ilc mechanical & electrical review

31
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical Team Joseph Kim Keyser Lam 1

Upload: nishi

Post on 24-Feb-2016

38 views

Category:

Documents


0 download

DESCRIPTION

ILC Mechanical & Electrical Review. Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical Team Joseph Kim Keyser Lam. Electrical Design and Cost Estimating. Parsons Basis of Design Klystron Cluster & DRFS Schemes - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ILC Mechanical & Electrical Review

1

ILC Mechanical & Electrical Review

Conventional Electrical SystemAmericas RegionDesign Summary

March 21, 2012

Randy Wielgos, FNAL

Parsons Electrical TeamJoseph KimKeyser Lam

Page 2: ILC Mechanical & Electrical Review

2

Electrical Design and Cost Estimating

ParsonsBasis of Design

Klystron Cluster & DRFS SchemesFull Power Beam OperationAmericas Region Standard Voltages

Conventional Facilities Development of Loads Mechanical & Electrical CoordinationDetermination of Load Characteristics

Engineering Drawings & Specifications for Estimating

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 3: ILC Mechanical & Electrical Review

3

SCOPE:• Conventional Electrical scope includes High Voltage and Low Voltage Electrical

Transmission and Distribution on the surface and in the tunnel• Estimating and Costing Follows the RDR WBS system

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 4: ILC Mechanical & Electrical Review

4

ELECTRICAL LOADDEVELOPMENT

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 5: ILC Mechanical & Electrical Review

5

LOAD TABLES - OVERALL

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Developed By Parsons

Page 6: ILC Mechanical & Electrical Review

6

Load Table progress –Basis for current Concept design

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

starting point use by Parsons latest

electron source just a single KW #Mar 02 2012

(statement only)positron source Aug 27 2010 Feb 25 2011 Mar 02 2012damping ring Aug 2 2010 Jun 17 2011 Feb 28 2012rtml Sep 7 2010 Sep 7 2010 Mar 14 2012main linac-KCS Dec 8 2010 Mar 23 2011 Mar 01 2012main linac-DRFS Jul/Aug 2011 N/AML-rdr style N/A N/A BDS Sep 27 2010 Sep 27 2010 Mar 02 2012IR Sep 20 2007 Sep 2007 & Jun 30 2010 Mar 09 2012dumps Feb 14 2012Cryo Feb 8 2011 Mar 07 2012Laser Feb 14 2012

Load Tables

Page 7: ILC Mechanical & Electrical Review

7

(sample load dis tribution) *EXCLUDING non-technica l components * Conventiona l Nos by PARSONS

New Shaft Nos PM-12 PM-11 PM-10 PM-8 PMB-0 PMC-0 PXA-0 PM+8 PM+9 PM+10 PM+11 PM+12

Old Shaft NosShaft 11 Shaft 7 Shaft

14 Shaft

15 Shaft

12 Shaft

13 Shaft

1.0 Shaft 16 Shaft 4 Shaft

17 Shaft 6 Shaft 10 TOTAL

MW *Tota l 8.3 18.1 10.1 10.1 3.8 14.4 16.7 10.1 18.1 10.1 18.1 7.8 212SURFACE

0.00 0 0.0029 RF 66 RF 66 RF 66 RF 66RF 66RF 66 RF 66 RF 26 RF

4.342 9.882 9.882 9.882 0 9.882 9.882 9.882 9.882 3.89329 RF 66 RF 66 RF 66 RF 66RF 66RF 66 RF 66 RF 26 RF

0.087 0.198 0.198 0.198 0 0.198 0.198 0.198 0.198 0.078CRYO (surface) 7.37 2.52 1.73 7.37 7.37 49.63

TUNNEL

45% rtml 10% 45% rtml

3.87 0.861 3.87105 RF 108 RF 101 RF

0.53 0.54 0.51

0.15 0.15 0.15

20% 80%

2.962 11.8

IR (tunnel)

0.456 0.456

*doesn’t include conventional 212

10.58

0.00 0.00

e - (surface)

0.30

0.00 0.30

ML conv magnets? (tunnel)

0.15 0.15

Dumps (in tunnel)

3.95 3.95

10.578

DR (in tunnel)

14.81

e+ TOTAL (in tunnel)

100%6.25

6.25

e- (in tunnel)

4.00

4

BDS (in tunnel)

0.15

66RF

0.198

109.20

81 RF

0.413.83

8.61

0.00

ML RF installed (surface)

66 RF 66 RF 66RF

9.882 9.882 9.882

ML Racks installed (surface)

66 RF 66 RF

0.198 0.198

ML Racks (tunnel)108 RF 81 RF

RTML Total (in tunnels)

0.00

0.54 0.41

Shaft 5 Shaft 3 Shaft 2

18.1 24.8 22.9

PM-9 PM-7 PM+7

7.37 7.96 7.96

DRAFT KCS POWER LOAD TABLE (Technical Equipment only)

March 21, 2012

Americas RegionConventional Electrical System Design

Summary

Page 8: ILC Mechanical & Electrical Review

8

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

LOAD TABLES - DETAILCONVENTIONAL FACILITIES

Page 9: ILC Mechanical & Electrical Review

9

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

LOAD TABLES - DEVELOPMENT

Page 10: ILC Mechanical & Electrical Review

10

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Developed By Parsons

LOAD TABLES – SUMMARY DETAIL

Page 11: ILC Mechanical & Electrical Review

11

ELECTRICALSYSTEM DESIGN

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 12: ILC Mechanical & Electrical Review

