com.au

Team Name:Address:

Contact:

Client:

Lot Number #303Drawn By:Checked By:Copyright:None; Project is Public DomainDate:Scale: @ A3

National Energy Adminstrationof China (NEA)

1

1 SUBMISSION FOR 80% 21/9/12

21/9/12

STRUCTURALWALL & ROOF 3DMODEL

S-103

B.GIBSONSCOTT REDWOOD

Page 20: Illawarra Flame UNIVERSITY OF WOLLONGONG SOLAR …1 a-600 1 a-600 w3.0 d03 d09 1 2 3 4 5 6 7 e d c b a w1.0 d01 5 a-602 5 a-602 d08 2 a-600 2 a-600 3 a-601 3 a-601 12495 7475 12495

Rev. Description DateAmendments

TEAM UOW

UNIVERSITY OF WOLLONGONGWOLLONGONG

NSW, AUSTRALIA [email protected]

www.illawarraflame.com.au

Team Name:Address:

Contact:

Client:

Lot Number #303Drawn By:Checked By:Copyright:None; Project is Public DomainDate:Scale: @ A3

National Energy Adminstrationof China (NEA)

1

1 SUBMISSION FOR 80% 21/9/12

21/9/12

STRUCTURALROOF FRAME3D MODEL

S-104

B.GIBSONSCOTT REDWOOD