ifb-16-hhl-010 - dhhl. · pdf filekealakehe, north kona, hawaii 7 february, 2016 ... highway...
TRANSCRIPT
OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
Expires 4/30/16
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
7February,
2016
APPROVED:
TS-1.1
Title Sheet & Index To Drawings
LTB
LTBLTB
LTB/MMT
VICINITY MAP
CONSULTANTS:b+k design group, llc
16-643 KIPIMANA STREET, SUITE 12, KEA'AU, HAWAI'I 96749 PHONE: 808.969.9533 / FAX: 808.969.9534
LANDSCAPE ARCHITECT
STATE OF HAWAI'I DEPARTMENT OF HAWAIIAN HOME LANDS
IFB-16-HHL-010
VILLAGES OF LA'I 'OPUABRUSH CLEARING & MAINTENANCE
ISLAND OF HAWAII
TS-1.1 TITLE SHEET & INDEX TO DRAWINGSTS-1.2 SPECIAL CONDITIONS NOTES
L-1.1 BRUSH CLEARING PLAN - AUPAKA PRESERVE BOUNDARYL-1.2 BRUSH CLEARING PLAN - UHIUHI PRESERVE & VILLAGE 2, 3, AND 4 BOUNDARIESL-1.3 BRUSH CLEARING PLAN - VILLAGE 3 & PROPOSED VILLAGE 2 BOUNDARYL-1.4 BRUSH CLEARING PLAN - VILLAGE 4 & UHIUHI PRESERVE BOUNDARYL-1.5 BRUSH CLEARING PLAN - VILLAGE 5 & AUPAKA PRESERVE BOUNDARY
KEALAKEHE, NORTH KONA, HAWAIIT.M.K. (3) 7-4-021:005,006,010,011,012,015,016
1
Parkway
Village 9 Hospital
Aupaka Preserve
Archaeological Preserve
Village 2 (Proposed)
Kealakehe High School
Village 11
Village 6
Village Center
Park
Village 4 (Under Construction)
Village 1 (Proposed)
Park
Reservoir
Puohulihuli
Kealakehe
Village 10
Queen Ka'ahum
anu Highway
Uhiuhi Preserve
Village 1 (Proposed)
Village 3 (Existing)
Village 5 (Existing)
Ane KeahokaloleHighway
StreetKeanalehu
Drive
Lot B-1
Lot 10-A
Lot 10
Lot B
Lot B-2
Manaw
aleaStreet
Former Proposed Golf Course (DLNR)
Commercial
Commercial
ORIENTATION MAP LEGEND
PLANT PRESERVE
MINI PRESERVE
Lesser Aupaka Preserve
NOT TO SCALE
19
130
130
11
200
19
250
190
19
130
11
11
132
137
HONOKA'A
HILO
PAHOA
KEA'AU
PAPAIKOU
KAWAIHAE
KONA
HAPUNA
HAWAI'I
KOHALA
WAIMEA
MILOLI'I
NA'ALEHU
VOLCANO
KALAPANA
W
N
S
E
PROJECT LOCATION
NOT TO SCALE
DATECHAIRMAN, HAWAIIAN HOMES COMMISSION STATE OF HAWAI‘I
TMK: (3) 7-4-021: 015, 016
TMK: (3) 7-4-021: 011
TMK: (3) 7-4-021: 005
TMK: (3) 7-4-020: 006, 007
SHEET
INDEX TO DRAWINGS:SHEET TITLE
OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
Expires 4/30/16
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
7February,
2016
SPECIAL CONDITIONS NOTESSC-1: Access to Work Sites:
1. The “Preserves” include four (4) distinct and separate locations. The Aupaka Preserve: TMK (3) 7-4-21:05, Lot 13, the Lesser Aupaka Preserve: TMK (3) 7-4-8:07 and the Uhiuhi Preserve: TMK (3) 7-4-21:011, Lot 19. All of the Preserves harbor endangered plant species, which are protected under State and Federal laws. Damaging or destroying these plants will result in State and Federal criminal prosecution. This scope of work also includes one mini preserve, the Mini Uhiuhi Preserve which is located on Lot No. 108 within Village 4 (Akau). The Archaeological Preserve: TMK 7-4-21:016, Lot 24 does not contain endangered plant species, however, the protocols for working in or around this preserve will be the same as for the all others.
2. Except to assist in fire suppression, the Contractor shall not enter the Preserves and shall notify its personnel and sub-contractors not to either, except where expressly indicated or while accompanied by an authorized representative of DHHL.
3. DHHL and/or an authorized representative will hold a briefing to inform the Contractor of special requirements that it must comply with while doing work in or around these areas, before DHHL will allow any work around the Preserves. Attendance at this briefing, by the Contractor and any personnel who will be working around the Preserves, shall be mandatory.
4. Authorized Representatives include the following:
a. Jeffrey Fujimoto, Department of Hawaiian Home Lands, DHHL Project Engineer (808) 620-9274
b. Leonard Bisel, b+k design group, llc - Consulting Landscape Architect (808) 969-9533
5. Site Manager:a. Jill Wagner (Future Forest Nursery) - Hawaii Forest Industry
Association (HFIA) Site Manager (808) 325-2377
SC-2: Fire Contingency Plan:
1. Prior to the start of any Work, the Contractor shall prepare and file a written Fire Contingency Plan with the Project Manager for review and acceptance. The Fire Contingency Plan shall incorporate the following features as a minimum:
a. Communication System: Prior to any on-site actions the Contractor shall establish a communications system capable of reaching local emergency services. The job supervisor or his designee must carry a cellular telephone at all times. Communication linkages must be maintained with all emergency services until completion and acceptance of the Work covered by this Contract.
b. Development of a Firefighting Plan: The Contractor will be responsible to maintain fire control at all times. The Contractor shall establish an organization for firefighting, to include personnel training, equipment, and procedures. Elements of the plan will include, as a minimum:
i. Provide each person working on brush clearing and maintenance work with a dedicated 5 gallon poly tank backpack, which is specifically designed for fire suppression. Tanks shall be fitted with a pistol grip and nozzle capable of providing a 35' spray/flow (Indian M100 Poly Tank by FireEnd Fire Services Products (800-759- 3473 or approved equal).
• Personnel shall be given work assignments that always place them in the immediate area of work and with immediate access to a (full) fire suppression backpack upon notice of suspicion of fire.
• A reserve tank (100 gallon min. capacity) for re-filling fire suppression backpacks) shall be kept full to capacity at all times and within immediate access of active brush clearing and firebreak maintenance Work. Reserve tank shall be fitted with a high flow manual valve and a flexible hose to allow fire suppression backpack(s) to be filled quickly.
ii. Ensuring that all personnel that will be working on brush clearing and firebreak maintenance work receive, and certify in the Fire Contingency Plan that they have received the following:
• Training in operation of fire suppression backpack;
• Instruction in priority contact with Hawaii County Fire Department, the Contractor’s job supervisor, the Hawaii County Office of Civil Defense, DLNR-DOFAW (Hilo Office) and the Project Manager;
• Certification that they have been taught basic brush firefighting techniques, if provided, by the Hawaii County Fire Department;
• Identification and knowledge of the location(s) of nearest water source(s) for filling tanker;
• Training in the recognition, prevention and correction of fire hazards.
