iii. task analysis - united...
TRANSCRIPT
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
The criteria for the selection of services to be included in the OPEN System were those services with a history ofcorruption scandals, services prone to improprieties due to the complexity of procedures, and services that wouldbenefit from the system by preventing undue influence and irregularities. After 28 services provided by City Halland 87 services from local district offices were first scrutinized for possible impacts if introduced on the OPENSystem (which disclosed information on the assigned offices for the applications, processing time, related regula-tions, etc.), the final list was narrowed down to include a total of 26 services.
1. Selection of Services Accessible to the Public
1) Criteria for Selection
DBDataSeoul Metropolitan Government
Services01010101010 010101010 101010101010101010101
01010101010101010101010101010 1010101010101010
III. Task Analysis2
8/2
9
Services Description
Purchase of park sites Purchases land from private owners whose property is part of the location selected by the city governmentas a park development area.
Authorization /contract agent of waste disposal
license
Acts as a contract agent and oversees contract signing between the chief officer of the Gu district and theoperation licensed for the collection and transportation of waste.
Traffic impact assessment
Before approving or licensing a new business or a facility that has the potential of creating excessivedemand on traffic flow, a review and analysis are conducted by private companies for traffic impact assess-ment to examine potential problems, alternatives and proposed improvements in order to minimize its effecton existing traffic flow. The Tr a ffic Impact Deliberation Committee deliberates and makes the final deci-sion on approval / licensing.
Route adjustments for the city busoperated by private companies
New route development andadjustment for local area bus
operations
As a means to provide easy access to city buses and subway trains, local area buses are operated by privatecompanies in areas that city buses do not serve in order to relieve residents of any inconveniences. Districto ffices offer new local area bus routes to areas without local area buses and adjust routes by cutting orextending existing routes.
Bus terminal operation authorizationfor express / long-distance bus
In charge of the approval process of express bus and/or long-distance bus terminal construction.
Standardization and adjustment ofbus fares
Approves bus fare adjustments made by transportation businesses in accordance with the passenger trans-portation business regulations.
Purchasing Purchases equipment and supplies for city departments.
S ervices Included in the First Phase of the OPEN System
Oversees changes in operation routes of city buses when a business with a city bus operation permitrequests a change of route, presents plans to change operations, or the district office or citizens request aroute read-justment.Orders/approves the city bus operation business to change operation and routes as necessary.
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
Services Description
Authorization and administrativeprocedures for bars and
entertainment spots
Approves and supervises bars that serve liquor, hire entertainers, install entertainment facilities and karaokerooms that serve liquor and allows customers to use the karaoke facilities.
Registration processing foropening / changing large-scale
commercial establishments
A large-scale commercial establishment refers to a group of stores in full operation with a minimum totalsize of 3,000 square meters. Citizens intending to operate such establishments must register with the City orthe district government.
Fund raising for small /mid-sized businesses
Funds small/mid-sized businesses in order to support management and improve long-term competitivenessof businesses located in the Seoul area.
Deliberation and approval of theinstallation of art works in buildings
Deliberates and approves the installation of art works in new or expanding large-scale buildings within therange of 0.1% - 1% of total construction costs.
Permission of land-use changeChange in land use, lumbering or planting trees, quarrying, using land as a storage site, concerning all landwithin the urban planning zone require the approval of the Mayor or the ward chief.
Decision and change of urbanplanning
Opens the decision making process of urban planning to the public. Urban planning approval or adjustmentimposes a legal binding force as well as a direct restraint on one s property rights to benefit the general pub-lic.
Natural gas consumer priceadjustment
Determines the final consumer price of natural gas which includes raw material costs. Final approval ismade by the Mayor of Seoul after a deliberation by the City of Seoul Consumer Price Committee that takesinto consideration the overall change in consumer prices and increases in the rate of public facilities' costs.
Contract agent for social welfarefacilities
Contracts with private enterprises or groups to commission the operation of social welfare facilities built bythe City of Seoul or district governments including social welfare halls, welfare facilities for the elderly,welfare facilities for the handicapped, youth facilities, facilities for those with mental handicaps.
III. Task Analysis3
0/3
1
Services Description
Housing construction projects
Review and permission of building projects
In charge of projects demolishing dilapidated apartment buildings.
Deliberates and approves the new construction of buildings exceeding a certain size. Reviews its adherenceto construction regulations.
Construction technology services Orders services including pre-construction project planning, feasibility studies, basic designs, implementa-tion plans for the expansion and maintenance of facilities.