12

Electrical System Diagram 345 kVSupply

T345 – 34.5 kVTransformers

34.5 kV Switchgear

Distribution34.5 kV Switchgear

Distribution34.5 kV Switchgear

Distribution

T 345 – 69 kVTransformers

69 kV Switchgear

T 69 – 34.5 kVTransformers

34.5 kV Switchgear

Distribution

T 69 – 34.5 kVTransformers

34.5 kV Switchgear

Distribution34.5 kV Switchgear

DistributionAmericas Region

Conventional Electrical System DesignSummaryMarch 21, 2012

Page 13: ILC Mechanical & Electrical Review

13

Electrical System Tunnel Distribution

Americas RegionConventional Electrical System Design

Summary

• Conventional Power Distribution for KCS• Each 35kV/480V unit substation feeds nine 480V panel boards• Distance between shafts is approximately 2.1km, and distance from the

unit substation to the furthest panel board is approximately 1km.• Distance between 480V panel boards is approximately 232m.

March 21, 2012

Page 14: ILC Mechanical & Electrical Review

14

Emergency/Standby Power Systems

• Fire detection and alarm systems.

• Exit sign illumination.• Emergency lighting.• Elevator car lighting.• Fire Command Station

lighting.• Two-way fire department

communication systems.

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

• Elevators, elevator equipment, and elevator machine room/controller cooling.

• Air handling systems for the tunnels and elevator lobbies.

• Lighting for HVAC mechanical equipment rooms.

o Cranes, Sump/Lift Pumps.

• Ref: Hughes Associates - Life Safety/Fire Protection Code Analysis

o Project Requirement

Page 15: ILC Mechanical & Electrical Review

15

Power System Configuration

PM-8

PM+8

PM-7

PM+7

PMB0 PMC0

PM+9 PM+10 PM+11 PM+12

PM-9PM-10PM-11PM-12

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 16: ILC Mechanical & Electrical Review

16

Power System Configuration - KCS

PM-8 PM+8

PM-7 PM+7PMB0

PMC0 PM+9

PM+10

PM+11

PM+12

PM-9

PM-10

PM-11

PM-12345kV/69kV/34.5kV One Line Diagram

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 17: ILC Mechanical & Electrical Review

17

Power System Configuration - KCS345kV/69kV/34.5kV One Line Diagram

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 18: ILC Mechanical & Electrical Review

18

High Voltage Power Distribution

PM-8 PM+8

PM-7 PM+7PMB0

PMC0 PM+9

PM+10

PM+11

PM+12

PM-9

PM-10

PM-11

PM-12 Dual HV at 345kV circuits from utility power grid, for redundancyMain electrical switchyard located in Central Region

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 19: ILC Mechanical & Electrical Review

19

High Voltage Power Distribution

PM-8 PM+8

PM-7 PM+7PMB0

PMC0 PM+9

PM+10

PM+11

PM+12

PM-9

PM-10

PM-11

PM-12

(4) 345kV to 69kV 80MVA transformers(2) 69kV switchyards at Main Electrical Station

(4) 345kV to 34.5kV 80MVA transformers(2) 35kV switchgears

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 20: ILC Mechanical & Electrical Review

20

Medium Voltage Power Distribution

PM-8 PM+8

PM-7 PM+7PMB0

PMC0 PM+9

PM+10

PM+11

PM+12

PM-9

PM-10

PM-11

PM-12 69 kV Switchyards Feed Electrical LoadsAt Shafts +/- ,9,10,11,12

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 21: ILC Mechanical & Electrical Review

21

Medium Voltage Power Distribution

PM-8 PM+8

PM-7 PM+7PMB0

PMC0 PM+9

PM+10

PM+11

PM+12

PM-9

PM-10

PM-11

PM-12 35 kV Switchyards Feed Electrical LoadsAt Central Region & Shafts +/- 7, 8

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 22: ILC Mechanical & Electrical Review

22

Medium Voltage Power Distribution

PM-8 PM+8

PM-7 PM+7PMB0

PMC0 PM+9

PM+10

PM+11

PM+12

PM-9

PM-10

PM-11

PM-1269 kV Switchyards Feed 34.5 kV Substations

Electrical LoadsAt Shafts +/- ,9,10,11,12

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 23: ILC Mechanical & Electrical Review

23

Emergency Power Distribution

Emergency Power Distribution ProvidedBy Standby Generators at each Shaft4.16 kV Distribution to Transformers

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 24: ILC Mechanical & Electrical Review

24

Emergency Power Distribution

4.16 kV – 480 VUnit Substations / TransformersProvide Power for Distribution

to critical loads

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 25: ILC Mechanical & Electrical Review

25

Emergency Power Distribution

4.16 kV Looed FeedersProvide Power for DistributionTransformers to critical loads

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 26: ILC Mechanical & Electrical Review

26

Power Distribution for RF

The KCS RF Systems are Supplied by 34.5 kV Swithgear

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 27: ILC Mechanical & Electrical Review

27

Power Distribution for RF

The KCS RF Systems are Directly Supplied by MCC’s

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 28: ILC Mechanical & Electrical Review

28

Power Distribution for RF

The KCS RF Systems are Supplied by 480V Transformers & MCC’s

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 29: ILC Mechanical & Electrical Review

29

Power Distribution for Cryo

The Cryo Plants are Supplied by 34.5 kV Swithgear and 480V Transformers

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012

Page 30: ILC Mechanical & Electrical Review

Parsons Electrical Cost Estimate

• Bottoms Up Estimate• Mid 2011 Base Year• RAW Numbers – “Brick & Mortar”• KCS - Full Power Criteria

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012 30

Page 31: ILC Mechanical & Electrical Review

31

Questions?

Americas RegionConventional Electrical System Design

SummaryMarch 21, 2012