The Contractor shall not commence with any clearing and grubbing until DHHL has accepted the Fire Contingency Plan and notified the Contractor that he/she may proceed. This work, including preparation, submittal, filing, and processing the Fire Contingency Plan for DHHL acceptance, and all labor, materials and equipment necessary for its implementation throughout the duration of the contract shall not be paid for separately, but shall be included in the various contract items.
SC-3: Definition of Limit of Work Boundaries:
1. Prior to the start of any clearing, grubbing or construction, the Contractor (under the direct observation of a DHHL Authorized Representative) shall clearly mark the ground surface, along the base of the entire length of the Limit of Work Boundary. The Limit of Work boundary shall be spray painted with a minimum 2-inch wide dashed line using fluorescent paint, either orange or pink, with 12-inch minimum lengths at maximum 2-feet on center.
a. The Limits of Work for the brush clearing and maintenance shall be either 25'-0" or 55'-0" setback from the property/preserve boundary as indicated on the construction drawings (Sheets L-1.1, L-1.2, L-1.3, L-1.4, and L-1.5), unless indicated otherwise or approved by a DHHL Authorized Representative.
2. Marking shall not be required if existing, permanent barbed wire, hog wire, chain link fencing, or preserve barriers are already in place which (at the discretion of the DHHL Authorized Representative) will serve the purpose of defining the Limit of Work between the Preserve interior and the proposed brush clearing and maintenance Work.
SC-4: Initial Inspection
1. After the Limit of Work marking has been completed, and prior to any brush clearing and maintenance Work, the Contractor shall contact a DHHL Authorized Representative and the Site Manager to inspect and provide a determination as to which if any native plants growing within the Limits of Work should remain. The Contractor shall provide at least ten (10) working days in advance notice of the inspection to the DHHL Authorized Representative.
2. The Contractor shal l accompany the DHHL Authorized Representative and the Site Manager during the inspection and immediately fence any plant(s) that the DHHL Authorized Representative and/or Site Manager designates to remain during the inspection by installing temporary orange plastic construction fencing at least 5-feet from and completely encircling each plant.
3. Any adjustments to the brush clearing and firebreak maintenance Work resulting from the need to save an existing native plant will be made in the field and shall be documented with a Field Order.
4. Upon completion, and DHHL acceptance, of the above Work, DHHL will notify the Contractor that he/she may proceed with the brush clearing and maintenance work.
SC-5: Brush Clearing and Maintenance
1. After the Limit of Work marking has been completed and a DHHL Authorized Representative and Site Manager has conducted an Initial Inspection of the areas designated for brush clearing and maintenance to designate existing plants to remain, the Contractor shall then remove all other vegetation and dispose of it off-site.
2. Upon completion of the brush clearing and maintenance, the Contractor shall notify DHHL in writing that the work has been completed and request inspection. DHHL will schedule an inspection by its representative no sooner than ten (10) working days after receipt of the request. If DHHL finds that all vegetation not designated to remain has been removed and the brush clearing and fire break completed to its satisfaction, DHHL will notify the Contractor in writing that the work has been accepted and the Contractor may continue with the application of herbicide to the areas within the Limits of Work.
The Contractor should complete the brush clearing within forty (40) working days of the issuance of Notice to Proceed for the Contract.
3. Herbicide Application: No sooner than fifteen (15) working days after DHHL notification that the Brush Clearing and Maintenance Period can begin – but no later the twenty (20) working days – the Contractor shall apply herbicide per the manufacturer’s specifications to the areas within the Limits of Work, except within 20-feet of any plant designated to remain by DHHL.
a. Woody plants such as Leucaena leucocephala/Haole Koa shall be cut flush with the ground and treated with a brush-specific herbicide such as Garlon 4 (or approved equal). Herbicide forgrasses such as Pennisetum setaceum/ Fountain Grass shall be treated with herbicide such as Round-Up (or approved equal).
b. Contractor shall be aware of wind speeds and ensure that herbicide drift does not result in the death of Federally listed plants. Herbicide shall not be sprayed near the Preserve(s) during windy weather conditions and application shall be manually controlled. Low volume spray equipment (such as back packs) should be utilized, using low pressure in applying herbicides. Drift reduction nozzle tips and drift retardant add-mixtures should also be used. Mechanically controlled and/or high volume spray equipment shall not be used to apply herbicide near Preserves.
c. Submit the herbicide Manufacturer Safety Data Sheets (MSDS) and proposed method of application to DHHL for acceptance prior to use. Contractor shall adhere to specified wind speeds identified in the label requirements when applying herbicides.
d. Special Condition-6 (see following section) will govern areas outside of the Limit of Work and Fire Break killed-off by fire , or unauthorized spraying, herbicide drift, clearing, grubbing, or grading in the Preserves. The Contractor will be subject to applicable penalties under State and Federal Endangered Species laws for any endangered plants destroyed by herbicide drift.
SC-6: Fire or Unauthorized Spraying, Clearing, Grubbing, Grading In Preserves:
1. The Contractor shall not spray herbicide, clear, grub, or grade beyond the Limits of Work boundaries established adjacent to the Preserves under SC-3 above. If there is drift from herbicide, or any other encroachment, and it causes the death of a Threatened and Endangered species, it must be reported to the US Fish and Wildlife Service. Contact Office of Law Enforcement, Hilo (808) 933-6964. Take of an endangered species is prohibited under the Endangered Species Act and the State of Hawai'i endangered species law, codified in Hawai'i Revised Statutes, Chapter 195D. Failure to report could result in further liability.
a. A minimum fine of $250.00 will be assessed to the Contractor for the death of each non-Threatened and Endangered native plant species. A minimum fine of $500.00 will be assessed to the Contractor for the death of each Threatened and Endangered species. These minimum fines are in addition to any fines or penalties that might be assessed per Federal or State law.
b. The fines described above will be assessed by deducting from the contract the amount.
Preserves:SC-7 Additional Work Procedures
1. The Contractor shall comply with the following measures for the duration of the Contract:
a. The Contractor shall maintain at the site at all times and in good condition the follow equipment:
i. One (1) 5 gallon fire suppression backpack for each crew member, as described in SC-2.
ii. Reserve tank (100 gallon min.) for re-filling fire suppression backpacks) as described in SC-2.
iii. Approved protective clothing;
iv. Cellular telephone for each crew member.
b. The Contractor shall implement the following work procedures:
i. Maintaining poly tank backpack(s) and reserve tank(s) water level at a maximum with daily checks;
ii. Weekly inspection of all construction activities, which could increase fire and site pollution risk;
iii. Weekly inspection to ensure the integrity of Fire Breaks;
iv. Prohibit the presence of glass containers on site at all times
v. Ensure that all vehicles have fire control apparatus as required by Federal and State law.
c. The Contractor shall not burn any material on-site for the duration of the Contract. All flammable rubbish, refuse, plant material from grubbing and clearing, packing materials, crating or other combustibles shall be removed from the site, and disposed of off-site in a manner approved by the Project Manager.
d. The Contractor shall provide on-site training to all personnel as to the presence of endangered plant species, purposes of mitigative actions to insure their protection, and fire and pollution prevention purposes and actions. New personnel of the Contractor, and those of subcontractors, shall be given complete orientation when first reporting to the site.
e. Construction equipment and vehicles shall not be parked uphill of the Preserves.
f. Construction equipment and vehicles shall not be idled within 500-feet upwind of the Preserves.
g. Fueling points shall not be located uphill, irrespective of the distance, of the Preserve.
h. All spilled fuels shall be immediately processed with an approved nitrogen compound to counteract leaching.
