![Page 1: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/1.jpg)
1
![Page 2: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/2.jpg)
2 IGP Forecast Assumptions Working Group
May 22, 2019, 8:30 am to 3:00 pm
Time Perspectives Speaker Organization
Welcome and Introductions 8:30 am - 8:55 am Joanne Ide Hawaiian Electric
Paul De Martini Newport Consulting Group
Distributed Energy Resources 8:55 am - 9:45 am Customer Keith Yamanaka US Army Garrison-Hawai‘i
Tracy Tonaki DR Horton Schuler Homes Hawai‘i
Kevin Chock RHA Energy Partners
9:50 am - 10:40 am Policy/Consultancy Benjamin Sigrin NREL
Thomas Maslin IHS Markit
Marc Asano Hawaiian Electric
Dennis Lee Hawaiian Electric
10:40 am - 10:50 am
10:50 am - 11:40 am Industry Chris DeBone Hawaii Energy Connection
Marco Mangelsdorf ProVision Solar, Inc.
Robert Harris Sunrun
Break for Lunch 11:40 am - 12:10 pm
10 Minute Break
Lunch - 30 Minutes
![Page 3: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/3.jpg)
3 IGP Forecast Assumptions Working Group May 22, 2019, 8:30 am to 3:00 pm
Time Perspectives Speaker Organization
Break for Lunch 11:40 am - 12:10 pm
Distributed Energy Resources 12:10 pm - 1:00 pm Program Administrator Ian Morikawa Hawaiian Electric
Gregg Kresge Maui Electric
Sue Lee Hawai‘i Electric Light
Electrification of Transportation1:00 pm - 1:55 pm Customer Roger Morton Oahu Transit Service
Dan Ahuna Roberts Hawaii
Rob Mora Lyft
1:55 pm - 2:05 pm
2:05 pm - 2:45 pm Industry Kurt Speas Tony Nissan
Amber Stone Aloha Charge
Wrap up 2:45 pm - 3:00 pm Joanne Ide
10 Minute Break
Lunch - 30 Minutes
![Page 4: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/4.jpg)
Our forecast is developed in layers. 4
Energy Efficiency
Underlying Sales Forecast at Forecast Customer Level
Distributed Electrification Energy of
Resources Transportation
Forecast will be further modified by demand response (DR) and controllable DER.
Illustrative Example
![Page 5: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/5.jpg)
FAWG – Composition 5
Core Group
DER Experts
Energy Efficiency
Experts
EoT Experts
Economy Experts
![Page 6: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/6.jpg)
6 IGP Forecast Assumptions Working Group
May 22, 2019, 8:30 am to 3:00 pm
Time Perspectives Speaker Organization
Welcome and Introductions 8:30 am - 8:55 am Joanne Ide Hawaiian Electric
Paul De Martini Newport Consulting Group
Distributed Energy Resources 8:55 am - 9:45 am Customer Keith Yamanaka US Army Garrison-Hawai‘i
Tracy Tonaki DR Horton Schuler Homes Hawai‘i
Kevin Chock RHA Energy Partners
9:50 am - 10:40 am Policy/Consultancy Benjamin Sigrin NREL
Thomas Maslin IHS Markit
Marc Asano Hawaiian Electric
Dennis Lee Hawaiian Electric
10:40 am - 10:50 am
10:50 am - 11:40 am Industry Chris DeBone Hawaii Energy Connection
Marco Mangelsdorf ProVision Solar, Inc.
Robert Harris Sunrun
Break for Lunch 11:40 am - 12:10 pm
10 Minute Break
Lunch - 30 Minutes
![Page 7: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/7.jpg)
7 IGP Forecast Assumptions Working Group May 22, 2019, 8:30 am to 3:00 pm
Time Perspectives Speaker Organization
Break for Lunch 11:40 am - 12:10 pm
Distributed Energy Resources 12:10 pm - 1:00 pm Program Administrator Ian Morikawa Hawaiian Electric
Gregg Kresge Maui Electric
Sue Lee Hawai‘i Electric Light
Electrification of Transportation1:00 pm - 1:55 pm Customer Roger Morton Oahu Transit Service
Dan Ahuna Roberts Hawaii
Rob Mora Lyft
1:55 pm - 2:05 pm
2:05 pm - 2:45 pm Industry Kurt Speas Tony Nissan
Amber Stone Aloha Charge
Wrap up 2:45 pm - 3:00 pm Joanne Ide
10 Minute Break
Lunch - 30 Minutes
![Page 8: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/8.jpg)
![Page 9: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/9.jpg)
Next Steps 9
Economic Outlook Meetings
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2019 2020
Assemble Working Group
Kick-Off Meeting March 13
Panel Discussion on DER, EE, EoT
May 22 and 23
Forecast Methods
Assumptions, Sensitivities & Scenarios Review
Preliminary Forecast
Finalize Forecast
Update Forecast as Needed
![Page 10: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/10.jpg)
10 IGP Forecast Assumptions Working Group
May 23, 2019, 8:30 am to 2:00 pm
Time Perspectives Speaker Organization
Welcome and Introductions 8:30 am - 8:55 am Joanne Ide Hawaiian Electric
Paul De Martini Newport Consulting Group
Electrification of Transportation 8:55 am - 9:55 am Policy/Consultancy Matteo Muratori National Renewable Energy Laboratory
Thomas Maslin IHS Markit
Jimmy Yao Hawaiian Electric
Energy Efficiency 9:55 am - 10:45 am Customer Keith Yamanaka US Army Garrison-Hawaii
Richard Chinen KTA Super Stores
Grant Chun Hale Mahaolu
10:45 am - 10:55 am
10:55 am - 12:00 pm Program Admin/Design Caroline Carl Hawai‘i Energy
Ramsey Brown Hawai‘i Energy
Ted Pope 2050 Partners
Gwen Yamamoto-Lau Hawai‘i Green Infrastructure Authority
Break for Lunch 12:00 pm - 12:30 pm
10 Minute Break
Lunch - 30 Minutes
![Page 11: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/11.jpg)
11 IGP Forecast Assumptions Working Group May 23, 2019, 8:30 am to 2:00 pm
Time Perspectives Speaker Organization
Break for Lunch 12:00 pm - 12:30 pm
