11ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
• Present statusPresent status
• Work in progressWork in progress
JRA1. LBT-DUSLJRA1. LBT-DUSLLow background techniques for deep Low background techniques for deep underground sciencesunderground sciences
22ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP 1.WP 1.
Key objectivesKey objectives
To measure the environmental background components (neutrons, gammas, muons, Rn contamination in the air and in the water ...) in the four underground sites in a coherent and coordinated way. The joint research effort should optimise the know-how of the different participants.
This is extremely important for the interpretation of data and for planning future experiments.
33ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP 2.WP 2.
Key objectivesKey objectives
To produce a reliable Monte Carlo library of simulation codes to identify and quantify the backgrounds in the EU underground sites in a variety of experimental conditions for the interpretation of data and for planning future experiments.
The joint research effort should optimise the know-how of the different participants.
Experimental results from Task 1 will be useful as the input of the simulations.
44ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP 3.WP 3.
Key objectivesKey objectives
-Construction and upgrading of ultra low background facilities (ULBF) in the four underground labs forming an EU-coordinated service for applications in rare event physics and other fields of world-wide value.
-Implementation of new techniques to deal with the background: active and passive shielding, veto systems, particle discrimination techniques, fragmentation of calorimeter detectors, control and suppression of radon levels...
-Study of the feasibility of fabrication of detectors and materials underground.
55ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP 4.WP 4.
Key objectivesKey objectives
-Collect new (and old) data on radioactive contamination and cosmogenic activation of materials used in rare-event physics experiments and ultra-low background instrumentation, using the new capabilities offered by the R&D and facilities of WP 3.
-Development and test of purification techniques to improve the radio-purity of materials.
66ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
ManagementManagement structure of JRA1 structure of JRA1
Activity coordinatorActivity coordinatorJulio Morales/José M. Carmona (LSC)Julio Morales/José M. Carmona (LSC)Deputy coordinatorDeputy coordinator Nicola Ferrari (LNGS)Nicola Ferrari (LNGS)
WP1. Background measurements in the deep underground sites:WP1. Background measurements in the deep underground sites:CoordinatorCoordinator Nicola Ferrari (LNGS)Nicola Ferrari (LNGS)Deputy coordinatorsDeputy coordinators Marisa Sarsa/Gloria Luzón (LSC)Marisa Sarsa/Gloria Luzón (LSC)
WP2. Background simulations:WP2. Background simulations:CoordinatorCoordinator Gloria Luzón/Susana Cebrián (LSC)Gloria Luzón/Susana Cebrián (LSC)Deputy coordinatorDeputy coordinator Vitaly Kudriavtsev (IUS)Vitaly Kudriavtsev (IUS)
WP3. Low background facilities: WP3. Low background facilities: CoordinatorCoordinator Matthias Laubenstein (LNGS)Matthias Laubenstein (LNGS)Deputy coordinatorDeputy coordinator Jean Louis Reyss (LSM)Jean Louis Reyss (LSM)
WP4 . Radiopurity of the materials:WP4 . Radiopurity of the materials:Coordinator:Coordinator: Pia Loaiza (LSM)Pia Loaiza (LSM)Deputy coordinator:Deputy coordinator: Lino Miramonti (LNGS)Lino Miramonti (LNGS)
77ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
ParticipantsParticipantsWP LNGS LSM LSC Boulby
WP1- Background measurements and monitoring in the deep underground sites
N. FerrariA. IanniC. BrogginiC. CattadoriW. PlastinoC. VignoliG.L. RaselliA. Cesana J. Kisiel
G. GerbierD. Lalanne
G. Luzon J.M. CarmonaJ. MoralesM.L. SarsaA. OrtizJ. Ruz
V. KudryavtsevJ. McMillanJ. LewinB. CamanziE. Tziaferi
WP2- Background simulations
L. PandolaS. Parlati
P. Loaiza G. GerbierM. De JesusF. Piquemal
S. CebriánG. Luzon J.M. CarmonaM. MartinezB. Beltran
V. KudryavtsevJ. DaviesB. CamanziC. Bungau
WP3- Low background facilities
M. LaubensteinN. FerrariC. TomeiM. BalataS. Shoenert H. Simgen
J.L. ReyssPh. HubertD. Lalanne
J.A. VillarJ. AmareM.L. SarsaJ.M. CarmonaM. MartinezJ. Ruz
S. PalingR. LuscherN. SmithC. BungauJ. McMillan
WP4- Radiopurity of the materials
L. Miramonti A. IanniB. CaccianigaM. Laubenstein C. TomeiJ. Kisiel