The requirements indicated in this section, except for those pertaining to tanker maintenance and operation shall be made part of any of the agreements between the Contractor and any subcontractors retained by it.
Payment for any work necessary to comply with the requirements of this section shall not be paid for separately, but shall be included in the various contract items.
TS-1.2
Special Conditions Notes
LTB
LTBLTB
LTB
2
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
February, 2016 OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
Expires 4/30/16
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
7
SIGN"HAZARD"
GUARDRAIL
EXP. PVC PIPE
CRMWALL/CLF
GRAVEL ROAD
GRAVEL ROAD
DUST
BAR
RIER
DUST
BAR
RIER
SILT FENCE
WIRE FENCE
AC CUT
CATV
CATV
CATV
CATV
CONC BARRIER
314316
316
318
318
322
322
324
324
326
326
326
328
328
328
332
332
332
332
334
334
334
334
336
336
336
336
338
338
338
338
342
342
342
342
344
344
344
344
346
346
346
346
348
348
348
348
352
352
352
352
352
352
354
354
354
354
354
354
354
356
356
356
356
356
356
356
358
358
358
358
358
358
358
358
362
362
362
362
362
362
362
362
362
362
364
364
364
364
364
364
364
364
364
366
366
366
366 366
366
366
366
366
368
368
368
368
368
368
368
368
372
372
374374
374
376
376
378
378
320
320
330
330 330
340
340
340
340
350
350
350
350
350
360
360
360
360
360
360
360
360
360
360
370
370
370
370
370
LOT 110,474 SQ. FT.
LOT 26,000 SQ. FT.
LOT 36,240 SQ. FT.
LOT 4
6,959 SQ. FT.
LOT 5
9,314 SQ. FT.
LOT 6
9,993 SQ. FT.
LOT 7
8,790 SQ. FT.
LOT 8
8,494 SQ. FT.
LOT 97,751 SQ. FT.
LOT 106,416 SQ. FT.
LOT 116,152 SQ. FT.
LOT 128,618 SQ. FT.
LOT
137,
538
SQ. F
T.
LOT
146,
011
SQ. F
T.
LOT
156,
404
SQ. F
T.
LOT
166,
206
SQ. F
T.
LOT
176,
043
SQ. F
T.
LOT
186,
043
SQ. F
T.
LOT
196,
043
SQ. F
T.
LOT
206,
043
SQ. F
T.
LOT
216,
043
SQ. F
T.
LOT
229,
106
SQ. F
T.
LOT 106
12,530 SQ. FT.
LOT
107
7,39
0 SQ
. FT.
LOT
108
7,29
8 SQ
. FT.
LOT
109
7,47
2 SQ
. FT.
LOT
110
6,51
6 SQ
. FT.
LOT
111
6,09
6 SQ
. FT.
LOT
112
6,04
2 SQ
. FT.
LOT
113
9,40
6 SQ
. FT.
LOT 11410,376 SQ. FT.
LOT 1157,191 SQ. FT.
LOT 1167,273 SQ. FT.
LOT 1177,545 SQ. FT.
LOT 118
9,943 SQ. FT.
LOT
R-1
LOT R-619,646 SQ. FT.
LOT
957,
910
SQ. F
T.LOT
966,
875
SQ. F
T.LOT
976,
875
SQ. F
T.
LOT
986,
909
SQ. F
T.
LOT
996,
375
SQ. F
T.
LOT
100
Condition "A": Tractor mowing of previously cleared/grubbed areas, such as roadways and house pads.
Condition "B": No tractor access. Entire maintenance to be performed by hand, includes the use of gas powered trimmers and hand tools on previously cleared grubbed areas.
Condition "C": Same as Condition "B" described above, but on undisturbed terrain.
Condition "D": Herbicide after clearing to extend maintenance intervals in hard to access or sensitive areas using backpack sprayers (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
Condition "E": Herbicide after clearing to extend maintenance intervals in easy to access areas using truck-mounted high capacity tank and gas powered sprayer with longer throw. Assume water is available on-site. (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
Brush Clearing Plan Aupaka Preserve Boundary
LTB
LTBLTB
LTB
Proposed Village 10 Lot 5
TMK (3) 7-4-020:005
Proposed Village 9 Lot 4
TMK (3) 7-4-020:004
North
40' 80'0' 160'80'
1" = 80'-0"SCALE IN FEET
P A
R K
W A
Y
K E
A L
A K
E H
E
H I G H W A Y
A N E K E O H O K A L O L E
P U
O H
U L
I H
U L
I
S T
R E
E T
Existing Kealakehe High SchoolLot 12
TMK (3) 7-4-021:004
AUPAKA PRESERVE Lot 13
TMK (3) 7-4-021:005
Lot 14 TMK (3) 7-4-021:006
DHHL Villages of La'i 'Opua Village 5
55'-0"
Existing 20'-0" Wide Fire Break
20'-0
" Wid
e Fi
re B
reak
Existing 20'-0" Wide Fire Break
Exis
ting
20'-0
" Wid
e Fi
re B
reak
Exi
stin
g 20
'-0" W
ide
Fire
Bre
ak
Existin
g
BRUSH CLEARING PLAN LEGEND
EXISTING 20'-0" WIDE FIREBREAK
AREA TO BE MAINTAINED: Refer to Sheet TS-1.2 for Special Conditions Notes. (Approx. 43,911 Square Feet Total Condition "E", This Sheet)
APPROXIMATE LIMITS OF WORK
ALLOWANCE ITEM - Area To Be Maintained when directed by DHHL. (Refer To Special Conditions Notes, Sheet TS-1.2 )
55'-0"
L-1.1
Typical
Typical
3
BRUSH CLEARING/HERBICIDE APPLICATION DESCRIPTIONS
STA. L-14
STA. L-5
STA. L-2
MAG NAILELEV.=578.87
1/2" PIPEELEV.=486.22
MAG NAILELEV.=551.42
11Ā44'04" 867.43
(STA. L-2 TO STA. L-3)
(STA
. L-1
TO
STA
. L-2
)24
9Ā30
'11"
29
9.59
(STA
. L-5
TO
STA.
L-1
4)
264Ā
01'43
"
281.
