HVDC Market Projects and participants with hyperlinks Last revised January 2020 If you would like to update or add to any of the information then please contact us. 31/01/2020 1 www.warwickHVDC.co.uk

Upload: others

Post on 19-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

HVDC Market Projects and participants with hyperlinks

Last revised

January 2020

If you would like to update or add to any of the information then please contact

us.

31/01/2020 1 www.warwickHVDC.co.uk

Page 2: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Electricity prices Business cases for interconnectors are generally (if not always) underpinned by price differentials between two markets. Price differentials generally need to be material and forecast to be sustained over the longer term (15-20 years plus). Short term price differentials are also relevant and can be driven by time zone and generation mix differences. Click the logo below to see the latest electricity price summary reports from the European Commission. Numerous commercial electricity exchanges can provide access to detailed, real-time prices and analysis for Europe and worldwide.

31/01/2020 2 www.warwickHVDC.co.uk

Page 3: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

31/01/2020 www.warwickHVDC.co.uk 3

Interested in any of these projects?

For expert advice, analysis, training, or consultancy, on a long or short-

term basis, please contact us at:

www.warwickhvdc.co.uk

Monthly updates and news will be posted but we also offer retained

support packages from minimum 15 hours per year to keep you fully up to speed with information, opinion and advice in this

market.

Page 4: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC sub sea connections

31/01/2020 4 www.warwickHVDC.co.uk

Page 5: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Channel cable

GreenLink

CelticLink

IceLink

Blyth

Bicker Fen

Exeter

Chilling

Lovedean

Kingsnorth

Sellindge

Zeebrugge

Maasvlakte

Tourbe

GridLink

Conneforde

Peterhead

Germany

Richborough

Grain

NeuConnect

BritIB

IFA

31/01/2020 5 www.warwickHVDC.co.uk

UK & Ireland Interconnectors

Built In Construction In Development

Page 6: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC sub-sea Interconnectors (1)

Project name Website hyperlink Route length

Technology Suppliers Published cost

Completion date

EU or National support?

Latest status

Anglo-French Marine: ~57 km Land: ~8 km

160 MW 100 kV bipole

ABB 1961 - decommission

ed

Decommissioned

IFA IFA Marine: 70 km Land: 15 km

2 GW 270 kV Cable x 8 LCC

GEC, Alstom NEXANS + Prysmian

1986 Complete

BritNed BritNed Marine: 250 km Land: 10 km

1 GW 450 kV MI bipole LCC

Siemens / BAM, ABB

£500m 2012 Complete

Western Link Western Link Marine: 385 km Land: 37 km

2.25 GW 600kV MI bipole

LCC

Siemens, Prysmian

£1.2bn 2018 Complete

Moyle Moyle Interconnector Marine: 64 km Land: 9 km

(500 MW) 2 x 250 kV monopole LCC

NEXANS, Siemens

£150m 2002 Complete

East West East West Interconnector

Marine: 186 km Land: 75 km

500 MW 200 kV XLPE sym.

monopole VSC

ABB ABB

€560m 2012 Complete

Caithness - Moray

Caithness - Moray Marine: 113 km Land: 48 km

1.2 GW 320 kV XLPE VSC

ABB / NKT £970m 2019 Complete

Nemo Link Nemo Link Marine 130 km Land 11 km

1 GW 400 kV XLPE bipole VSC

Siemens Sumitomo

€690m 2019 Complete

NSL* North Sea Link Marine 720 km Land 10 km

1.4 GW 515 kV MI bipole VSC

ABB Prysmian / Nexans

€2bn 2021 EPCI status UK Cap & Floor

Construction

IFA2* IFA2 Marine 208 km Land 32 km

1 GW 320 kV XLPE bipole VSC

ABB Prysmian

> €600m 2020 EPCI status UK Cap & Floor

Construction

Eleclink* Eleclink Tunnel 51 km Land 18 km

1 GW 320 kV XLPE VSC

Siemens / Balfours Prysmian

> €500m 2020 EPCI status UK Cap & Floor

– Exempt

Construction

Viking* Viking Marine 635 km Land 131 km

1.4 GW 525 kV XLPE or MIND

bipole VSC

TBC TBC 2022 EPCI status UK Cap & Floor

Move into construction

phase Awarded

Key

Built In Construction In Development

Whilst this is only a guide please contact us if you would like to update or add to

this information.

31/01/2020 6 www.warwickHVDC.co.uk

Page 7: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC sub-sea Interconnectors (1)

Project name Website hyperlink Route length

Technology Suppliers Published cost

Completion date

EU or National support?

