1 II SEMINARIO BRASIL BELGICA SOBRE HIDROVIAS Carl Heiremans Brasilia - April 2012

Upload: others

Post on 25-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

1

II SEMINARIO BRASIL – BELGICA SOBRE HIDROVIAS Carl Heiremans – Brasilia - April 2012

Page 2: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

2

Topics

1 – Presentation JAN DE NUL Group

2 – Argentina – HIDROVIA SA

A practical example of River Management

3 – Panama 3rd set of locks

Page 3: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

3

COMPANY PROFILE – KEY FACTS

3 Main Activities Dredging and Marine Works

Civil Engineering Works

Environmental Activities

Ultramodern fleet

More than 5,600 Employees

Yearly turnover of 1.8 billion € (R$ 4.3 Bn)

Page 4: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

4

HISTORY

1938 - Jan De Nul: contractor of civil works

1951 - First dredging work

1973 - First project outside Europe

1996 - Envisan joined Jan De Nul Group

2009 - Jan De Nul Group developed into a world leader in the dredging and

offshore industry & civil engineering

Page 5: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

5

PROJECTS 2010

Page 6: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

6

FINANCIAL 2010

Turnover: € 1.8 billion: 18 % Civil Engineering Works

4 % Environmental Activities

78 % Dredging and Marine Works:

Maintenance Dredging (10 %)

Capital Dredging (45 %)

Land Reclamation (14 %)

Offshore (8 %)

Rock Revetment Works (1 %)

Others (22 %)

Page 8: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

8

EQUIPMENT

26 Trailing Suction Hopper Dredgers

14 Cutter Suction Dredgers

5 Backhoe Dredgers

20 Split Hopper Barges

2 Side Stone Dumping Vessel

1 Fall Pipe and Mining Vessel

EXISTING FLEET

Page 9: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

9

EQUIPMENT

NEWBUILDING PROGRAM

The 1.8 billion Euro investment program 2007 – 2011 consisted of 27 vessels

In 2011 a new investment program has started

Page 10: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

10

SUPPORTING SERVICES

Engineering Department

Survey

Logistics & Depot

Workshops & Atelier

Page 11: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

11

PROJECTS BRAZIL

Vila do Conde - PA

Barra do Riacho -ES

Estaleiro e Base Naval – Itaguai - RJ

LLX – Porto Sudeste - RJ

Macaé - RJ

Itajaí - SC

Itaqui - MA

Rio Grande RS

Paranagua - PR

Salvador - BA

Porto do Açu - RS

Vale Tubarão - ES

Embraport – Santos SP

Piçarras - SC

1997-2000 2008-2012

Page 12: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

12

Topics

1 – Presentation JAN DE NUL Group

2 – Argentina - HIDROVIA SA

A practical example of River Management

3 – Panama 3rd set of locks

Page 13: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

13

Hidrovía

Description of the waterway Santa Fe-Océano

Page 14: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

14

Transport Economies and Argentine situation

0.050.15

1.6

3.1

0

0.5

1

1.5

2

2.5

3

3.5

Camion FFCC Fluvial Marítimo

Costo del transporte según medio

U$S/ton.km

12.5% 0.8%

86.7%

Camion FFCC Fluvial

Participación de los distintos medios en

el transporte interno de Argentina

Page 15: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

15

HIDROVIA PARAGUAY - PARANA

Santa Fe –Oceano : 1000 km

Santa Fe – Corrientes :600 km

Corrientes Asunción : 400 km

Corrientes Pto.Iguazú: 700 km

Rio Uruguay : 300 km

Total : 3000 km

Page 16: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

16

CONCESSION CONTRACT

ARGENTINA

RIO PARANA 1995 - 2021

Dredging and maintenance of the Rio de la Plata from the Ocean (Km 205) through the

Canal E. Mitre up the km 584 of the Rio Paraná

2011 : Extension of 600km Inland Navigation from Santa Fe to Corrientes

Ministerio de Economia y Obras y Servicios Publicos

Supervision : Direccion Nacional de Vias Navegables

Equipment : various mid size hopper dredgers (3 to 5) work on 365/7/24.

