igcdp management
DESCRIPTION
TRANSCRIPT
iGCDP management
Why summer peak?
Clusters overview
TOP GROWTH POTENTIAL
AN, NP, PA, TO GE, TN, NF, MI, CT, TS
PV, R3, BA, RS, FE, VE, PD, BO
70 40 20
2 projects in 2 waves 2 projects 1 project
Done basing on the winter peak results
RA MA RE
Impossible?
More than possible!!!
POTENTIAL cluster
PM
TM RA TM RA TM RA
TM RE TM RE
TM MA TM MA
GROWTH cluster
PM
TM RA TM RA TM RA
TM RE TM RE
TM MA TM MA
PM
TM RA TM RA TM RA
TM RE TM RE
TM MA TM MA
TOP cluster
PM
TM RA TM RA TM RA
TM RE TM RE
TM MA TM MA
PM
TM RA TM RA TM RA
TM RE TM RE
TM MA TM MA
Coordinator positions: IR coordinator, sales (GR) coordinator, reception coordinator.
Job Description: level 1 and level 2Level
1Raiser: Market research, sales,
account management
Matcher: international
relations, Selection, Delivery
Realizer: hosting families, cultural
program, EP LEAD Delivery
Level 2
Finance: Budget tracking and cost
cutting
Marketing: showcasing, events,
etc
CEM: NPS management, fire
fighting
RecommendationProject Based Structure for POTENTIAL and GROWTH clusters
• Why? Volume doesn’t require process division plus members experience, specialization still can happen
For TOP cluster Process Based Structure can be implemented
• Why? Facilitates high volume management having experts, area gets to the level of having constant RA-MA-RE, facilitating often realizations
POTENTIAL
• Focus on national projects.• TN taker based projects.• Sales as a main attract-covert-close for financial
sustainability.• 1-to-1 matching.• EP LEAD implementation.• Safety Standards Satisfaction delivery.• Establishment of exchange culture in the LC.• TN takers and LC network as a main source of hosting
families.
Special message: Be Simple, Be Fast and Be Focused.
GROWTH
• Small local projects can be, but focus on big national projects.• TN taker based projects preferred.• B2B marketing for TN takers.• LC2LC for matching. • International marketing.• Financial management, economies of scale.• Marketing for conversion for hosting families.• Exchange culture development.• Customer loyalty for students and fire-fighting.• Customer loyaty for organizations.• Media relations and events .• Management and leadership.
Special message: Be Innovative and Listen to Customers.
TOP
• Big local and national projects.• Event-based and TN-taker based projects.• LC2LC for matching preferred.• Government relations.• Sponsors and in-kind partners and B2B for them.• Learning partners.• External support in exchange delivery (reception,
education).• Strategic planning. • Showcasing as a focus.
Special message: Think Big, Act Big, Be BIG.
Da hell is SUMMER PEAK?
Wanna know the MC goal?
Summer preparation timeline
Preview of summer products
TN taker segment/Issue
Cultural understanding(Cross cultural
learning dialogs)Economic growth
Cultural understanding (Protect and
showcase local traditions)
Summer camps, kids campsThird sector
Tourism sector (hotels, touristic
agencies and sights,
municipalities)
Planning sales
8 calls 4 meetings 1 TN taker RA
Case #1
• Divide into clusters.• Receive a cluster task.• What would you do?
Cluster allocation• TOP: AN, NP, PA, TO• GROWTH: GE, TN, NF, MI, CT, TS• POTENTIAL: PV, R3, BA, RS, FE, VE, PD, BO
Planning matching
3 interviews 1 TN MA
Matching optimization
• Personal contacts from both LCP and LC VP sides, official LC2LC;
• LC wikis and booklets to strengthen positioning;• Simple matching process: application – interview – match.
Don’t overcomplicate! ;• Selling profiles you can deliver with a big scale of operations!
(for example, can you match 70 people with Italian?)
Planning hosting families
Main targets are:
• students; • families with school kids; • old families; • young families (without kids or with kids up to primary school age).
Conversion rate of HF
5 applications 1 host RA
Case #2
• Divide into clusters.• Receive a cluster task.• What would you do?
Cluster allocation• TOP: AN, NP, PA, TO• GROWTH: GE, TN, NF, MI, CT, TS• POTENTIAL: PV, R3, BA, RS, FE, VE, PD, BO
Porca troia, interns are coming!
• Integration (cultural and professional, integration to the LC);
• Communication (feedback, team meetings, facebook group/email group, buddies)
• Education (TtT, hard skills, AIESEC understanding);• Fire-fighting;• EP LEAD;• Safety, Standards, Satisfaction.
iGCDP standards
Global:• Reception wiki;• Pick-up;• Shipping costs;• Buddy;• Insurance
(coming soon).
National:• Accommodation;• Logistical support;• Welcome package (map,
safety and integration booklet);
• EP LEAD (once released).
Case #3
• Divide into clusters.• Receive a cluster task.• What would you do?
Cluster allocation• TOP: AN, NP, PA, TO• GROWTH: GE, TN, NF, MI, CT, TS• POTENTIAL: PV, R3, BA, RS, FE, VE, PD, BO
Planning local summer peak
RA MA RE85% 90%
numbers
Planning local summer peak
• Evaluate your past experience in iGCDP (what projects brought results and quality, HR trends, TN taker segments, relevance of JDs);
• Understand your local market (issue, potential TN taker segments, local, regional and national trends, activities of companies, government, third sector);
• Understand your supply and demand (which countries to invest in, potential for LC2LC, profiles you can really bring);
• Understand your HF market (who, how, when);
Planning local summer peak
• Project flow is 6 months;• Selling and raising period should be maximum 2 months.
Market research and education should not take more than 1 week;
• Matching period should be optimally 1 month;• After matching should be planned 1 month of Delivery period
for interns to prepare visa and buy tickets (otherwise only rich and non-visa interns can come) and to raise hosting families, prepare JDs and working plans of interns, organize reception.
• Plan realization from the middle of June on as before the world has exams.
To do list• Making sure that area is planned properly (not only RA-MA-
RE, but also sales, interviews, initiatives for them, reception preparation, events, showcasing, finance, HR structures, EP LEAD);
• Tracking of all the processes;• Giving guidelines in creation of strategies and initiatives;• Facilitating synergies with marketing/PR, TM, Finance;• Education about general management;• Tracking department management initiatives (coaching
meetings with PMs, area meetings, meetings with interns, etc);
• Supporting mentally.
Not to do list
• Over pressure;• Leave alone with strategies, initiatives and management;• Leave alone with legalities and finance;• Take for granted that he/she knows how to plan and track
properly, that he/she can analyze, create strategies and initiatives.