04
PRO
POSE
D B
OUN
DARY
TW 502.5
TW 501.5
GATE
WHITE LINE
WMH (ARV)
WMH (ARV)
WV
WV
WV
SIGN POST
BORING B-8HUB=482.67
BORING B-1MAG NAIL=553.27
BORING B-10HUB=485.39
BORING B-9HUB=471.61
BW 496.5
BW 495.5
BORING B-4HUB=553.76
SIGNPOST
TOP=578.44TV=577.59
TOP=578.50TS=576.46
TOP=578.58TS=576.44
TOP=578.65TS=576.41 TOP=578.70
TV=577.70
BOT. BANK
DIRT
RO
AD
DIRT
RO
AD
DIRT
RO
AD
UHIUHID=2'H=15'
UHIUHID=1'H=15'
UHIUHI(DEAD)
UHIUHI(DEAD)
UHIUHID=0.7'H=12'
UHIUHID=1'H=15'
UHIUHID=1'H=15'
3-KOKOOLAUD=0.2'H=6' KOKOOLAU
D=0.1'H=3'
KOKOOLAUD=0.2'H=8'
KOKOOLAUD=0.1'H=3'
KOKOOLAUD=0.2'H=5'
4-KOKOOLAUD=0.2'H=7'
2-KOKOOLAUD=0.2'H=6'
WOO
D FE
NCE
(SAPLINGS)D=0.1'H=0.3'
UHIUHI(CLUSTER)
UHIUHID=0.3'H=10'
TOP BANK
TOP BANK
UHIUHID=1'H=15'
TREE(DEAD)
OHE MAKAID=0.5'H=10'
480
470
470
490
560
550
550
540
540
530
530
520
520
510
510
500
500
560
570
580
590
460
460
470
480
480
470
580
470
7-4-
23:8
9
7-4-
23:8
8
7-4-
23:1
06
7-4-
23:1
08
7-4-
23:1
09
R O A D " D"
R O A D " E "
R O
A D
"
C "
R O A D " F "
R O A D " H "
R O A D " G "
R O
A D
"
G
"
19
20
21
22
23
24
582
580
594
596
58458
6
480
590
450
530
520
510
490500
490
460
470
490
470
540
550
540
540
550
550
560
560
570
570
560
500
460
580
580
480
480
R O
A D
"
C "
5+00
6
7
8
9
10+0
0
11
12
13
14
15+0
0
15+8
0.63
1
2
3
44+10.07
8
9
10+00
9
10+00
11
12
13
14
15+0
0
16
11
12
13
1
2
3
17
1 8
63
64
65
66
67
68
697071
72
73 74
75
76
77
78
10810
911011
1112
113
114
115
126
127
128
129
130
131
15615
7158
159
160
161
162
163
164
194
195
19619
7198
199
200
201
202
203
204 20
5
206
207
208
209
210
211
212
213
21421
5
253
116
117
118
125
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
February, 2016 OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
Expires 4/30/16
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
7
4
352°02'15"162.83
49°35' 267.10
281.00
R=30.00
275°
55'26
"
641
.29
285°4
3'14"
264.8
5
20°42'48" 41.14
73° 00'38" 42.52
139°36'
639.00
43°57'24" 388.37
190°35' 160.00
228°26' 167.00
175°49' 147.00
237°54' 74.00
104°
54'51
" 11
0.07
26°19'05" 131.24
BRUSH CLEARING PLAN LEGEND
AREA TO BE CLEARED AND MAINTAINED: Refer to Sheet TS-1.2 for Special Conditions Notes. (Approx. 54,276 Square Feet Total Condition "B", This Sheet and Approx. 54,276 Square Feet Total Condition "E", This Sheet)
EXISTING 20'-0" WIDE FIREBREAK
APPROXIMATE LIMITS OF WORK
ADJACENT DEVELOPED PARCEL
Brush Clearing Plan Uhiuhi Preserve & Village 2, 3, & 4 Boundaries
LTB
LTBLTB
LTB
M A N A W A L E ' A
Proposed Neighborhood Park
Lot 18 TMK 7-4-21:010
UHIUHI PRESERVE Lot 19
TMK 7-4-21:011
Lot 23 TMK 7-4-21:015
DHHL Villages of La'i 'Opua Proposed Village 2
DHHL Villages of La'i 'Opua
Existing Village 3
Lot 20 TMK 7-4-21:012
DHHL Villages of La'i 'Opua
Proposed Village 4
Lot 22 TMK 7-4-21:014
DHHL Villages of La'i 'Opua Proposed Village 1
North
40' 80'0' 160'80'
1" = 80'-0"SCALE IN FEET
25'-0"
7-4-23:113
7-4-23:016
Exist
ing
20'-0
" Wid
e Fi
re B
reak
Existin
g 20'-
0" W
ide F
ire B
reak
Existing 20'-0" Wide Fire Break
Existing 20'-0" Wide Fire Break
20'-0" Wide Fire Break
Existing 20'-0"W
ide Fire Break
Existing 20'-0"W
ide Fire Break
Existing
7-4-23:114
7-4-23:015
Area To Be Cleared and Maintained (Refer To Special Conditions Notes, Sheets TS-1.2)
Adjacent Developed Parcel, Typical
MINI UHIUHI PRESERVE
L-1.2
Condition "A": Tractor mowing of previously cleared/grubbed areas, such as roadways and house pads.
Condition "B": No tractor access. Entire maintenance to be performed by hand, includes the use of gas powered trimmers and hand tools on previously cleared grubbed areas.
Condition "C": Same as Condition "B" described above, but on undisturbed terrain.
Condition "D": Herbicide after clearing to extend maintenance intervals in hard to access or sensitive areas using backpack sprayers (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
Condition "E": Herbicide after clearing to extend maintenance intervals in easy to access areas using truck-mounted high capacity tank and gas powered sprayer with longer throw. Assume water is available on-site. (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
BRUSH CLEARING/HERBICIDE APPLICATION DESCRIPTIONS
100'-
0"
25'-0"
25'-0"
Leave 100' Uncut For A Natural Barrier
Area To Be Cleared And Maintained (Refer To SpecialConditions Notes,Sheet TS-1.2)
Conc Pad
Conc
Curb
Ht=0.5'
LP
LP
SLB
HELCO MH
WVHH
679.6 top
677.3 ts
WVHH
672.8 top
670.7 ts
WMH
679.8 top
678.0 ts
WVHH
679.7 top
677.2 ts
WVHH
679.1 top
676.8 ts
HY
D
FH
H Y
D
CBw/drywell (Per Plan)
685.1 top MH
(sealed)
CBw/drywell (Per Plan)
685.0 top MH
(sealed)
SMH677.9 top
669.9 inv 8"
S8"
S8"
S8"
660
670
650
640630
620
610
605
600
595
590
585
554
552
Rock Wall Ht=2.5'
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
x
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
i-15.191;Burial Site
Ht=2.5'
911201 D141
4-1-92
i-15.191;Burial Site
PHRI 91-1201
FEAT D-29i-15.191;Burial Site
Ht=3.6'
PHRI 91-1201
Block 8 D-162
i-15.191;Burial Site
Ht=4'
PHRI 91-1201
Block 5 D-161
i-15.191;Burial Site
Ht=3'
S Home Depo
D-160
i-15.191;Burial Site
Ht=3.7'
PHRI 91-1201
Site 13254
FEAT-X
i-15.191;Burial Site
Ht=2'
PHRI 91-1201
Site 13254
FEAT-X
i-15.191;Burial Site
Ht=3'
PHRI 91-1201
Site 13254
FEAT-U
i-15.191;Burial Site
Ht=3'
PHRI 91-1201
Site 13254
FEAT-Y t.4.4
i-15.191;Burial Site
Ht=4'
PHRT 91-1201
Site 13254 SEAT-V
i-15.191;Burial Site
Ht=3'
PHII 91-1201
Block D FEAT-D 351
i-15.191;Rock Wall Ht=2'
i-15.191;Burial Site
Ht=3'
D201
i-15.191;Burial Site
Ht=3.6'
D209
i-15.191;Burial Site
Ht=2'
D205
i-15.191;Burial Site
Ht=3'
PHII 91-1201
13254 FEAT J
i-15.191;Burial Site
Ht=2'
No ID Tag
i-15.191;Burial Site
Ht=2'
PHRI 91-1201
D207
i-15.191;Burial Site
Ht=3'
PHRI 91-1201
Site 13 B254 SEAE
i-15.191;Burial Site
Ht=2'
PHRI 91-1201
BLK-D SEA D-209i-15.191;Burial Site
Ht=2'
PHRI 91-1201
13254 FERT D
i-15.191;Burial Site
Ht=3'
PHRI 91-1201 D-297
Area-D Site 13254
i-15.191;Burial Site
Ht=2'
PHRI 91-1201 D-212
Site 13254 Area-D
i-15.191;Burial Site
Ht=1'
PHRI 1201 D-302
Area-D
Wire Fence Ht=4'
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
x
Treei-15.191;D=2'
H=40'
S=30'
Treei-15.191;D=2.