P. LoaizaC. GoldbachP. HubertR GurriaranC. Marquet
J. PuimedonM.L. SarsaJ.M. CarmonaL. Torres
S. PalingJ. McMillanJ. LewinB. Camanzi
88ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
First JRA1 General MeetingFirst JRA1 General Meeting
Held in Held in September 10September 10, in Edinburgh, in Edinburgh
Participants:Participants: LNGSLNGS Nicola Ferrari, Claudia Tomei, Lino Miramonti, Nicola Ferrari, Claudia Tomei, Lino Miramonti,
Matthias LaubensteinMatthias Laubenstein IUSIUS Neil Spooner, Vitaly Kudryavtsev, Alex MurphyNeil Spooner, Vitaly Kudryavtsev, Alex Murphy LSMLSM Gilles Gerbier, Pia LoaizaGilles Gerbier, Pia Loaiza LSCLSC Julio Morales, José Manuel Carmona, Gloria Luzón, Julio Morales, José Manuel Carmona, Gloria Luzón,
Susana Cebrián, María Martínez, Lidia Torres,Susana Cebrián, María Martínez, Lidia Torres,Igor G. IrastorzaIgor G. Irastorza
ReviewReview of JRA1 goals of JRA1 goals
WP WP presentationspresentations by coordinators of the activities by coordinators of the activities Set-up of the working groupsSet-up of the working groups Review of present status of the JRA1 activitiesReview of present status of the JRA1 activities Review of the goals for each WPReview of the goals for each WP Proposed actionsProposed actions
99ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
JRA1: status of the activityJRA1: status of the activity
The official web page of the JRA1 activity has been The official web page of the JRA1 activity has been set-up. It contains:set-up. It contains:
A description of the JRA1 activity and general documentsA description of the JRA1 activity and general documents JRA1 list of participantsJRA1 list of participants Information on next and previous meetingsInformation on next and previous meetings Working group pagesWorking group pages: participants, documents, evolution : participants, documents, evolution
of the activities…of the activities…
http://www.unizar.es/iliashttp://www.unizar.es/ilias
1010ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
1111ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
1212ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
1313ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP´s activitiesWP´s activities
1414ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP1 activitiesWP1 activities((Background measurements in the deep Background measurements in the deep
underground sites)underground sites) Completed & undergoing activitiesCompleted & undergoing activities
• Collecting existing data from each laboratory onCollecting existing data from each laboratory on
neutron background, environmental gammas, radio neutron background, environmental gammas, radio purity of rock, concrete, etc…, radon monitoring (in air, water, …), purity of rock, concrete, etc…, radon monitoring (in air, water, …), muon fluxesmuon fluxes
• Reports on these measurements are being collected by WP1 Reports on these measurements are being collected by WP1 coordinatorcoordinator
• Prepare contents for WP1 web page to be located on the main web Prepare contents for WP1 web page to be located on the main web page of JRA1 at LSCpage of JRA1 at LSC
• Survey of environmental gamma-ray background (all labs; Survey of environmental gamma-ray background (all labs; undergoing at LNGS, and undergoing at LNGS, and Boulby with TARI project)Boulby with TARI project)
• Measurement of radiopurity of rock, concrete, etc... (all labs; Measurement of radiopurity of rock, concrete, etc... (all labs; undergoing at LNGS, LSC, ---)undergoing at LNGS, LSC, ---)
1515ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP1 activitiesWP1 activities((Background measurements in the deep Background measurements in the deep
underground sites)underground sites)
Neutron monitoring at the underground laboratoriesNeutron monitoring at the underground laboratories
• At LNGS a new measurement will be started by a Pavia INFN group in At LNGS a new measurement will be started by a Pavia INFN group in the next monthsthe next months
• A group from Baksan is interested to start a collaboration with ILIAS A group from Baksan is interested to start a collaboration with ILIAS for the measurement of neutron backgrounds with 3He liquid scintillator for the measurement of neutron backgrounds with 3He liquid scintillator detectordetector
• The same measurements will follows for other labs (TARI)The same measurements will follows for other labs (TARI)