Compensation procedures Makes compensations to civilians whose land or buildings have been appropriated for public projects suchas road construction or park development.
Implementation of facilityconstruction
Oversees civil engineering works, construction, industrial facilities works, landscape architecture and envi-ronment facility construction.
Fire prevention facilities inspectionNew construction or expansion of fire prevention facilities requires the selection of approved fire preventionconstruction business which must report to the chief of the fire department in the district on the content and theconstruction details of the project. The report and the construction, as finished, are subject to inspections.
Annual contracts for facilitiesmaintenance
The Facility Maintenance Bureau enters into annual contracts for facilities maintenance and small-scalerepairs (installation/repair of handrails, safety fences, guardrails, cleaning tunnels and underpasses, sewagefacilities maintenance, rainwater drain channels maintenance). Maintenance is ordered as needed and paidfor.
Housing redevelopment projectsRefers to the refurbishment of residential areas with buildings in poor conditions without proper publicfacilities. The primary purposes of the project are efficient use of land, proper use of altitude, recovery of itsfunction as part of the city, wholesome city development, and enhancement of the public welfare.
Urban restructuring projects
Projects including improvement of structures/sites, site selection, public facilities improvement in order topromote proper use of altitude, and recovery and transformation of its function within and around the city,as well as around major roads. Manages the construction of business operations, sales, lodging facilities aswell as residential buildings that also accommodate commercial establishments in semi-residential districtsand commercial zones.
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
Services Procedure
Review and permission ofbuilding projects
byHousing Bureau
(Architecture Division)
Local Autonomy District
Potential Impropriety Information Open to the Public
- Application and submission for deliberationof construction plan
- Minutes of the deliberation
- Plans for the Committee Deliberation andagenda
- Prior Approval Application for constructionAuthorization
- Contents of deliberations with relatedoffices and the attached content of the chiefof the Gu office
- Guidelines for prior approval
- Application for construction authorizationand change of use
- Contents of the deliberation and correspon-dence
- Guidelines for the construction authoriza-tion
- Approval Application for Use (SupervisionReport)
- Contents of deliberations and correspon-dence
- Guidelines for approval of use
Architectural review1. Application and submission for deliberation of construction plan (Applicant->
Gu District -> City Architecture Division)City Government Deliberation: 16 stories high or more, 30,000 square meters orlarger.Gu District Deliberation : less than 16 stories high, 5,000 - 30,000 square meters.
2. Review of construction committeeCommittee members :
City: 20 members including the Housing Bureau DirectorGu:10 members
3. Announcement of architectural review decision (City Hall -> Gu Office-> Applicant)
Prior Approval4. Prior approval application for architectural authorization
- Eligibility: 21 stories or higher, structure larger than 100,000 aggregate square meters
5. Deliberations with related offices and attachments of review by chief of the Guoffice (Chief of the Gu office -> Mayor)
6. Prior approval (Mayor ->Chief of the Gu office)- Architecture Director- Housing Bureau Director
7. Architectural authorization application (applicant -> Gu office)
8. Deliberations with related offices (if necessary)
9. Construction authorization procedure (Gu office -> applicant)- Architecture Director, City Management Director, Vice Chief of the Gu office,
Chief of the Gu office
10. Approval application for use (Applicant -> Chief of the Gu office)
11. Deliberations with related offices
12. Approval for use (Chief of the Gu office -> Applicant)- Architectural Director, City Management Director, Vice Chief of the Gu office,
Chief of the Gu office
Deliberation in favor ofapplicant
- Approval in favor of theapplicant
- Lobbying in favor of theapplicant
- Architecture Director, CityManagement Director,Vice Chief of the Gu office,Chief of the Gu office
Exam
ple
1. R
evie
w a
nd p
erm
issio
n of
bui
ldin
g pr
ojec
ts
R eview Data of Services Open to the Public
III. Task Analysis3
2/3
3
Services Procedure
License for Bar andEntertainment business
by the Gu Office(Health Department)
Potential Impropriety Information Open to the Public
- Application for the authorization of opera-tion
- Review outcome, onsite inspection results
- Contents of the deliberation with relatedoffices and departments
- List of inspection officials, businesses, thetime and date of inspection
- Findings of the inspection and confirmation
1. Application for the authorization of business operation -> Gu office, HealthDepartment
2. Document review & business inspection(Feasibility study) - Gu office, HealthDepartment
