ILC Beam Dumps and Fast Extraction Line
Related Experience
Tim BroomeISIS Facility
• Physics• Engineering• Technology
![Page 2: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/2.jpg)
ILC Beam Dumps
Challenges• Power density
• Pulsed power effects (Cavitation, shock)
• Window design
• Safety (off-normal operation
• Radiation damage
• Induced activity
• Total power
![Page 3: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/3.jpg)
ILC Beam Dumps
water-system
air treatment
water-dump vesseldump shielding
enclosure
emergency/comm. beam
tilted ≈15mrad
spent beam, tilted ≈15mrad
hall
basin
exhaust / chimney?
sand
normalcooling water
Water Dump: Overall SchemeWater Dump: Overall Scheme
![Page 4: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/4.jpg)
ILC Beam Dumps
Requirements• Simulation
Beam Transport, Heat deposition, activation, secondary particles
• Shielding
• Materials
Radiation damage, high thermal and stress loads
• Engineering
Thermal analysis, CFD, Stress analysis, remote handling
• Radioactive discharges, waste
Solid, Liquid, Gaseous
![Page 5: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/5.jpg)
ILC Beam Dumps - Simulation
Codes available:
• Beam Transport
• GEANT, FLUKA, MCNPX, CINDER90
Electromagnetic cascade
Neutron transport
Deposited Heat
Radionuclide production
Induced activity
![Page 6: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/6.jpg)
ILC Beam Dumps - Shielding
Codes: MCNPX, FLUKA, GEANT
JSNS Shielding Design
![Page 7: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/7.jpg)
ILC Beam Dumps - Engineering
Expertise• Spallation Targets
• Active Water Cooling Circuits
• Fully Remote Handling
• Vacuum
• Analysis: Thermal, Stress, CFD
(ANSYS, CFX)
• Design – CAD 2D and 3D
• Electrical engineering
• Controls
![Page 8: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/8.jpg)
ILC Beam Dumps - Radiation Damage
Available Data
• Proton and Neutron damage data available for almost all useful materials
• Status of high energy electron and photon damage data??
• Assessment of component lifetimes from radiation damage data is problematic.
![Page 9: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/9.jpg)
ILC Beam Dumps – Radioactive Waste and activation
Solid, Liquid and Gaseous waste generated in operation and decommissioning
• Quantities well within what ISIS has to deal with currently
• Disposal arrangements are very site dependent
• Activation calculations – codes available
• Predicted dose rates on components ~ 100mSv/h require fully remote handling
![Page 10: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/10.jpg)
ILC Beam Dumps – ISIS Spallation Source
Target
Proton Beam 160 kW
Remote Handling Cell
Shielding Services Area
![Page 11: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/11.jpg)
‘High Power’ Targets
ISIS 250 kW
SNS Mercury 2MW
Neutrino Factory 4 MW
PSI 1MW
![Page 12: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/12.jpg)
Spallation Targets – Water Cooling
3 Active Water loops
• ~9 TBq/m3 Tritium
• IOX cleanup
• Filters
• Maintenance
• Monitoring
![Page 13: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/13.jpg)
Remote Handling
Fully remote handling
Master-slave manipulators
Special tooling
Handling complex assemblies
![Page 14: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/14.jpg)
Remote Handling - Seals
Adaptation of commercial seals for remote handling
Pneumatic boltless sealsSNS Proton Beam Window5 x 10-6 torr l/s leak rate
![Page 15: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/15.jpg)
ILC Beam Dumps - Safety
Off normal events may well drive the design
• Failure of beam expander system – how long before the window fails?
• Failure of gas recombiner systems• Major leak of water/gas (gas more difficult)• Instrumentation problems• Interlock design
![Page 16: ILC Beam Dumps and Fast Extraction Line - DESY · • GEANT, FLUKA, MCNPX, CINDER90 Electromagnetic cascade Neutron transport Deposited Heat Radionuclide production Induced activity](https://reader035.vdocuments.us/reader035/viewer/2022081606/5e3e7bd563d16213810832f8/html5/thumbnails/16.jpg)
ILC Beam Dumps - Summary
A great deal of useful experience exists in CCLRC outside the ILC community
Relevant experience in CCLRC exists in most areas(Neutron source, Neutrino factory as well as ILC teams)
Areas where the knowledge is relatively weak• Radiation damage• High pulsed power effects• Gas recombiners
New ideas may well be needed• Rotating metal (AL) target in the water bath?• Flowing liquid metal (e.g. Gallium) beam dump?