• Collecting existing data from each laboratory onCollecting existing data from each laboratory on
neutron background, environmental gammas, radio neutron background, environmental gammas, radio purity of rock, concrete, etc…, radon monitoring (in air, water, …), purity of rock, concrete, etc…, radon monitoring (in air, water, …), muon fluxesmuon fluxes
• Rn monitoring in the air and water (ongoing since a few years at Rn monitoring in the air and water (ongoing since a few years at LNGS; soon at LSM, LSC, IUS)LNGS; soon at LSM, LSC, IUS)
1616ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP2 activitiesWP2 activities((Background simulations)Background simulations)
Completed & undergoing activitiesCompleted & undergoing activities
• At IDM04 a At IDM04 a joint meetingjoint meeting of of N3N3 BSNS and BSNS and JRA1JRA1 WP2 activities was WP2 activities was held, and work by every group presented and discussedheld, and work by every group presented and discussed
• A A mailing distribution listmailing distribution list has been created to optimize exchange of has been created to optimize exchange of ideas (info: ideas (info: http://webmail.unizar.es/mailman/listinfo/montecarlohttp://webmail.unizar.es/mailman/listinfo/montecarlo))
• An An FTP repositoryFTP repository for codes with (restricted) access through main for codes with (restricted) access through main JRA1 web page has been created (info: JRA1 web page has been created (info: [email protected]@unizar.es))
•Groups have been asked by WP coordinators to elaborate a Groups have been asked by WP coordinators to elaborate a reportreport on on the simulation codes they are using (comments, …)the simulation codes they are using (comments, …)
Next projectsNext projects
• Comparison of codes; problems, bug and open questions detectedComparison of codes; problems, bug and open questions detected
• Preparation of a first set of Monte Carlo libraries for background Preparation of a first set of Monte Carlo libraries for background simulationssimulations
• Design of strategies to compare results with experimental dataDesign of strategies to compare results with experimental data
1717ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
WP3 activitiesWP3 activities((Low background facilities)Low background facilities)
Completed & undergoing activitiesCompleted & undergoing activities
• LNGS operates very low background Ge detectors developed by a LNGS operates very low background Ge detectors developed by a collaboration between MPI and Canberracollaboration between MPI and Canberra
• A facility for electroforming copper at LSC is under developmentA facility for electroforming copper at LSC is under development
• Reports on low background facilities at each underground laboratory Reports on low background facilities at each underground laboratory are in preparationare in preparation
• The laboratory for low-level radioactivity measurements at LNGS was The laboratory for low-level radioactivity measurements at LNGS was presented by M. Laubenstein (see JRA1 web page)presented by M. Laubenstein (see JRA1 web page)
Next projectsNext projects
•To initiate the development of ultra-low background detectors, with the To initiate the development of ultra-low background detectors, with the establishment of a prototype for the growth of detector crystalsestablishment of a prototype for the growth of detector crystals
• A program of A program of cross calibrationcross calibration of the Ge detectors in the different labs of the Ge detectors in the different labs is under consideration through an exchange of reference materials. The is under consideration through an exchange of reference materials. The consistency of data on radioactive contamination obtained by the consistency of data on radioactive contamination obtained by the different labs will then be checked.different labs will then be checked.
1818ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
Completed & undergoing activitiesCompleted & undergoing activities
• A web page (A web page (http://www-lsm.in2p3.fr/ilias/ilias.htmlhttp://www-lsm.in2p3.fr/ilias/ilias.html) has been set-up to ) has been set-up to contain a data base on radio-purity of materials. It will be linked to the JRA1 contain a data base on radio-purity of materials. It will be linked to the JRA1 main site.main site.