3. Deliberation with related offices and department- Fire department, Education Bureau, Waste Department, Construction
Department, City Planning Division
4. Permit issuance- Gu office, Health Department -> Business operator
5. Crackdown on illegal operations or change in facilities- Gu office, Health Department
- Overlook incomplete facili-ty setup, over-the-limit useof area, and other inappro-priate matters
- Approval of incompletefacilities, on prohibitedconstruction zones, illegalstructures, insufficient se-wage disposal facilities
- Overlook illegal operation,expansion / change of facil-ities without authorization
Exam
ple
2. A
utho
rizat
ion
and
adm
inist
rativ
e pr
oced
ures
for
bars
and
ent
erta
inm
ent s
pots
R eview Data of Services Open to the Public
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
A system and program development took place,based on the information provided by city depart-ments of the selected services to first enter the OPENSystem, including information on the services,administrative procedures, related regulations,required time for the application processing,approval procedure, and information open to thepublic in order to set the standard for data input pro-cedure.The OPEN System input model was developed with
city officials on adopting an easy and convenientmethod for the employees undertaking the input taskas well as for the applicants to facilitate their under-standing.Related regulations are provided to the applicants in
two formats. First is the Regulation Search Systemthat allows the applicants to examine the originalregulations established by the central government andthe Seoul Metropolitan Government using the mainmenu of the OPEN System. Second is the regulationsprovided through the administrative procedure infor-mation of a specific service. The related regulationsfurnished by the model for the input processing sys-tem deals with the latter.
2) Presentation des fonctions principales du programme
Dat
a: H
ousin
g B
urea
u
Accepts construction authorizationapplications (Civil Service Office)
Article 7 & 9 of theTemporary Regulationson Improving HousingConditions for LowIncome Urban Residents
Article 16 of theBuilding Act
Article 18 of theBuilding Act
Examines construction authorizationapplications
Approves construction authorizationapplications
Issues construction authorization
Accepts construction initiation report (Civil Service Office)
Examines construction initiation report
Examines applications for use
Approves applications for use
Issues applications for use
Approves construction initiation(processes construction initiation report)
Accepts applications for use (Civil Service Office)
ServiceConstruction approval and
deliberationRelated Regulations
Assigned Assistant Dire-ctor Department Head
Required Processing Time
Attachments
Purpose of Disclosure
Administrative procedures forconstruction approval, constructionbeginning report, approval for use
The applicant can confirmthe administrative proce-dures, required processingtime, and future proce-dures on construction autho-rization/licensing process.
S ervice Procedures
III. Task Analysis3
4/3
5
Accepts applications for construction authorization
Construction Authorization
Construction Initiation Report
Approval of temporary use
Approval of use
Residential Environment Improvement project(Construction Authorization/Licensing) Accepts applications for construction authorization (change in design)
Examines related regulations & deliberation among related offices
Discontinue/Return applications
Issue construction approval
Issue construction approval (change in design)
Submit the construction initiation report
Accepts applications for temporary use
Examines related regulations & deliberation among related offices
Approves temporary use
Approves temporary use
Examines related regulations & deliberation among related offices
Issues approval of use
A dministrative Procedure Chart
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
S tandard Input Model for the OPEN System
1. Date of Application: (month, day, year)2. Contents of the Application
Location: Gu, DongArea of the Site : 0000 ,District / Zone : District, Zone Size : Underground 0 level, 00 level above ground,
aggregate area 0000Purpose :Building-to-land Ratio : 00%, Floor Area Ratio : 00%Grounds for Application : New construction( )
Expansion( ) Other( )3. Scheduled Date for the Deliberation : (month, day,
year)4. Follow-up:The present deliberation is a technical examination of theplans for construction (groundbreaking). Applicants will benotified of the outcome of the deliberation within 0 daysfrom the scheduled deliberation date if no other special cir-cumstances arise.
App
licat
ion
for t
he C
onstr
uctio
n Pl
anni
ng
Same as the original( ), conditional( ),supplementary( ), review( ), withheld( )
1. Deliberation Decision Date : (month, day, year), ( )th Request for Change in Design
2. Contents of the Deliberation Decision (conditional)3. InformationThe Construction Authorization is due (month, day, year).Upon completion of the On-site inspection, examination ofrelated regulation, and consultation with other departments,the applications will be approved within 0 days from thescheduled deliberation date if no other special circum-stances arise.
