if your business
DESCRIPTION
IF YOUR BUSINESS. DOESN’T LIKE. COMPROMISE. “Get ready to witness Perfection, with no Compromise.”. ATUL PARAKH. BONANZA. INDUSTRIAL PARK. TURBHE. 05 Aug 2013. WITNESS PERFECTION. INDUSTRIAL PARK. TURBHE. 05 Aug 2013. GLIMPSES. DIFFERENT VIEWS. FRONT VIEW. SIDE VIEW. TOP VIEW. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/1.jpg)
NEXTPREV
IF YOUR BUSINESSIF YOUR BUSINESSDOESN’T LIKEDOESN’T LIKECOMPROMISECOMPROMISE
“Get ready to witness Perfection, with no Compromise.”
05 Aug 2013
ATUL PARAKH. BONANZA
TURBHEINDUSTRIAL PARK
![Page 2: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/2.jpg)
NEXTPREV
WITNESS PERFECTIONWITNESS PERFECTION
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 3: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/3.jpg)
NEXTPREV
FRONT VIEW SIDE VIEW TOP VIEW
GLIMPSESGLIMPSESDIFFERENT VIEWSDIFFERENT VIEWS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 4: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/4.jpg)
NEXTPREV
PROJECTHIGHLIGHTSPROJECTHIGHLIGHTS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 5: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/5.jpg)
NEXTPREV
PROJECT HIGHLIGHTSPROJECT HIGHLIGHTSQUALITY LISTING QUALITY LISTING
2500 KGsLOAD BEARING CAPACITY
16 FEETHEIGHT UNITS
2000 KGsGOODS LIFT
05 Aug 2013TURBHEINDUSTRIAL PARK
598-2386SFTAREA AVAILABLE
![Page 6: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/6.jpg)
NEXTPREV
PROJECT HIGHLIGHTSPROJECT HIGHLIGHTSQUALITY LISTING QUALITY LISTING • 16 Feet Height Units
• Heavy Industrial Structure with up to 2500 Kgs load bearing capacity.
• More than 20000SFT floor plate.
• Two Goods lifts and two Passenger Lifts
• Ample Parking space in basement and ground floor.
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 7: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/7.jpg)
NEXTPREV
PROJECT HIGHLIGHTSPROJECT HIGHLIGHTSQUALITY LISTING QUALITY LISTING • More than 50% open area on ground.
• Planned for container/ truck movements without blockage.
• Industrial Electric Power
• Independent bay for loading – unloading near goods lifts.
• Attached Toilet in each unit
• Well planned water and drainage facility.
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 8: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/8.jpg)
NEXTPREV
PROJECT HIGHLIGHTSPROJECT HIGHLIGHTSQUALITY LISTING QUALITY LISTING • Area available from 598 to 2386 SFT and more
• Well interior designer lobby.
• Morden Building Elevation with designer facade
• High-Tech security system with CCTV surveillance
• Well planned, properly lighted spacious corridors
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 9: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/9.jpg)
NEXTPREV
PROJECT HIGHLIGHTSPROJECT HIGHLIGHTSQUALITY LISTING QUALITY LISTING • Advance Fire fighting equipments
• Intercom Facility
• Cafeteria
• Vastu Complied structure
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 10: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/10.jpg)
NEXTPREV
CONNECTIVITY TO THE PARKCONNECTIVITY TO THE PARK
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 11: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/11.jpg)
NEXTPREV
CONNECTIVITYCONNECTIVITYEASY & APPROACHABLEEASY & APPROACHABLE
2KMLocal Railway Station(Turbhe)
4KMVashi Railway Station
1.5KMThane- Belapur Highway
2KMMumbai-Pune Expressway
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 12: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/12.jpg)
NEXTPREV
CONNECTIVITYCONNECTIVITYEASY & APPROACHABLEEASY & APPROACHABLE
18KMNavi Mumbai International Airport (Proposed)
20-25KMOutstation Railway Station (Panvel & Thane)
35KMMumbai Airport
2.50KMNearest residential area
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 13: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/13.jpg)
NEXTPREV
LOCATIONADVANTAGELOCATIONADVANTAGE
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 14: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/14.jpg)
NEXTPREV
LOCATION ADVANTAGELOCATION ADVANTAGE
• In Satellite city of Navi Mumbai
• Near Turbhe and Sanpada Local Railway Station
• Near Thane - Belapur & Sion- Panvel- Pune Highway
• Bus- stop and Shared Auto available cross the road.