• Coordinators from each lab will collect data from measured materialsCoordinators from each lab will collect data from measured materials
0.001 0.001 ± ± 0.0000.00099
0.03 0.03 ± ± 0.010.01
<0.2<0.2<0.3<0.3<0.12<0.12< 0.3< 0.3VA VA 00105001056363
OFHCOFHCCooperCooper
5454MnMn5757CoCo6060CoCo4040KK137137CsCs210210PbPb235235UU208208TlTl212212PbPb228228AcAc214214BiBi214214PbPb234234Th Th
232232Th seriesTh series 238238U seriesU series
Radionuclide concentration in dpm/kg Radionuclide concentration in dpm/kg
ProvideProviderr
and and RefRef
TypeTypeMateriMaterialal
Mea
sure
d by
ED
EL
WE
ISS
Typ
e of
de
tect
or
Ge,
typ
e n
, 2
00
cc
@ L
SM
WP4 activitiesWP4 activities((Radio-purity of the materials)Radio-purity of the materials)
1919ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
JRA1- LBT-DUS: Low Background Techniques for Deep Underground Science
Total Duration : 48 months quantities are in K€
#1&2 #3 #4 #5LSM LNGS LSC IUS All Labs
Travel & subs Task 1 9 32 5 7 53Travel & subs Task 2 5 8 9 4 26Travel & subs Task 3 3 5 3 3 14Travel & subs Task 4 3 5 3 3 14Consumables for Task 1, Task 3, and Task 4 0 0 0 0 0New Equipment for Task 1 15 10 12 10 47Upgrade computing infrastructures Task 2 10 10 6 5 31Install/upgrade ULBF task 3 - Durable equipement 135 150 132 25 442Install/upgrade ULBF task 3 - Prototypes 0 0 0 15 15Post doc fellowship for Task 1 0 120 0 0 120Post doc fellowship for Task 2 0 0 120 0 120Post doc fellowship for Task 3 0 80 0 0 80Post doc fellowships for Task 4 120 0 0 120 240Technical support Task 1, Task2 and Task 4 0 0 0 0 0Technical support Task 3 0 0 62 0 62JRA1 EB meetings 5 6 6 4 21General LBT-DUS meetings 12 27 12 12 63
TOTAL 317 453 370 208 1348Overheads (mainly administration) 28 90 73 41 232
Total costs 345 543 443 249 1580
2020ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
JRA1- LBT-DUS: Low Background Techniques for Deep Underground Science
BUDGET by LAB and year
LSM LNGS LSC IUS1 2 3 4 Tot 1 2 3 4 Tot 1 2 3 4 Tot 1 2 3 4 Tot
Travel & subs Task 1 2,0 3,5 3,5 0,0 9,0 6,0 12,0 12,0 2,0 32,0 1,0 2,0 2,0 0,0 5,0 2,0 2,5 2,5 0,0 7,0Travel & subs Task 2 1,0 2,0 2,0 0,0 5,0 2,0 3,0 3,0 0,0 8,0 2,0 3,5 3,5 0,0 9,0 1,0 1,5 1,5 0,0 4,0Travel & subs Task 3 1,0 1,0 1,0 0,0 3,0 1,0 2,0 2,0 0,0 5,0 1,0 1,0 1,0 0,0 3,0 1,0 1,0 1,0 0,0 3,0Travel & subs Task 4 1,0 1,0 1,0 0,0 3,0 1,0 2,0 2,0 0,0 5,0 1,0 1,0 1,0 0,0 3,0 1,0 1,0 1,0 0,0 3,0Consumables for Task 1, Task 3, and Task 4 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0New Equipment for Task 1 10,0 5,0 0,0 0,0 15,0 5,0 5,0 0,0 0,0 10,0 6,0 6,0 0,0 0,0 12,0 5,0 5,0 0,0 0,0 10,0Upgrade computing infrastructures Task 2 5,0 5,0 0,0 0,0 10,0 5,0 5,0 0,0 0,0 10,0 3,0 3,0 0,0 0,0 6,0 5,0 0,0 0,0 0,0 5,0Install/upgrade ULBF task 3 - Durable equipement 50,0 50,0 35,0 0,0 135,0 50,0 50,0 50,0 0,0 150,0 50,0 50,0 32,0 0,0 132,0 7,5 7,5 10,0 0,0 25,0Install/upgrade ULBF task 3 - Prototypes 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 7,5 7,5 0,0 0,0 15,0Post doc fellowship for Task 1 0,0 0,0 0,0 0,0 0,0 20,0 40,0 40,0 20,0 120,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0Post doc fellowship for Task 2 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 20,0 40,0 40,0 20,0 120,0 0,0 0,0 0,0 0,0 0,0Post doc fellowship for Task 3 0,0 0,0 0,0 0,0 0,0 0,0 40,0 40,0 