Not
ice
of th
e D
ecisi
on fr
om th
e Co
nstru
ctio
n Co
mm
ittee
III. Task Analysis3
6/3
7
1 . Date of Application: (month, day, year)
2. Contents of the ApplicationLocation: Gu, DongArea of the Site : 0000 ,District / Zone : District, Zone Size : Underground 0 level,
00 level above ground, aggregate area 0000
Purpose :Building-to-land Ratio : 00%,Floor Area Ratio : 00%
3. Follow-up:The Construction Authorization is due (month, day,year). Upon completion of the on-site inspection,examination of related regulation, and consultationwith other departments, the applications will beapproved within 0 days from the scheduled delibera-tion date, if no other special circumstances arise.
1. Results of the On-site InspectionOn-site Inspection Date : (month, day, year)On-site Inspection Results
2. Follow-up: Approval for the construction authorization will be made within 0days after the deliberation with related departments and the reviewof related regulations.
App
licat
ion
for C
onstr
uctio
n A
utho
rizat
ion
Revi
ew of
the R
egul
ation
s on O
n-sit
e Ins
pecti
on an
d Bas
ic Co
nditi
ons f
or C
onstr
uctio
n
Category RemarksInspection Contents Inspection Results
Site
Site formation, need for changein use of site, stability of thesite, above ground obstacles,underground obstacles
Need : Yes( ) No ( )Safety : Yes( ) No ( )Existence : Yes( ) No ( )
Category Review ResultsReview Contents Applied Regulation
Land Ownership Regulation Article 6
Road
Types of road, number of roadsadjacent to the site, width &length of the road, pedestrianroads or vehicle roads
Width m, Length mPossible ( ) Impossible ( )
Attachments Yes( ) No ( )
Building-to-LandRatio
Floor Area Ratio
Building-to-Land RatioFloor Area Ratio
( )% or lower( )% or lower
Appropriate ( )Inappropriate ( ) ( )%Appropriate ( )Inappropriate ( ) ( )%
Height LimitationBy zone or road
Imposition of height limits tosecure sun light
Regulation Article 51 and5 3
Appropriate ( )Inappropriate ( ) n/a ( )Appropriate ( )Inappropriate ( )n/a ( )
Urban DesignStudy the appropriateness for
an urban design Secure public site
Appropriate ( )Inappropriate ( )
n/a ( )( )%. n/a ( )
Appropriate ( )Inappropriate ( )n/a ( )( )%. n/a ( )
Parking Lot Amount of parking facilitiesAppropriate ( )
Inappropriate ( )n/a ( )
Appropriate ( )Inappropriate ( )( ) Units
OtherArchitectural Review( )
Traffic Impact AssessmentDeliberation ( )
Deliberation CriteriaApplied ( )Not Applied ( )n/a ( )
Documents to prove the sitearea, ownership, and its use
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
1. Date of Cancellation Submission : (month, day, year)2. Contents : Same as the application3. Information
The Application for the Construction Authorization has been approved under article 8of the Construction Law. Please pick up the construction authorization document fromour Gu-office Civil Application Services division with a copy of the receipt and thepurchase certificate of the housing bond.- License tax receipt for the construction authorization (Amount: won)- Housing bond purchase certificate (Amount: won)
Upon receipt of the construction authorization document, collect the constructiondesign plan from the design office to begin the construction. Please observe the autho-rization conditions and the information provided. A registered architect must be select-ed as the construction supervisor at the beginning of the construction.If the construction has been order to a third party, the constructor must be registered asa construction business.A copy of the construction contract between involved parties along with design plansincluding block plans, floor plans, an elevation, a cross section, structural plans (forstructures subject to structural safety inspection), specifications, indoor plans, fire pre-vention equipment plans, construction equipment plans, excavation plans and a breastwall plan must be submitted to the authorizing party and report the beginning of theconstruction.Failure to launch the construction within 1 year of the construction authorization willresult in the cancellation of the authorization. Under compelling circumstances, how-ever, an extension of 1 year is allowed.
Issu
ance
of t
he C
onstr
uctio
n A
utho
rizat
ion
1. Date of Application: (month, day, year)
2. Deliberation among relat-ed departments
: (month, day, year)Departments (division)Date of Communication
Contents ofCommunication
Fire Department (FirePrevention Law) (month,day, year) Traffic AdministrationDivision (ParkingRegulation) (month, day,year)
3. Follow-up : An onsite inspection will takeplace within 0 days. After theinspection and deliberation theconstruction authorization willbe issued within 0 days if nospecial circumstances arise.
