ifla 2011 satellite meeting -- b ildi & buildings ... · ifla 2011 satellite meeting --b ildi...

38
IFLA 2011 Satellite Meeting -- B ildi & Buildings & Equipment / IT Integrating Automation Plans into Automation Plans into Facilities Planning – Implications and S i Synergies Tom Pinkin Sales & Business Development mk Sorting Systems, Inc.

Upload: others

Post on 24-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT

Integrating Automation Plans into Automation Plans into Facilities Planning –Implications and S iSynergies

Tom PinkinSales & Business Development mk Sorting Systems, Inc.

Page 2: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

The GoalIFLA 2011 Satellite Meeting

The Goal Provide better skills for planning and

accommodating present or future automationE d ti di th Expand your perspective regarding the inter-relationship between patron self service and streamlined circulation service and streamlined circulation workflow

Increase the chances of a cost effective Increase the chances of a cost effective and productive solution

Page 3: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Why Automate? Accuracy Less injury – lifting/repetitive motionj y g p 24/7 availability Compress touches p Faster turnaround Ability to handle volume y

fluctuation/growth without staff increase

Page 4: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Why self service? Patrons already adapted to model Privacyy Faster turnaround Adapts to diverse populationp p p Frees up skilled staff to consult one-on-one Can be portable, adapts to shiftsC p , p

Page 5: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

Library WorkflowIFLA 2011 Satellite Meeting

Library Workflow Access control/Authentication Asset tagging and Identification Materials Tracking

R t Returns ILL/Transit Check-out / Check-in Check out / Check in Sorting Technical Services / New materials Supply Chain Management

Page 6: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Material Identification Barcode

Electromagnetic (EM) security RF tag security

RFID Tag only combined ID/Security EM security combination

Page 7: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Self Checks Check-out Check-in Adapted Built-In Pedestal

Page 8: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Staff Workstations Check-in Check-out Patron Administration Patron Administration Material Management (ILS) Tagging Backroom Processing Adapted Built In Built In

Page 9: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Security Gates Proximity to adjacent equipment

Min. 2-3’ (1 meter) separation, over creates dead zonesdead zones

Proximity to complete loop frames Antenna interference Antenna interference

Proximity to door swing and ADA access Allow clear wheelchair access as well as

clear door swing

Page 10: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Security Gates EM RF RFID Hybridy

Page 11: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Material Return Conventional Bookdrop RFID Smart Bookdropp

Page 12: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sorting Manual Minimal Automated

Sweep Pop-up Roller Transfer

Page 13: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Dispensing Vending Robotic Mini-load

Page 14: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Transport Conveyors Inclines/declines Elevators Lifts Monorail

Page 15: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Storage/Archival Automate storage &

retrieval system (AS/RS) – long term high density storage of reserve archival of reserve, archival or rare collections

Page 16: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Design Planning Time invested up front in planning reaps

greater returns in the outcome Outcome is equal to or greater than the

expectations The Library understands all of the

determinants

Page 17: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Traffic Considerations Mapping material flow

Material entering library Movement during workflow process Movement leaving the library

Mapping patron flow Entering/leaving Drive-by/drop-off

Page 18: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

S C id ti

IFLA 2011 Satellite Meeting

Space Considerations Structural

Floor loading Interferences/restrictions

Utility access connections Power / Data

Access/Egress Proximity

RFID/RF/EM interferences

Page 19: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Building Considerations Structural Fire – National, local ADA – access, vision, hearing Utilities Aesthetics

Page 20: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Installation Considerations Delivery Points

Truck / materials / packaging Access

Floor to floor Hallway / entry Work areas

Page 21: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sizing / Configuration General Rules Self Checks Sorting Systems Dispensing Systemsp g y

Page 22: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sizing - General Rules Analyze material, patron & staff traffic patterns

Interior and exterior Transit materials Proximity of self-service to staff Choke points

Determine people & material volumes Allow for serviceability

Page 23: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Self Checks Determine amount of self service Determine locations

Proximity to staff Use and location proximityC id ti f t i Consideration of patron privacy Proximity & orientation

Allowances for task circumstances Allowances for task circumstances

Page 24: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Self Checks Balancing queues

Centralized locationDi t ib t d l ti Distributed location

Over/under utilization 1 self check per 50-75K circulation average 1 self check per 50 75K circulation average

Patron staging provisions Check-in & check-out Check in & check out

Page 25: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Self Checks Determine type

Custom built into millwork Built into wall Free-standing kiosk

Typical sizing 2’x2’ (600 x 600 mm) to 3’x2’ (900 x 600 mm) dependant upon counter

i i d iprovisions and accessories

Page 26: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

S ti S t

IFLA 2011 Satellite Meeting

Sorting Systems Determine inputs and volumesp

Place automation closest to greatest input Minimize transport when possible

Define adjacent space requirements Workroom needs

St i d Staging needs Meeting fire code requirements

Fire suppression Fire suppression Fire restriction

Page 27: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sorting Systems Determine current and future capacity needs

Systems will last 10-15+ years Approximate system sizing

May vary by vendor As many sort points as library can afford or fit Enough inputs to prevent excess wait lines Single side vs double side sort Single side vs. double side sort Widths from 4’ to 8’ (1200-1800 mm) overall

Page 28: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sorting Systems Visibility to patrons –

creating visual identity and patron buy-in, point of interest

Page 29: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sorting Systems Typical sizes by library circulation

100 - 300K 1-5 bins 301 - 500K 5-9 bins 501 - 800K 7-11 bins 801K 1MM 9 15 bins 801K – 1MM 9-15 bins

Depends on collection container Bin Tote stacking cart Bin, Tote, stacking cart

Page 30: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Sorting Systems Front end sizing affected by configuration

Merges EM or multiple ID requirements Staff return Singulating Singulating

Collector sizing Larger vs smaller collectors Larger vs. smaller collectors Room for changeover

Page 31: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Page 32: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Page 33: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Page 34: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

Dispensing Systems Sizing dependent upon use Sizing dependent upon use

Only dispense Dispense & return Dispense & return

Sizing dependent upon contents Type/size of lending materialsyp / g

Sizing dependent upon staging method Storage container Tray

Page 35: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Dispensing Systems Allowance for access

Installation Replenishment Service

Load requirements with dead loads Utility access

Page 36: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Page 37: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Page 38: IFLA 2011 Satellite Meeting -- B ildi & Buildings ... · IFLA 2011 Satellite Meeting --B ildi & Buildings & Equipment / IT Integrating Automation Plans into Facilities Planning –

IFLA 2011 Satellite Meeting

Design recommendations Work closely with vendors in sizing system Look at library’s longer term needsy g Consider impact on entire workflow