H=35'
S=30'
Treei-15.191;D=2'
H=60'
S=40'
Treei-15.191;D=2'
H=60'
S=40'
Treei-15.191;D=3'
H=30'
S=20'
2-Kookolao
D=0.2'
H=10'
S=5'
Kookolao
D=0.2'
H=10'
S=5'
UhiUhi #V209
530
530
530
535535
540
545
550
550
555
555
560
565
570
570
575
575
580
580
585
585
590
595
600
600
605
605
610
610
615
615
620
625
630
630
635
635
640
645
650
650
655
660
670
675
675
680
685
690
695
700
x
x
x
x
x
xxxxx
xx
xx
xx
xx x x x x x x x x
xx
xx
x xx
xx
xx
x
xx
xx
xx
xx
xx
xx
xx
x
xx
xx
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx x x x x x x x x x x x x x x
xx
x
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
x
x
x
x
xxxxxx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx
xx x
xx
xx
xx
xx
xx
xx
x
xxxx
xx
xx
x
x
x
xx
xx
x
x
x
xx
x x x
x
x
xxx
xx
xx
x
Plastic Fence Ht=4‘
Plastic
Fen
ce H
t=4‘
x
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
7OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
Expires 4/30/16
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
5February, 2016
L-1.3
BRUSH CLEARING PLAN LEGEND
AREA TO BE CLEARED AND MAINTAINED: Refer to Sheet TS-1.2 for Special Conditions Notes. (Approx. 68,833 Square Feet Total Condition "C", This Sheet and Approx. 68,833 Square Feet Total Condition "D", This Sheet)
EXISTING 20'-0" WIDE FIREBREAK
APPROXIMATE LIMITS OF WORK
ADJACENT DEVELOPED PARCEL
Brush Clearing Plan Village 3 and Proposed Village 2 Boundary
LTB
LTBLTB
LTB
50' 100'0' 200'100'
1" = 100'-0"SCALE IN FEET
North
Ko'oko'olau
Uhiuhi (Living)
Uhiuhi (Living)
(PROPOSED) ARCHAEOLOGICAL
PRESERVE Lot 24
TMK 7-4-21:016
S T R E E T
MA
NA
W
A L E A
Lot 22 TMK 7-4-21:14
DHHL Villages of La'i 'Opua Proposed Village 1
Uhiuhi Preserve Lot 19
TMK 7-4-21:011
Lot 23 TMK 7-4-21:15
DHHL Villages of La'i 'Opua Proposed Village 2
25'-0"
DHHL Villages of La'i 'Opua
Existing Village 3
Area To Be Cleared and Maintained (Refer To Special Conditions Notes, Sheet TS-1.2)
Adjacent Developed Parcel, Typical
Area To Be Cleared and Maintained (Refer To Special Conditions Notes, Sheet TS-1.2)
Adjacent Developed Parcel, Typical
Uhiuhi (Living)
7-4-22:093
7-4-23:121
7-4-23:120
7-4-23:116
7-4-23:009
7-4-23:123
7-4-23:124
7-4-23:125
7-4-23:014
7-4-23:013
7-4-23:012
7-4-23:011
7-4-23:010
7-4-23:008
7-4-22:092
7-4-22:091
7-4-22:090
7-4-22:089
7-4-22:087
7-4-22:086
7-4-22:034
7-4-22:033
7-4-22:032
7-4-22:031
Condition "A": Tractor mowing of previously cleared/grubbed areas, such as roadways and house pads.
Condition "B": No tractor access. Entire maintenance to be performed by hand, includes the use of gas powered trimmers and hand tools on previously cleared grubbed areas.
Condition "C": Same as Condition "B" described above, but on undisturbed terrain.
Condition "D": Herbicide after clearing to extend maintenance intervals in hard to access or sensitive areas using backpack sprayers (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
Condition "E": Herbicide after clearing to extend maintenance intervals in easy to access areas using truck-mounted high capacity tank and gas powered sprayer with longer throw. Assume water is available on-site. (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
BRUSH CLEARING/HERBICIDE APPLICATION DESCRIPTIONS
25'-0"
25'-0"
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
February, 2016 OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
Expires 4/30/16
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
7
6
AREA TO BE CLEARED AND MAINTAINED: Refer to Sheet TS-1.2 for Special Conditions Notes. (Approx. 39,474 Square Feet Total Condition "B", This Sheet and Approx. 39,474 Square Feet Total Condition "E", This Sheet)
430
430
430
420
430
420
430
430
430
420
410
420410400
420410400
420
410400
420
410
430
440
450
440
430 440
460
460
460
450
430
440
430
440
450
460
470
480
480
470
460
470
440450
440
450
440
430
450
460
470
460 47
0
480
480
480 49
0
490
490
490
470
480 49
0
500
500
500
470
480
500
510
510 52
0
510 52
0
510
520
500
530 54
0
530
530
520
540
550
540
550 56
0 560560
550
550
560
560
570
570
580
580
590
580
570
580
570
570
560
550
540
530
550
570
560
450
7-4-23:0837-4-23:084
7-4-23:0857-4-23:086
7-4-23:0877-4-23:088
7-4-23:089
7-4-23:1067-4-23:108 7-4-23:109 7-4-23:113
1
CBU (USPS) LOT120
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
5152
53
54
55
56
57
58
59
60
6162
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
7879
80
81
82
83
84
85
86
87
88
8990
9192
93
94
95
96
97
9899
100
101
102
103
104
105
106
107
109
110
111
112
113
114
115
116
117
118
119
121
PARK SITE
LOT
108
Min
i Uhi
uhi
Pres
erve
Lot
21
BOAT PARKING
LOT
BRUSH CLEARING PLAN LEGEND
EXISTING 20'-0" WIDE FIREBREAK
APPROXIMATE LIMITS OF WORK
ADJACENT DEVELOPED PARCEL
Proposed Neighborhood Park
Lot 18 TMK 7-4-21:010
UHIUHI PRESERVE Lot 19
TMK 7-4-21:011
Lot 23 TMK 7-4-21:015DHHL Villages of La'i 'Opua Proposed Village 2
DHHL Villages of La'i 'Opua
Existing Village 3
Lot 20 TMK 7-4-21:012
DHHL Villages of La'i 'Opua
Village 4 - Akau
Lot 22 TMK 7-4-21:014
DHHL Villages of La'i 'Opua Proposed Village 1
M A N A W
A L E ' A S T R E E T
K O ' O K O ' O L A U
S T R E E T
N A N E A
S T R E E T
O H E L O
K A I
K A W E L O
P L A C E
'I L I E ' E ' E P L A C
E
M A U A P L A C E
O H E M A K A I
K O
A I ' A
S T R E E T
H A L E O L O N O P L A C E
D R I V E
K E A N A L E H U
P L A C E
P L A C
E
Lot 20 TMK 7-4-21:012
DHHL Villages of La'i 'Opua
Village 4 - Hema
Brush Clearing Plan Village 4 and Uhiuhi Preserve Boundary
L-1.4
7-4-23:081
7-4-23:082
Existin
g 20'-0" W
ide Fire Break
Adjacent Developed Parcel, Typical
Existing 20'-0" Wide Fire Break
Wide Fire Break
Existing 20'-0"
LTB
LTBLTB
LTB
50' 100'0' 200'100'
1" = 100'-0"SCALE IN FEET
North
Condition "A": Tractor mowing of previously cleared/grubbed areas, such as roadways and house pads.