Del
iber
atio
n am
ong
Rela
ted
Dep
artm
ents
rega
rdin
g th
e Con
struc
tion
Aut
horiz
atio
n
III. Task Analysis3
8/3
9
1. Date of Return : (month, day, year)2. Grounds for Return 3. InformationThe grounds for return shall be resolved with the designplan that complies with the Building Act and related regula-tions before reapplying.
Retu
rn o
f the
App
licat
ion
for t
he C
onstr
uctio
n A
utho
rizat
ion
1. Date of Cancellation Submission : (month, day, year)2. Reasons for Cancellation
3. Date of Cancellation : (month, day, year)4. InformationThe application must be accompanied by a constructiondesign that complies with the Building Act and related regu-lations.
Canc
ella
tion
of th
e A
pplic
atio
n fo
r the
Con
struc
tion
Aut
horiz
atio
n
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
1. Date of Submission : (month, day, year)2. Content
Supervisor :Constructor :
3. Follow-Up : The construction must follow the approved design. Underthe inspection plan to crackdown on illegal structures within4 months from the beginning of the construction, structuresthat are constructed through an agency (4 levels or lower,2,000 or smaller) are subject to cross inspection amongautonomous districts to verify whether the constructioncomplies with the design. At the time of the application foruse, special inspectors conduct inspections. Upon comple-tion of the structure the application for use shall be submit-ted, attached with the Final Report on the ConstructionSupervision.
Subm
issio
n of
Con
struc
tion
Initi
atio
n
1. Date of Inspection : (month, day, year)2. Inspection District : 00Gu3. Inspection Results
Satisfactory ( ), Unsatisfactory ( )Violations- -
4. Follow-Up :After making corrections of the violation, a FinalCorrection Report by the inspector with photographs ofbefore and after the correction must be submitted.
Regu
latin
g Ill
egal
Stru
ctur
es (R
egul
ar In
spec
tion)
III. Task Analysis4
0/4
1
1. Date of Application : (month, day, year)2. Content
Site Area : 0District Zone : District, ZoneSize : Underground 0 level, 00 level above ground,
aggregate area 0000Purpose : Building-to-Land Ratio : 00%, Floor Area Ratio : 00%ConstructorSupervisor :Grounds for Application :Requested Period of Temporary Use: From (month, day,year) to (month, day, year).
4. Follow-Up :The approval for the temporary use shall be given afterreviewing the documents if no serious defect is discovered.
App
licat
ion
for T
empo
rary
Use
1. Date of Approval : (month, day, year)2. Content : Same as in the application3. Approved Period for Temporary Use: From (month,
day, year) to (month, day, year)4. Conditions for the Approval of Temporary Use :
5. Follow-Up :Please apply for the use of the structure by fulfilling theconditions for temporary use approval.
App
rova
l of T
empo
rary
Use
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
1. Date of Application2. Content
Site Area : 0District Zone : District, ZoneSize : Underground 0 level, 00 level above ground,
aggregate area 0000Purpose : Building-to-land Ratio : 00%, Floor Area Ratio : 00%ConstructorSupervisor :
3. Follow-Up :The examination and inspection of structure for theapproval for use are based on the Final Inspection Reportwritten by the supervising architect. On-site inspection bypublic officials is not conducted. However, structures thatare constructed through an agency (4 levels or lower, 2,000
or smaller) are subject to the inspection on the use by aspecial inspector. The approval for the temporary use shallbe given after reviewing the documents if no serious defectis discovered.
App
licat
ion
for U
se
1. Request Date of the Inspection : (month, day, year)2. Use Inspection
Date of Inspection : Inspection Result : Satisfactory ( )Unsatisfactory ( )Violation- -
3. Follow-Up :The inspection for use was satisfactory and the applicatiowill be approved immediately.The inspection for use was unsatisfactory and the applica-tion will be returned.Please resubmit the Application for Use after making cor-rections.
Insp
ectio
n of
Use
by
a Sp
ecia
l Ins
pect
or
III. Task Analysis4
2/4
3
1. Date of Application : (month, day, year)2. Deliberation among Related Departments (division)
: (month, day, year)Related Departments Date of Communication Contents 00Fire
Department (Fire Prevention Law) Traffic AdministrationDivision(Parking Regulation)
3. Follow-Up :Authorization of construction will be issued within 0 daysafter the deliberations if no special defect is discovered.