Additionaly a Cutter Suction Dredge is used for the periodic maintenance of large

sedimentation traps in the Mitre Channel

4 Bouy tenders and more than 8 survey vessels

More than 1000 bouys and other signals are installed in the seagoing section

TOLL system implemented on the seagoing section (Santa Fe to the Ocean)

Page 17: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

17

50 % JDN Group = Dredging

50 % Emepa (Local Partner) =

Buoys and Beacons

Page 18: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

18

More then 70% of all Agro products

exported in Argentina are moved by

ship trough the Hidrovia concession

100% of Buenos Aires container traffic

uses the system

Page 19: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

19

TOLL SYSTEM

Toll is in function of TRN of vessel, section

of river used, and draught offered:

T.P. = Dredging toll + Beaconing toll

1. T.b. = U$ tariff x TRN x % of channel

used (see table for beaconing)

2. T.d.= U$ tariff x TRN x % of channel

used (see table for dredging) x

Correction Factor for Draught.

(indicative: grain vessels pay +/- 1 USD/ton)

Page 20: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

20

RESULTS OF CONCESSION

Guaranteed depth = safety = lower costs, better and more modern vessels

Fixture of transport prices is very stable, being independent of river waterlevels in rain

seasons

Better prices for producers because spending less in transport and at better price

levels

Impressive private investment in infrastructure (multi billion)

Crushing factories (largest capacity of the world)

Grain Loading terminals

Investment in riverbarges and adapted terminals

Expansion of economical feasible area for agriculture production

Capture of more goods transported from upriver (up to Brasil)

BUT:

Need for a strong and stable legal regulation !

Toll system is not always feasible if in competition with other subsidized systems

Page 21: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

21

Topics

1 – Presentation JAN DE NUL Group

2 – Argentina – HIDROVIA SA

A practical example of River Management

3 – Panama 3rd set of locks

Page 22: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

22

Ivoz-Ramet

CONSTRUCTION OF LOCKS

JAN DE NUL has been involved in the

construction of the most important

locks in Belgium

Thanks to these experiences JAN DE

NUL was a suitable partner for the

construction of the 3rd set of locks in

Panama

Evergem – Seine Scheldt

Antwerp – Berendrecht lock (world largest !)

Page 23: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

23

Panama Canal Expansion

Program

1.Dredging works for Atlantic

and Pacific entrance

(deepening and widening)

2. Deepening and widening of

existing canal (Culebra cut and

by-pass Pedro Miguel).

3.Construction of 3rd set of

locks (Atlantic and Pacific).

4.Deepening and widening of

canal on Gatun Lake.

Page 24: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

24

History

1st and 2nd set of locks 3 locks at each end of teh Panamacanal

Pacific : Miraflores locks (2 steps) and Pedro Miguel

locks (1 step).

Atlantic : Gatun locks (3 steps).

Page 25: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

25

WHY A 3rd SET OF LOCKS?

Other alternatives for capacity increase came to their limits Larger vessels can not enter in the existing locks

Optimization of the toll system have reached their limit

Page 26: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

26

DOEL VAN DE UITBREIDING

Page 27: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

27

JAN DE NUL INVOLVEMENT IN PANAMA CANAL EXPANSION

1) DEEPENING OF THE “GAILLARD CUT”

2) PACIFIC ENTRANCE ACCESS CHANNEL

3) ATLANTIC ACCESS CHANNEL DREDGING

4) DESIGN AND BUILD OF 3rd SET OF LOCKS

Page 28: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

28

DEEPENING OF GAILLARD CUT – CHARTER OF BACKHOE

DREDGER

April 2007 – April 2010 CHARTER of Backhoe Dredge “Il Principe” and 2

barges for

Drilling & Blasting – ACP

Removal of blasted material: ACP – JDN

Equipment:

– BHD “Il Principe” – Liebherr 995 + Barges

– Rialto Christensen + Barges

Page 29: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

29

Description and reach: • Deepening from 27.5m to 9.14m PLD • Channel width: 218m • Length: 1.6km • Approximate dredging volume: 4M

m3

• Awarded to: Jan De Nul • Awarded: 16 August 2010 • Completion: 13 November 2012

PENAC : Pacific Entrance Access Channel

Page 30: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

30

PENAC

Page 31: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

31

Width: 225m (740´) ▶

•Widening: from 198 m to

225 m (navigational channel)

•Channel width to 218 m (North

Access Channel)

New Post-Panamax

turning area

17.4 M m3 dredged / 17.66 M m3

Contract scope: 17.66 M m3

Awarded: 25 September 2009

Company: Jan de Nul n.v.