• Well planned Infrastructure for Industry by MIDC
05 Aug 2013TURBHEINDUSTRIAL PARK
QUALITY LISTING QUALITY LISTING
![Page 15: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/15.jpg)
NEXTPREV
LOCATION ADVANTAGELOCATION ADVANTAGEQUALITY LISTING QUALITY LISTING • Layout on the 62 mtrs wide road touch plot
• Availability of Industrial Power, Water and CETP
• Well connected and in center of Mumbai, Pune, Thane and Kalyan
• Availability of Industrial Labour.
• Nearby Transport and courier facility.
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 16: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/16.jpg)
NEXTPREV
LAYOUTSLAYOUTS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 17: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/17.jpg)
NEXTPREV
FLOOR PLANSFLOOR PLANS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 18: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/18.jpg)
NEXTPREV
FLOOR PLANSFLOOR PLANS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 19: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/19.jpg)
NEXTPREV
FLOOR PLANSFLOOR PLANS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 20: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/20.jpg)
NEXTPREV
INDUSTRIES WHICH CAN BENEFIT
INDUSTRIES WHICH CAN BENEFIT 05 Aug 2013TURBHE
INDUSTRIAL PARK
![Page 21: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/21.jpg)
NEXTPREV
Packaging and re-packaging
Assembly Lines. Laboratories.
INDUSTRIESINDUSTRIESMINI MICRO & SMALL INDUSTRIESMINI MICRO & SMALL INDUSTRIES
05 Aug 2013TURBHEINDUSTRIAL PARK
Lath Machines, steel cutting moulding and forging
Plastic Moulding Computer Hardware Assembly
![Page 22: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/22.jpg)
NEXTPREV
Electrical Switches Assembly
Printing Corrugated Box
INDUSTRIESINDUSTRIESMINI MICRO & SMALL INDUSTRIESMINI MICRO & SMALL INDUSTRIES
05 Aug 2013TURBHEINDUSTRIAL PARK
Jewellery Making Plastic and metal Mould manufacturing.
Garment
![Page 23: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/23.jpg)
NEXTPREV
IN PICTURESIN PICTURES
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 24: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/24.jpg)
NEXTPREV
IN PICTURESIN PICTURES
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 25: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/25.jpg)
NEXTPREV
IN PICTURESIN PICTURES
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 26: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/26.jpg)
NEXTPREV
IN PICTURESIN PICTURES
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 27: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/27.jpg)
NEXTPREV
GET IN TOUCHGET IN TOUCHEXPERT PANELEXPERT PANELDEVELOPER
Endura Soft Solutions Pvt Ltd.
CORPORATE OFFICEBonanza House,M 2, Cama Industrial Estate, Walbhat Road, Goregaon (E), Mumbai-63
ARCHITECT & RCC CONSULTANTEllwand Consultants Pvt Ltd.
LIASONER Infra Projects Smart Solution
SITE ADDRESSC56/1, TTC Industrial Area, MIDC Turbhe, Navi Mumbai -400706Tel: 27681621/9324567812
05 Aug 2013TURBHEINDUSTRIAL PARK
SALES OFFICE101 -102, Shivji Market, Plot No. 8 - 9, Sec 19 D, Vashi Navi Mumbai – 400705. TELEPHONE: 65611881 -1882
![Page 28: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/28.jpg)
NEXTPREV
LOCATION MAPLOCATION MAP
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 29: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/29.jpg)
NEXTPREV
PROMOTERS & DEVELOPERSPROMOTERS & DEVELOPERS
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 30: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/30.jpg)
NEXTPREV
THANK YOUTHANK YOU
05 Aug 2013TURBHEINDUSTRIAL PARK
![Page 31: IF YOUR BUSINESS](https://reader037.vdocuments.us/reader037/viewer/2022110102/56814101550346895dacc8e6/html5/thumbnails/31.jpg)
NEXTPREV
GET IN TOUCHGET IN TOUCH
05 Aug 2013TURBHEINDUSTRIAL PARK
SALES PERSONALSSALES PERSONALSSuresh Gangale Mobile: 0 9 8 1 9 6 6 7 5 4 8
Balram Singh Mobile : 0 9 8 3 3 6 0 5 0 4 1
Yogesh Jagtap Mobile : 0 9 0 2 9 7 0 5 6 0 5
U m e s h G u p t a M o b i l e : 0 8 2 8 6 5 5 0 5 9 9
P r e m S i n g h M o b i l e : 0 9 9 6 7 0 2 0 0 9 3