Del
iber
atio
n am
ong
Rela
ted
Dep
artm
ents
on A
utho
rizat
ion
for U
se
1. Date of Authorization for Use : (month, day, year)2. Content : Same as the application 3. InformationThe owner of the structure shall maintain and manage thestructure in compliance with Article 26 of the Building Lawaccording to the contents of the construction approval.Structures constructed through an agency will be subject toinspection within 4 months from the approval date for use.Mid-size and large-size structures will undergo regularinspection in compliance with the regulatory plans againstillegal structures.Please submit the acquisition tax to the tax department ofthe Gu offices within 30 days from the approval date of use.Please pick up the registration tax form from the tax depart-ment of the Gu offices and make payments by structure reg-istration application. Please register the structure at the court registry office with-in 60 days from the use approval date.
Issu
ance
of t
he A
utho
rizat
ion
for U
se D
ocum
ent
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
R elated Regulations
Construction Authorization- Article 4 of the Building Act, Article 5 of the Enforcement Decree of the
Building Act, Article 7 of the Construction Ordinance of the SeoulMetropolitan Government
Construction Authorization- Article 8 of the Building Act, Article 8 of the Enforcement Decree of the
Building Act Report on the Beginning of the Construction- Article 16 of the Building Act, Article 5 of the Building Act Enforcement
Regulation
Temporary Use Approval- Article 18, paragraph 3 of the Building Act
Approval for Use- Article 18 of the Building Act, Article 17 of the Enforcement Decree of
the Building Act
1. Return Date : (month, day, year)2. Grounds for Return3. Information
Please resolve the violations and reapply for theuse along with the Final Inspection Report.
Retu
rn o
f the
App
licat
ion
for t
he U
se
III. Task Analysis4
4/4
5
A frame for a standard document form was prepared by compiling input standard models developed by offices incharge of each services to be opened to the public.
2. Standardization of Documents by Service Category
1) Steps toward Standardization
(1) The administrative procedures of each services must be clear.
(2) Documents to be entered and managed at each step of the procedure must be established.
(3) The statistical data included in the documents should be standardized for future use as basic data.
2) Instructions for the Data Standardization Task(1) Standardization must take place after taking all contents of the data into consideration since
services contain different types of data.
- Procedures of services vary from 2 to 10 steps.
(2) Due to the various types of documents to be entered at each procedure for different services, a
thorough inspection must take place.
- Application for Authorization Form, Review Form, Deliberation Items, Deliberation Decision, Assigned
Department, Current Status of the Application, Officer Responsible for the Final Decision
(3) A clear standard for data to be managed and data to be stored for future use must be established.
- Due to data registration and usage by different departments, a considerable amount of time is required for
the selection of data.
(4) The possibility of a task involving multiple departments or another method of processing an
identical task calls for cautious and thorough examination.
- Active participation from related departments should be encouraged for the clear understanding of the
nature of the tasks for each services.
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
3) Flow Chart of the Document Standardization for Each Service
The document standardization for each service require an analysis of the documents that are managed and the typesof data needed in each documents which is followed by the understanding of the nature of the data depending on itsusage. The data are divided into two categories: File mode and DB mode.
Steps for document standardization for the services
The types of data neededData needed for the 54 services
Identification of the data to be managed
The setup of mode depending on the nature of the dataAnalysis of the nature of each data
The setup of mode depending on the nature of the dataTXT(File System)mode/DBmode
The setup of mode depending on the nature of the dataTXT(File System)mode/DB mode
Data Loading and CompletionData loading on the file system and DB
Modification of Data ModeWhen text data becomes linked with other data
TXT File CompilationExample of files by category that are already established
DB SetupNew DB establishment
III. Task Analysis4
6/4
7
Category 1 Category 2
The standardization of documents is necessary to provide a broad range of information services. As a result of thestandardization, data is stored as either DB files or text files. These standardized data are essential to the programdevelopment in the setup of display design, data to be displayed on the screen, and the input procedure of documentcontent.Document data of the Seoul Metropolitan Government's OPEN System includes 4 categories depending on the
items included for the services. The details are as follows.