Energy Efficiency / Demand Response 12:30 pm - 1:30 pm Policy/Consultancy Yoh Kawanami Hawaiian Electric
Yvette Maskrey Honeywell Smart Grid Solutions
Ingrid Rohmund Applied Energy Group
Q&A
Electrification of Transportation 1:35 pm - 1:50 pm Policy/Consultancy Matteo Muratori National Renewable Energy Laboratory
Wrap up 1:50 pm - 2:00 pm Joanne Ide Hawaiian Electric
Lunch - 30 Minutes
![Page 12: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/12.jpg)
12
![Page 13: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/13.jpg)
Trends and Barriers to DER Deployments
Ben Sigrin, Paritosh Das, Sam Koebrich,Kevin McCabe, Ashwin Ramdas
5/22/19
![Page 14: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/14.jpg)
NREL | 2
NREL at a Glance
1,700 $40National economic 0impact M annually
Approximate Operating
Budget
Employees, plus
early-ca4 m
0ore
0 than
reer researchers and visiting scientists
750nearly
\
Partnerships with industry, academia, and
government
National econom ic im pact
World-class facilities, renowned technology experts
Campus campus operates
as a living laboratory
![Page 15: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/15.jpg)
What role do DERs play in a modern power system?
Our group’s research focuses on understanding the role of DERs in the power system, forecasting their adoption, and understanding customer behavior.
We develop the dGen model, a capacity expansion model for DERs. We have been involved in several institutional resource planning and renewable integration studies.
dGen is a spatial agent-based model that develops a unique profile for each customer in the territory to simulate their behavior. NREL | 3
![Page 16: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/16.jpg)
Long-Term Trends in Renewable Energy
NREL forecasts that wind, solar, and storage prices will continue to decline, resulting in substantial deployment by 2050.
The forecasts are uncertain and sensitive to several factors, including RE costs, natural gas prices, and enacted policies. In particular, RE deployment is enabled by continued storage cost declines.
Sources: NREL 2018 Annual Technology Baseline, NREL 2018 Standard Scenarios, SunShot 2030 report NREL | 4
![Page 17: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/17.jpg)
What motivates adoption of DERs?
Favorable economics appear to be the primary factor influencing consumer adoption of DERs. 78% of PV adopters said that lowering electricity costs was “extremely important” in their adoption decision.
Other factors that influence adoption include:
• Social influence from peers • Values and beliefs about tech. • Electrification of new loads
Sources: Sigrin et al 2014; Moezzi et al. 2016 NREL | 5
![Page 18: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/18.jpg)
Barriers to high renewable penetration
• Curtailment of renewable generation
• System inertia
• Distribution grid limits and associated costs
• Modernizing rate design
• Land use and social acceptance
• Ensuring equitable access for all Increased system flexibility is key to reaching high levels of RE
penetration, and still may result in curtailment Denholm et al. 2016 NREL | 6
![Page 19: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/19.jpg)
Thank you
http://www.nrel.gov/analysis/dgen/ https://www.nrel.gov/solar/seeds/
www.nrel.gov
![Page 20: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/20.jpg)
Rate Design
May 22, 2019
![Page 21: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/21.jpg)
2 2
Factors Considered in Rate Design
Provision of fair and equitable rates Simplicity, ease of understanding, and ease of implementation Encouragement of customer load management Among other factors
![Page 22: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/22.jpg)
3 3
Rate Design Guidance
“Unbundled” rate structures Capacity-based, fixed cost-based pricing Time-of-use and dynamic pricing structures New incentives to reduce curtailment of renewable energy Supplemental power supply pricing structure
![Page 23: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/23.jpg)
4 4
Recent Activity
Separation of fuel and purchased energy from base rates Demand Charges Customer Charges Minimum Charges Commercial Time-of-Use Rates – Encourage mid-day usage – Discourage on-peak usage
![Page 24: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/24.jpg)
5 5
Advanced Rate Design Strategy
Grid Modernization will enable more responsive time-variant rate designs and more practical widespread adoption of advanced rate designs Commission order: File by September 25, 2019 Minimum requirements: Summary of rate design efforts to date, including best practices; low income; enrollment mechanism; implementation; monitoring and validation; complement to the data access & privacy policy
![Page 25: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/25.jpg)
6 6
Takeaways
AMI will enable advanced rate designs Advanced Rate Design Strategy that will include stakeholder engagement
![Page 26: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/26.jpg)
Hawaii’s EV Charging Experts
HECO Forecast Working GroupMay 2019Amber StoneVP of Business Development
![Page 27: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/27.jpg)
WHO IS ALOHA CHARGE?