0,0 80,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0Post doc fellowships for Task 4 20,0 40,0 40,0 20,0 120,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 20,0 40,0 40,0 20,0 120,0Technical support Task 1, Task2 and Task 4 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 30,0 32,0 0,0 0,0 62,0 0,0 0,0 0,0 0,0 0,0Technical support Task 3 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0 0,0JRA1 EB meetings 1,5 1,5 1,0 1,0 5,0 2,0 2,0 1,0 1,0 6,0 2,0 2,0 1,0 1,0 6,0 1,0 1,0 1,0 1,0 4,0General LBT-DUS meetings 4,0 4,0 4,0 0,0 12,0 9,0 9,0 9,0 0,0 27,0 4,0 4,0 4,0 0,0 12,0 4,0 4,0 4,0 0,0 12,0
TOTAL 95,5 113,0 87,5 21,0 317,0 102,0 172,0 162,0 27,0 453,0 120,0 144,5 84,5 21,0 370,0 56,0 73,0 64,0 25,0 208,0Overheads (mainly administration) 8,0 9,5 8,5 2,0 28,0 20,0 34,0 31,5 4,5 90,0 24,0 28,5 16,5 4,0 73,0 11,0 14,0 12,0 4,0 41,0
Total costs 103,5 122,5 96,0 23,0 345,0 122,0 206,0 193,5 31,5 543,0 144,0 173,0 101,0 25,0 443,0 67,0 87,0 76,0 29,0 249,0
2121ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
Expected cost before Apr 2005Expected cost before Apr 2005
INFN used money (Sept-04)INFN used money (Sept-04)INFN Budget Used Available Travels 21000 1000 20000 Equipment, consummables and prototypes 60000 12000 48000 Total 81000 13000 68000
Travels Topical workshops on separate WP Background measurements at LNGS
5000 10000
Equipment, consummables and prototypes
Large Crystal for gamma ray background monitoring (Costs for installation of “Baksan” neutron detector at LNGS) Electronics and consummables for n and gamma ray detectors System for 3H enrichment Multiparametric DAQ for Ge/NaI
25000 (15000)
4000 15000 9000
Total 68000 Personnel 3 years post doc position C. Tomei (expected start Nov-04) 15000
2222ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
LSC Budget Used Available Travels 11,000 3,400 7,600 Equipment, consummables and prototypes 59,000 0 59,000 Total 70,000 66,600 Personnel 50,000 0 50,000
Travels Topical workshops on separate WP Background measurements at LNGS (participation)
4,000 3,000
Equipment, consummables and prototypes
Upgrade computing facilities for Task 2 Complete ULBF at LSC (2 HpGe + 1 NaI + ACQ sys + shield)
6,000 54,000
Total 67,000 Personnel 1st. year post doc position (expected start Jan-Mar 05) 40,000 1st. year post tech. support (expected start Jan-Mar 05)? 30,000 Total 70,000
Expected cost before Apr 2005Expected cost before Apr 2005
LSC used money (Sept-04)LSC used money (Sept-04)
2323ILIAS 3 EB meeting. Paris. October 2004 ILIAS 3 EB meeting. Paris. October 2004 JRA1 web pageJRA1 web page http://www.unizar.es/iliashttp://www.unizar.es/ilias
LSM expected cost before Apr 2005LSM expected cost before Apr 2005
Total available CEA+CNRS : Total available CEA+CNRS : 129 k€129 k€Projected expenses : Projected expenses : 129 k€129 k€
•post doc post doc 30 k€ 30 k€
•support for one techsupport for one tech 11 k€ 11 k€
•equipment to buy :equipment to buy : anti-radon system (can be done asap if anti-radon system (can be done asap if OK)OK) 42 k€ 42 k€ planar Germaniumplanar Germanium
24 k€ 24 k€ •consumables (electronics, acquisition...)consumables (electronics, acquisition...)
16 k€ 16 k€•T&S (about 15 travels of .4 k€ in France T&S (about 15 travels of .4 k€ in France and out)and out) 6 k€ 6 k€