Taxi fair adjustment, Establishment of the bus fare standard and the rateschedule, Urban gas consumer price adjustment, New route developmentand adjustment for village bus operations
Case Registration- Case name- Assigned officer- Contact telephone number- Case registration date- Autonomous Gu district of
the service
Document Registration- Document processing date- Document registration date- Assigned officer- Contact telephone number- Content- Location of related documents- O fficer responsible for the final
decision- Current status of the application- Attachments- Attachment details
Traffic impact assessment, Purchase of park sites, Urban planningapproval and adjustment
Case Registration- Case name- Assigned officer- Contact telephone number- Case registration date
Document Registration- Document processing date- Document registration date- Assigned officer- Contact telephone number- Content- Location of related documents- O fficer responsible for the final
decision- Current status of the application- Attachments- Attachment details
3 . Categorization by Service & Type
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
Category 3
Category 4
Authorization and administrative procedures for bars and entertainment spots,Registration processing for opening/changing large scale commercial establish-ments
Case Registration- Case name- Assigned officer- Contact telephone number- Case registration date- Autonomous Gu district of
the service- Location of the case- Type of business- Permit Number (limited to
Authorization and administra-tive procedures for bars andentertainment spots)
Document Registration- Document processing date- Document registration date- Assigned officer- Contact telephone number- Content- Location of related documents- O fficer responsible for the final
decision- Current status of the application- Attachments- Attachment details
Implementation of facility construction, Design modification of facility con-struction, Construction technology services, Annual contract on facility mainte-nance cost
Case Registration- Case name- Assigned officer- Contact telephone number- Case registration date- Autonomous Gu district of
the service- Location of the case- Type of business- Supervisor- Designer- Constructor
Document Registration- Document processing date- Document registration date- Assigned officer- Contact telephone number- Content- Location of related documents- O fficer responsible for the final
decision- Current status of the application- Attachments- Attachment details
III. Task Analysis4
8/4
9
An analysis of the data regarding the 54 services to be opened to the public are divided into D/B files and text files.
4. The Establishment of Database
Case Management Document Management
- Case name- Name of the officer assigned to the case- ID of the officer assigned to the case (automatic)- Case registration date (automatic)- Case Category (where relevant)- Autonomous district of the case (where relevant)- Location of the case (where relevant)- Specific data that must be managed by specific ser-
vices
- Document title- Name of the document input officer- ID of the document input officer (automatic)- Document registration date (automatic)- Name of the document editor (automatic)- Edit date of the document (automatic)- Name of the official responsible for the final decision- Current status of the application- Current status of the application procedure to date (automatic)- Request date of the document processing- Other required data management (Example: procedures etc.)
Document Management
Detail Contents of the Document- The details of the documents are difficult to standardize, nor is there any need for standardization. The contents of the
577 documents from 54 service areas are all different in their types and forms, which makes it impossible to find anappropriate standardized format. In addition, the contents are subject to constant change, which makes document man-agement more convenient in the form of text files.
DBTe
xt Fi
leD
ata S
tore
d as
Dat
a Sto
red
as
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
The break down of the processing procedures is illustrated in figure below. Level one and two are the case nameand the procedure name, respectively. Level three deals with the detailed procedures of each process. System man-agement involves all three levels. The title of the detailed procedures can be modified. In case there are no detailprocedures, one can choose the Other option and enter the data.
5. The Breakdown of the Process
Step 1 of the system operation
Step 2 of the system operation
Server System
Step 1 procedure details
Step 2 procedure details
Construction Authorization System operation procedure (n)
T he Breakdown of the Process
III. Task Analysis5
0/5
1
Application for the Architectural Review
Application for the Construction Authorization
Authorization of Temporary use
Review and permission of buildig projects
Application Form for the Architectural Review
Decision of the Construction Committee
Application Form for the Construction Authorization
Construction Authorization Contents of the Construction Authorization
Notice on New Construction Notice Form for New Construction
Application for the Authorization of temporary use
Authorization of temporary use
Authorization of useApplication for the Authorization of use
Authorization of use
P rocess Breakdown for the Construction Authorization and Deliberation Service
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
6. Flow Chart of Service Execution
1. Case name registrationGu, Dong, Address, Type of business
2. Register information of each procedure regarding authorization ofestablishments
Business License Application- Application Document Review
Date of application, total area of the operation
(number of seats, rooms, kitchens, etc.)