Our goal is simple.Going green is critical to Hawaii’s future. We want to do our part. Therefore, our goal is making the transition to electric vehicles as easy possible for both EV car buyers and station owners.
![Page 28: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/28.jpg)
WHO IS ALOHA CHARGE?
Our goal is simple.Going green is critical to Hawaii’s future. We want to do our part. Therefore, our goal is making the transition to electric vehicles as easy possible for both EV car buyers and station owners.
We achieve this by offering top quality EV charging products at reasonable prices with unparalleled LOCAL service. Aloha Charge is the Hawaii's leading distributor of electric vehicle charging equipment and installation services.
![Page 29: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/29.jpg)
SO HOW IS THE EV INDUSTRY REALLY DOING?
![Page 30: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/30.jpg)
U.S. ELECTRIC VEHICLE SALES INCREASED BY 81% IN 2018
![Page 31: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/31.jpg)
THERE WERE 361,307 ELECTRIC CARS SOLID IN THE U.S. IN 2018.
![Page 32: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/32.jpg)
THERE ARE OVER 50 DIFFERENT EV CARS CURRENTLY AVAILABLE.
EVERY AUTOMAKER HAS AT LEAST ONE EV IN THE WORKS.
![Page 33: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/33.jpg)
AND SEVERAL NEW CAR COMPANIES HAVE LAUNCHED –EXCLUSIVELY WITH ELECTRIC VEHICLES.
![Page 34: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/34.jpg)
BUT WHAT ABOUT HAWAI’I?
![Page 35: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/35.jpg)
HAWAI’I HAS THE HIGHEST DEPENDENCY ON FOSSIL FUELS IN THE NATION.
POLLUTION CONTINUES TO BE A HUGE CHALLENGE.
![Page 36: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/36.jpg)
HAWAI’I HAS THE SECOND HIGHEST PER CAPITA EV ADOPTION RATE IN THE UNITED STATES – AND GROWING FAST.
![Page 37: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/37.jpg)
HAWAI’I HAS ~9,100 EVS ON THE ROAD
![Page 38: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/38.jpg)
HOWEVER, THERE ARE ONLY 516 PUBLIC CHARGING STATIONS.
![Page 39: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/39.jpg)
OUR GOAL: To close the gap.
![Page 40: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/40.jpg)
OUR GOAL: To close the gap.
… and help the entire state run on 100% renewable energy by 2045.
![Page 41: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/41.jpg)
OUR GOAL: To close the gap.
… and help the entire staterun on 100% renewable energy by 2045.
But how do we do that?
![Page 42: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/42.jpg)
EV CHARGING SOLUTIONS FOR EVERY
APPLICATION
• Level 1, Level 2 or DC Fast Charging
• Residential or Commercial
• Offices, Retail, Parking, Multi-family
![Page 43: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/43.jpg)
GOVERNMENT ASSITANCE
•HB 1585: Established a rebate program for installation of EV Charging systems.○ $300k in 2019-2020 & $500K in 2020-2021○ PUC 3rd party designation - cover hardware, cover
infrastructure upgrade?• SB 1000: Requiring any new development (MFD more than
10 stalls, Commercial more than 20 stalls) to be pre-wired for EV Install○ Really important for future proofing
![Page 44: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/44.jpg)
PRIVATE FUNDING DRIVERES
•HAWAII ENERGY AND ULUPONO REBATE PROGRAM○ Workplace & MFD○ $5k new install, $1,500 R&R single to dual port
• RETAIL○ Aloha Charge poll: over 700 people polled, 81% said
they were more loyal to businesses with EV Charging• MFD
○ Increase in overall property value
![Page 45: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/45.jpg)
HOW HAWAII ELECTRIC COMPANIES HELP?
MFD Biggest Challenge Infrastructure Upgrade- Load Studies- Assistance setting up dedicated EV Charging panels
Commercial- Best location- Infrastructure upgrade
![Page 46: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/46.jpg)
MOST IMPORTANTLY... KEEP THE CONVERSATION GOING
![Page 47: IGP Forecast Assumptions Working Group - Hawaiian Electric · 5/22/2019 · IGP Forecast Assumptions Working Group 2 May 22, 2019, 8:30 am to 3:00 pm Time Perspectives Speaker Organization](https://reader035.vdocuments.us/reader035/viewer/2022062603/5f13d21f26116679174612fc/html5/thumbnails/47.jpg)
Hawaii’s EV Charging Experts
Mahalo!