Condition "B": No tractor access. Entire maintenance to be performed by hand, includes the use of gas powered trimmers and hand tools on previously cleared grubbed areas.
Condition "C": Same as Condition "B" described above, but on undisturbed terrain.
Condition "D": Herbicide after clearing to extend maintenance intervals in hard to access or sensitive areas using backpack sprayers (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
Condition "E": Herbicide after clearing to extend maintenance intervals in easy to access areas using truck-mounted high capacity tank and gas powered sprayer with longer throw. Assume water is available on-site. (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
BRUSH CLEARING/HERBICIDE APPLICATION DESCRIPTIONS
25'-0"
Area To Be Cleared And Maintained (Refer To Special Conditions Notes,Sheet TS-1.2)
Area (Outside of Mini Preserve Wall) To Be Cleared And Maintained (Refer To Special Conditions Notes,Sheet TS-1.2)
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
February, 2016 OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
Expires 4/30/16
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
DHHL Villages of La'i 'Opua
Existing Village 3
7
7
K E A N A L E H U
P U O H U L I H U L I
S T R E E T
K E A L A K E H E
P A R K W A Y
K A N I O H A L E
L O O P
304 306
308
308
308
308
312
312
312
312
312
314
314314
314
314
316
318
318
322
324
324
326
326
328
328
332
334
334
334
336
336
336
338
338
342
344
344
346
346
348
348
348
352
352
354
354
354
356
356
356
356
356
356
358
358
358
358
362
364
364
364
366
366
368
368
368
372
372
372
374
376
376
376
378
378
382
382
384
386
386
388
388392
392
392
394
394
394
396
396
396
404
406414
416
416
366
358
358
352
342
336
326
316
316
316
318
318
412
408
406
404
402
396
388388
384
372
368
386
382
374
364
358
354
356
358
414
310
310
310
310
320
320
330
330
340
350
350
350
350
350
360
360
360
360
370
370
370
380
380
390
390
400
410
330
320
360
350
340
390
380
380
360
STOP
R/W
R/W
Condition "A": Tractor mowing of previously cleared/grubbed areas, such as roadways and house pads.
Condition "B": No tractor access. Entire maintenance to be performed by hand, includes the use of gas powered trimmers and hand tools on previously cleared grubbed areas.
Condition "C": Same as Condition "B" described above, but on undisturbed terrain.
Condition "D": Herbicide after clearing to extend maintenance intervals in hard to access or sensitive areas using backpack sprayers (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
Condition "E": Herbicide after clearing to extend maintenance intervals in easy to access areas using truck-mounted high capacity tank and gas powered sprayer with longer throw. Assume water is available on-site. (in addition to Conditions A, B, or C). Herbicide mix shall consist of 2% Roundup (or approved equal), 2% Garlon 4 (or approved equal), and .125% surfactant
BRUSH CLEARING/HERBICIDE APPLICATION DESCRIPTIONS
BRUSH CLEARING PLAN LEGEND
AREA TO BE MOWED AND MAINTAINED: Refer to Sheet TS-1.2 for Special Conditions Notes (Approx. 494,470 Square Feet [346,129 Square Feet Condition "A", 148,341 Square Feet Condition "B"] and Approx. 494,470 Square Feet Total Condition "E")
EXISTING 20'-0" WIDE FIREBREAK
APPROXIMATE LIMITS OF WORK
DEVELOPED PARCEL
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
LOT 8LOT 9
LOT 10LOT 11
LOT 12
LOT 13
LOT 14
LOT 15
LOT 16
LOT 17
LOT 18
LOT 19
LOT 20
LOT 21
LOT 22
LOT 23
LOT 24
LOT 25
LOT 26
LOT 27LOT 28
LOT 29
LOT 30
LOT 31
LOT 32
LOT 33
LOT 34
LOT 35
LOT 36LOT 37
LOT 38
LOT 39
LOT 40
LOT 41
LOT 42
LOT 43
LOT 44
LOT 45
LOT 46
LOT 47
LOT 48
LOT 49
LOT 50
LOT 51
LOT 52
LOT 53
LOT 54
LOT 55
LOT 56
LOT 57
LOT 58
LOT 59
LOT 60
LOT 61
LOT 62
LOT 63
LOT 106
LOT 107
LOT 108
LOT 109
LOT 110
LOT 111
LOT 112
LOT 113
LOT 114
LOT 115
LOT 116
LOT 117
LOT 118
LOT R-3
23,131 SQ. FT.