Review decision of related documents for authorization application
(pass/fail)
~ Urban planning confirmation (pass/fail)
~ Building management ledger (pass/fail)
~ Identity clearance of the applicant (pass/fail)
~ Fire equipment, fire prevention facilities completion (pass/fail)
~ Deliberation report on clearance zone of nearby school areas (pass/fail)
Corrective actions on insufficiencies after document review
~ Grounds for the insufficiencies
~ Date of demand for correction
~ Deadline for correction
~ Registration date of the corrected document, review date of the corrected document
~ Return date of application documents for insufficiency
Follow-up
- On-site Inspection
Exam
ple
1 : A
utho
rizat
ion
and
Adm
inist
rativ
e Pr
oced
ures
for B
ars
and
Ente
rtain
men
t Esta
blish
men
ts System Manual Processing
1
Case Name Registration
Procedure DBCase DB
Document Registrationby Procedures
Input
Input
1
2 2
III. Task Analysis5
2/5
3
Inspection date, condition of the building (pass/fail), condition of facilities (pass/fail), total
area of operation
Corrective actions on insufficiencies after on-site inspection
~ Grounds for insufficiencies
~ Corrected version
~ Submission date of correction completion
~ Confirmation outcome of the correction inspection
~ Return date of application documents
Follow-up
- Deliberations with related departments
Contents of the deliberations with other departments involved in licensing tasks
~ Reasons for the deliberation, departments involved, deliberation request date
~ Announcement date of the outcome of the deliberation, outcome of the deliberation
Insufficiencies discussed in the deliberation
~ Grounds for the insufficiencies
~ Date of demand for correction, deadline for the correction
~ Deliberation outcome of related departments on corrective measures
~ Return date of application documents
Follow-up
License IssuanceLicense Issue Date, Information
Crackdown on Illegal Operation and / or Unauthorized Facility Moderation- Crackdown on Illegal Operation and / or Unauthorized Facility Moderation
Inspection date, Department conducting the inspection
System Manual Processing
1
1
Case Name Registration
Procedure DBCase DB
Document Registrationby Procedures
Input
Input
1
2 2
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
System Manual Processing
Violations
Administrative schedule for penalty
Follow-up
- Administrative Penalties on Illegal Operation and/or Unauthorized Facility Moderation
Date of inspection, date of penalty, violations
Contents of the penalty
~ Warning
~ Correction order
~ Correction order on facilities
~ Operation shutdown
~ License revocation
~ Penalty fee
Information
Violations
3. Register pertinent information on the database
4. Detailed information search by procedure
Information Searchby Procedures Search
Document DB
1
2
1
III. Task Analysis5
4/5
5
Exam
ple
2: R
evie
w a
nd p
erm
issio
n of
Bui
ldin
g Pr
ojec
ts System Manual Processing
1. Register the construction authorization / deliberation caseGu, Dong, Address
2. Register information of each procedureArchitectural Review Application
- Architectural Review Application Form
Date of application, Contents of the application(total area, size, function, building-to-land ratio)
- Deliberation Outcome from the Construction Committee
Deliberation date, Contents of the deliberation
Follow-up
Application for Construction AuthorizationApplication date, Contents of the authorization
(modifications/additions to the original application must be entered)
Related regulations and consultation among related departments
Follow-up
Construction Authorization- Contents of the Construction Authorization
Application date, Contents of the authorization(modifications / additions to the original application must be entered)
Conditions for authorization
Follow-up
Notice of the Start of Construction- Notice Form for the Start of Construction
Application date, Contents of the application(Construction size, building-to-land ratio, function of the structure, supervisor, constructor)
Follow-up
Approval of Temporary use- Application Form for the Approval of Temporary use
Application date
Contents of the application(Construction size, building-to-land ratio, function of the structure, supervisor, constructor)
Search
Case Name Registration
Procedure DBCase DB
Information Searchby Procedure
Input
Input
1
2
3
4
2
DocumentD B
Document Registrationby Procedures
OPEN
SYS
TEM
of S
EOUL
Mec
hani
sm t
o In
crea
se T
rans
pare
ncy
in A
dmin
istr
atio
n
System Manual Processing
Consultation among related departments and the outcome of the document review
Follow-up
- Approval of Temporary use
Authorization date for temporary use
Contents of the authorization(Construction size, building-to-land ratio, function of the structure, supervisor, constructor)
Consultation among related departments and the outcome of the document review
Follow-up
Approval of use- Application Form for the Approval of use
Application date
Contents of the application(Construction size, building-to-land ratio, function of the structure, supervisor, constructor)
Consultation among related departments and the outcome of the document review
Follow-up
- Approval of use
Authorization date for use
Contents of the authorization(Construction size, building-to-land ratio, function of the structure, supervisor, constructor)
Consultation among related departments and the outcome of the document review
Follow-up
3. Register pertinent information on the database
4. Detailed information search by procedureSearch
Case Name Registration
Procedure DBCase DB
Information Searchby Procedure
Input
Input
1
2
3
4
2
DocumentD B
Document Registrationby Procedures