End of contract: 27 February 2012

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Actual 97%

ATLANTIC DREDGING

Page 32: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

32

3rd Set of Locks Capacity

THE NEW LOCKS WILL BE ABLE TO HANDLE SHIPS WITH A

CAPACITY OF 12,000 TEU´S MAXIMUM ESTIMATED SHIP SIZE:

49 METERS WIDE

366 METERS LONG

15 METERS OF DRAFT

THE CANAL WILL BE ABLE TO OPERATE NORMALLY DURING THE

EXECUTION OF THE THIRD SET OF LOCKS PROJECT. Design and

Built of the New Third Set of Locks – awarded to GUpC

Page 33: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

33

Page 34: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

34

Design and build of the New Third set of Locks

3,2 billion US$

Design & build

Awarded to

GUPC - Consortium (Grupo Unido Por el Canal) Impregilo

Sacyr

JDN

Cusa

Page 35: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

35

Construction period : 65 months

40.000.000 m³ dry excavation

20.000.000 m³ landfills

10.000.000 m³ dredging works

5.200.000 m³ concrete

300.000 ton reinforcement steel

16 steel lock doors – 45.000 ton

130 valves – 15.000 ton steel + 130 hydraulic pistons

Workforce : 7.000 man

QUANTITIES – MAIN DATA

Page 36: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

36

BOUW VAN DE NIEUWE SLUIZEN

Page 37: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

37

Existing Locks New Locks

Wate

r U

tiliz

ation

WSB 1 WSB 2 WSB 3

With the water saving basins the

new locks will use 7% less water

than the existing locks in every

transit

Page 38: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

38

Water Saving Basins The new locks will have three basins

per chamber that will use 60% less

water than locks without basins

Page 39: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

39

ESCLUSAS GATUN

NUEVAS OBRAS OCEANO ATLANTICO

LAGO GATUN

Atlantic – existing situation

Page 40: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

40

Atlantic site – new situation

Page 41: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

41

Page 42: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

43

Page 43: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

44

Pacific site – existing situation

Page 44: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

45

Pacific site – new situation

Page 45: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

46

Page 46: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

47

Testing the operation of 2

new caissons in Gatun

Spillway.

Testing 4 prototype

cylinders

in 2 tanks

2 newly manufactured

vertical rolling gates

1 prototype cylinder test

concluded

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Actual

• 7 Gates Modified and installed

• 0 Gates under extension work

• 2 Extended Gates ready and available to be installed

• 2 New Stone Gates under adjustments to be installed

6%

Page 47: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

48 Newly manufactured vertical rolling gates

Gate installation

Page 48: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

49

Page 49: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

50 LOCK HEAD FLOOR

INTERMEDIATE FLOOR

SMALL RECESS BACK WALL

MACHINERY

ROOM

MAIN RECESS

Approach Structures

Lock Walls

Lock Heads

Civil/Structure Overview

CONSTRUCTION OF NEW LOCKS

Page 50: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

51

Culvert Valve Typical Culvert

Valve Arrangement

Valves Overview

CONSTRUCTION OF NEW LOCKS

Page 51: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

52

Concrete works on the door recess

Page 52: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

53

Concrete works on the main lock walls

Page 53: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

54

Transport and installation of the 16 lock doors

Page 54: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

55

FLOODING OF THE LOCKS

Page 55: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

56

DREDGING WORKS AT THE ENTRANCES

Page 56: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

57

Page 57: II SEMINARIO BRASIL BELGICA SOBRE HIDROVIASportal.antaq.gov.br/wp-content/uploads/2016/12/... · 3 – Panama 3rd set of locks ... 1996 - Envisan joined Jan De Nul Group ... 300.000

OFFICE JAN DE NUL N.V. Tragel 60 I 9308 HOFSTADE-AALST I Belgium

T +32 53 73 17 11 I F +32 53 78 17 60

[email protected]

www.jandenul.com

58