LOT 64
LOT 65
LOT 66
LOT 67
LOT 68
LOT 69LOT 70
LOT 71
LOT 72
LOT 73
LOT 74
LOT 75
LOT 76
LOT 77
LOT 78
LOT 79
LOT 80
LOT 81
LOT 82
LOT 83
LOT 84
LOT 85
LOT 86
LOT 87
LOT 88
LOT 89
LOT 90
LOT 91
LOT 92
LOT 93
LOT 94LOT 95
LOT 96
LOT 97
LOT 98
LOT 99
LOT 100
LOT 101
LOT 102
LOT 103
LOT 104
LOT 105
Kealakehe High SchoolLot 12
TMK (3) 7-4-021:004
AUPAKA PRESERVE Lot 13
TMK (3) 7-4-021:005
P A R K W A Y
K E A L A K E H E
A U P A K AD
R I V E
K E A
N A
L E H U
P L A C E
W I L I W
I L I W A
Y
U H
I U H
I P L A C
E
U H
I U H
I P L A C
E
K U
L U ' I W
A Y
'A H
E A H
E A W
A Y
K A N I O H A L E
D R I V E
Lot 23 TMK 7-4-21:015
DHHL Villages of La'i 'Opua
Proposed Village 2
Lot 14 TMK (3) 7-4-021:006
DHHL Villages of La'i 'Opua
Village 5
Brush Clearing Plan Village 5 and Aupaka Preserve Boundary
L-1.5
55'-0"
55'-0"
Typical
Typical
Existing 20'-0" Wide Fire Break
Area To Be Mowed and Maintained (Refer To Special Conditions Notes, Sheet TS-1.2)
Developed Parcel, Typical
Existing 20'-0" Wide Fire Break
Existing 20'-0" Wide Fire Break
LTB
LTBLTB
LTB
40' 80'0' 160'80'
1" = 80'-0"SCALE IN FEET
North
AREA TO BE MAINTAINED: Refer to Sheet TS-1.2 for Special Conditions Notes. (Approx. 57,413 Square Feet Total Condition "E")
ALLOWANCE ITEM - Area To Be Maintained when directed by DHHL. (Refer To Special Conditions Notes, Sheet TS-1.2 )
OF....................SHTS
SHEET
DRAWING NO.
SHT. .......
OF .......DATE
PROJECT NO.
NO.REVISION
FILE...............................................DRAWER...............................................FOLDER.................................
b+k design group, llc 16-643 Kipimana St., Suite 12, Keaau, Hawai‘i 96749
Tel: (808) 969-9533 Fax: (808) 969-9534
DESIGNED BY:
DRAWN BY:
SYM.
CHECKED BY:
APPROVED BY:
DATE
DESCRIPTION
DEPARTMENT OF HAWAIIAN HOME LANDSSTATE OF HAWAI‘I
THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
LICENSEDPROFESSIONAL
LANDSCAPEARCHITECTNo. 8364
LEONA RD BI SEL
T.
H
AWAI I, U. S. A
.
Expires 4/30/16
BRUSH CLEARING & MAINTENANCEVILLAGES OF LA‘I ‘OPUA
KEALAKEHE, NORTH KONA, HAWAII
7February,
2016
SPECIAL CONDITIONS NOTESSC-1: Access to Work Sites:
1. The “Preserves” include four (4) distinct and separate locations. The Aupaka Preserve: TMK (3) 7-4-21:05, Lot 13, the Lesser Aupaka Preserve: TMK (3) 7-4-8:07 and the Uhiuhi Preserve: TMK (3) 7-4-21:011, Lot 19. All of the Preserves harbor endangered plant species, which are protected under State and Federal laws. Damaging or destroying these plants will result in State and Federal criminal prosecution. This scope of work also includes one mini preserve, the Mini Uhiuhi Preserve which is located on Lot No. 108 within Village 4 (Akau). The Archaeological Preserve: TMK 7-4-21:016, Lot 24 does not contain endangered plant species, however, the protocols for working in or around this preserve will be the same as for the all others.
2. Except to assist in fire suppression, the Contractor shall not enter the Preserves and shall notify its personnel and sub-contractors not to either, except where expressly indicated or while accompanied by an authorized representative of DHHL.
3. DHHL and/or an authorized representative will hold a briefing to inform the Contractor of special requirements that it must comply with while doing work in or around these areas, before DHHL will allow any work around the Preserves. Attendance at this briefing, by the Contractor and any personnel who will be working around the Preserves, shall be mandatory.
4. Authorized Representatives include the following:
a. Jeffrey Fujimoto, Department of Hawaiian Home Lands, DHHL Project Engineer (808) 620-9274
b. Leonard Bisel, b+k design group, llc - Consulting Landscape Architect (808) 969-9533
5. Site Manager:a. Jill Wagner (Future Forest Nursery) - Hawaii Forest Industry
Association (HFIA) Site Manager (808) 325-2377
SC-2: Fire Contingency Plan:
1. Prior to the start of any Work, the Contractor shall prepare and file a written Fire Contingency Plan with the Project Manager for review and acceptance. The Fire Contingency Plan shall incorporate the following features as a minimum:
a. Communication System: Prior to any on-site actions the Contractor shall establish a communications system capable of reaching local emergency services. The job supervisor or his designee must carry a cellular telephone at all times. Communication linkages must be maintained with all emergency services until completion and acceptance of the Work covered by this Contract.
b. Development of a Firefighting Plan: The Contractor will be responsible to maintain fire control at all times. The Contractor shall establish an organization for firefighting, to include personnel training, equipment, and procedures. Elements of the plan will include, as a minimum:
i. Provide each person working on brush clearing and maintenance work with a dedicated 5 gallon poly tank backpack, which is specifically designed for fire suppression. Tanks shall be fitted with a pistol grip and nozzle capable of providing a 35' spray/flow (Indian M100 Poly Tank by FireEnd Fire Services Products (800-759- 3473 or approved equal).
• Personnel shall be given work assignments that always place them in the immediate area of work and with immediate access to a (full) fire suppression backpack upon notice of suspicion of fire.
• A reserve tank (100 gallon min. capacity) for re-filling fire suppression backpacks) shall be kept full to capacity at all times and within immediate access of active brush clearing and firebreak maintenance Work. Reserve tank shall be fitted with a high flow manual valve and a flexible hose to allow fire suppression backpack(s) to be filled quickly.
ii. Ensuring that all personnel that will be working on brush clearing and firebreak maintenance work receive, and certify in the Fire Contingency Plan that they have received the following:
• Training in operation of fire suppression backpack;
• Instruction in priority contact with Hawaii County Fire Department, the Contractor’s job supervisor, the Hawaii County Office of Civil Defense, DLNR-DOFAW (Hilo Office) and the Project Manager;
• Certification that they have been taught basic brush firefighting techniques, if provided, by the Hawaii County Fire Department;
• Identification and knowledge of the location(s) of nearest water source(s) for filling tanker;
• Training in the recognition, prevention and correction of fire hazards.
The Contractor shall not commence with any clearing and grubbing until DHHL has accepted the Fire Contingency Plan and notified the Contractor that he/she may proceed. This work, including preparation, submittal, filing, and processing the Fire Contingency Plan for DHHL acceptance, and all labor, materials and equipment necessary for its implementation throughout the duration of the contract shall not be paid for separately, but shall be included in the various contract items.
SC-3: Definition of Limit of Work Boundaries:
1. Prior to the start of any clearing, grubbing or construction, the Contractor (under the direct observation of a DHHL Authorized Representative) shall clearly mark the ground surface, along the base of the entire length of the Limit of Work Boundary. The Limit of Work boundary shall be spray painted with a minimum 2-inch wide dashed line using fluorescent paint, either orange or pink, with 12-inch minimum lengths at maximum 2-feet on center.
a. The Limits of Work for the brush clearing and maintenance shall be either 25'-0" or 55'-0" setback from the property/preserve boundary as indicated on the construction drawings (Sheets L-1.1, L-1.2, L-1.3, L-1.4, and L-1.5), unless indicated otherwise or approved by a DHHL Authorized Representative.
2. Marking shall not be required if existing, permanent barbed wire, hog wire, chain link fencing, or preserve barriers are already in place which (at the discretion of the DHHL Authorized Representative) will serve the purpose of defining the Limit of Work between the Preserve interior and the proposed brush clearing and maintenance Work.
SC-4: Initial Inspection
1. After the Limit of Work marking has been completed, and prior to any brush clearing and maintenance Work, the Contractor shall contact a DHHL Authorized Representative and the Site Manager to inspect and provide a determination as to which if any native plants growing within the Limits of Work should remain. The Contractor shall provide at least ten (10) working days in advance notice of the inspection to the DHHL Authorized Representative.
2. The Contractor shal l accompany the DHHL Authorized Representative and the Site Manager during the inspection and immediately fence any plant(s) that the DHHL Authorized Representative and/or Site Manager designates to remain during the inspection by installing temporary orange plastic construction fencing at least 5-feet from and completely encircling each plant.
3. Any adjustments to the brush clearing and firebreak maintenance Work resulting from the need to save an existing native plant will be made in the field and shall be documented with a Field Order.
4. Upon completion, and DHHL acceptance, of the above Work, DHHL will notify the Contractor that he/she may proceed with the brush clearing and maintenance work.
SC-5: Brush Clearing and Maintenance
1. After the Limit of Work marking has been completed and a DHHL Authorized Representative and Site Manager has conducted an Initial Inspection of the areas designated for brush clearing and maintenance to designate existing plants to remain, the Contractor shall then remove all other vegetation and dispose of it off-site.
2. Upon completion of the brush clearing and maintenance, the Contractor shall notify DHHL in writing that the work has been completed and request inspection. DHHL will schedule an inspection by its representative no sooner than ten (10) working days after receipt of the request. If DHHL finds that all vegetation not designated to remain has been removed and the brush clearing and fire break completed to its satisfaction, DHHL will notify the Contractor in writing that the work has been accepted and the Contractor may continue with the application of herbicide to the areas within the Limits of Work.
The Contractor should complete the brush clearing within forty (40) working days of the issuance of Notice to Proceed for the Contract.
3. Herbicide Application: No sooner than fifteen (15) working days after DHHL notification that the Brush Clearing and Maintenance Period can begin – but no later the twenty (20) working days – the Contractor shall apply herbicide per the manufacturer’s specifications to the areas within the Limits of Work, except within 20-feet of any plant designated to remain by DHHL.
a. Woody plants such as Leucaena leucocephala/Haole Koa shall be cut flush with the ground and treated with a brush-specific herbicide such as Garlon 4 (or approved equal). Herbicide forgrasses such as Pennisetum setaceum/ Fountain Grass shall be treated with herbicide such as Round-Up (or approved equal).
b. Contractor shall be aware of wind speeds and ensure that herbicide drift does not result in the death of Federally listed plants. Herbicide shall not be sprayed near the Preserve(s) during windy weather conditions and application shall be manually controlled. Low volume spray equipment (such as back packs) should be utilized, using low pressure in applying herbicides. Drift reduction nozzle tips and drift retardant add-mixtures should also be used. Mechanically controlled and/or high volume spray equipment shall not be used to apply herbicide near Preserves.
c. Submit the herbicide Manufacturer Safety Data Sheets (MSDS) and proposed method of application to DHHL for acceptance prior to use. Contractor shall adhere to specified wind speeds identified in the label requirements when applying herbicides.
d. Special Condition-6 (see following section) will govern areas outside of the Limit of Work and Fire Break killed-off by fire , or unauthorized spraying, herbicide drift, clearing, grubbing, or grading in the Preserves. The Contractor will be subject to applicable penalties under State and Federal Endangered Species laws for any endangered plants destroyed by herbicide drift.
SC-6: Fire or Unauthorized Spraying, Clearing, Grubbing, Grading In Preserves:
1. The Contractor shall not spray herbicide, clear, grub, or grade beyond the Limits of Work boundaries established adjacent to the Preserves under SC-3 above. If there is drift from herbicide, or any other encroachment, and it causes the death of a Threatened and Endangered species, it must be reported to the US Fish and Wildlife Service. Contact Office of Law Enforcement, Hilo (808) 933-6964. Take of an endangered species is prohibited under the Endangered Species Act and the State of Hawai'i endangered species law, codified in Hawai'i Revised Statutes, Chapter 195D. Failure to report could result in further liability.
a. A minimum fine of $250.00 will be assessed to the Contractor for the death of each non-Threatened and Endangered native plant species. A minimum fine of $500.00 will be assessed to the Contractor for the death of each Threatened and Endangered species. These minimum fines are in addition to any fines or penalties that might be assessed per Federal or State law.
b. The fines described above will be assessed by deducting from the contract the amount.
Preserves:SC-7 Additional Work Procedures
1. The Contractor shall comply with the following measures for the duration of the Contract:
a. The Contractor shall maintain at the site at all times and in good condition the follow equipment:
i. One (1) 5 gallon fire suppression backpack for each crew member, as described in SC-2.
ii. Reserve tank (100 gallon min.) for re-filling fire suppression backpacks) as described in SC-2.
iii. Approved protective clothing;
iv. Cellular telephone for each crew member.
b. The Contractor shall implement the following work procedures:
i. Maintaining poly tank backpack(s) and reserve tank(s) water level at a maximum with daily checks;
ii. Weekly inspection of all construction activities, which could increase fire and site pollution risk;
iii. Weekly inspection to ensure the integrity of Fire Breaks;
iv. Prohibit the presence of glass containers on site at all times
v. Ensure that all vehicles have fire control apparatus as required by Federal and State law.
c. The Contractor shall not burn any material on-site for the duration of the Contract. All flammable rubbish, refuse, plant material from grubbing and clearing, packing materials, crating or other combustibles shall be removed from the site, and disposed of off-site in a manner approved by the Project Manager.
d. The Contractor shall provide on-site training to all personnel as to the presence of endangered plant species, purposes of mitigative actions to insure their protection, and fire and pollution prevention purposes and actions. New personnel of the Contractor, and those of subcontractors, shall be given complete orientation when first reporting to the site.
e. Construction equipment and vehicles shall not be parked uphill of the Preserves.
f. Construction equipment and vehicles shall not be idled within 500-feet upwind of the Preserves.
g. Fueling points shall not be located uphill, irrespective of the distance, of the Preserve.
h. All spilled fuels shall be immediately processed with an approved nitrogen compound to counteract leaching.
The requirements indicated in this section, except for those pertaining to tanker maintenance and operation shall be made part of any of the agreements between the Contractor and any subcontractors retained by it.
Payment for any work necessary to comply with the requirements of this section shall not be paid for separately, but shall be included in the various contract items.
TS-1.2
Special Conditions Notes
LTB
LTBLTB
LTB
2
Questions or Concerns: The Contractor shall contact DHHL or authorized representative if there are any questions or concerns relating to the Preserves.
1
1 4-14-16Addendum 12SHT. .......
OF .......7