Latest status

Green Link*

Green Link Marine 180 km Land 30 km

500 MW Bipole or sym. Monopole VSC

TBC TBC 2023 EPCI status UK Cap & Floor

Tender live New Directors

FAB Link* FAB Link Marine 180 km Land 49 km

1.4 GW 320 kV 2 x bipole VSC

TBC €1.2bn 2021 EPCI status UK Cap & Floor

Brexit delay Marine licenses secure

Celtic Link * Celtic Link Marine 500 km Land 100 km

700 MW 320-500 kV

TBC €1bn 2025 EPCI status Priority status

EirGrid Consultation EU Funding

GridLink * GridLink Marine: 140 km Land: 14 km

1.4 GW TBC TBC 2022 EPCI status UK Cap & Floor

Tender summer 2019

PQQ started

Key

Built In Construction In Development

Whilst this is only a guide please contact us if you would like to update or add to

this information.

31/01/2020 7 www.warwickHVDC.co.uk

Page 8: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC sub-sea Interconnectors (2)

Key

Built In Construction In Development

Whilst this is only a guide please contact us if you would like to update or add to

this information.

31/01/2020 8 www.warwickHVDC.co.uk

Project name Website Route length Technology Suppliers Published cost

Completion date

EU or National support?

Latest status

NeuConnect* NeuConnect Marine: 650 km Land: TBC

1.4 GW 500kV TBC TBC 2023 EPCI status UK Cap & Floor

Views sought on vital new electricity link for Britain

Tender underway UK connection agreed

AQUIND*

AQUIND Marine: 180 km (estimate)

Land: 60 km (estimate)

2 GW 320kV XLPE 2x sym. monopole VSC

TBC TBC 2021 EPCI status UK Cap & Floor

PQQ underway Statutory consultation on

proposals Planning Inspectorate approval

NorthConnect *

NorthConnect

Marine: 655 km Land: 3 km 1.4 GW 500 kV bipole

or sym. monopole

TBC £1.3bn 2022 EPCI status UK Cap & Floor

Tender underway Marine licences approved

UK onshore consents granted

Channel Cable*

Channel Cable

130 km total 1.4 GW 400 kV bipole

TBC TBC TBC TBC

Atlantic SuperConnection

Altantic SuperConnecti

on

Marine >1000 km Land 10 km (estimate)

1-2 GW >500 kV (estimate)

TBC up to €4bn (estimate)

2025 Concept

IceLink IceLink Marine >1000 km Land 10 km (estimate)

800 MW-1.2 GW >500 kV (estimate)

TBC up to €4bn (estimate)

TBC Concept

BritIB BRITIB Marine >1300 km Land TBC

1.8 GW 525-600 kV bipole VSC multi-terminal

TBC TBC TBC Concept

Western Isles Link*

Western Isles

Marine 80 km 600 MW 320 kV monopole

Tender in final stages

£780m 2021 RIIO Ofgem provisionally reject

Shetland (2) HVDC

Shetland HVDC

Marine: 260 km Land: 10km

600 MW TBC £710m 2024 RIIO R3 CFD not awarded Project future now uncertain

Page 9: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC sub-sea Interconnectors (2)

Key

Built In Construction In Development

Whilst this is only a guide please contact us if you would like to update or add to

this information.

31/01/2020 9 www.warwickHVDC.co.uk

Project name Website Route length Technology Suppliers Published cost

Completion date

EU or National support?

Latest status

Eastern Link* Eastern Link >400 km >500 kV (estimate)

TBC TBC TBC RIIO T2 Early stage tender notice issued

Gallant Gallant HVDC

Marine: ~35km Land: ~35 km

500 MW TBC TBC 2023 Concept

Maali MAALI ~ 400 km 600 MW 320 kV TBC TBC 2025 Concept

MAREX MAREX 1.5 GW (estimate) TBC TBC 2025 Concept

Greenwire North

1 GW Superseded by Greenlink

Greenwire South

1.3 GW Superseded by Greenlink

Page 10: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC wind farm connections

31/01/2020 10 www.warwickHVDC.co.uk

Page 11: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland

HVDC wind farm connections

Project name Website hyperlink

Route length

Technology

Suppliers Published cost

Completion date EU or National support?

Latest status

Seagreen *

Seagreen 65km offshore

25km onshore

1075MW, DC

Nexans - cable

2024 R3 CFD Nexans Supplier

Sofia /* Doggerbank ***

Forewind Marine: >165 km

TBC NKT up to €360M

(estimate)

TBC R3 CFD Registration of Interest for Sofia

NKT Supplier / Update

Key

Built In Construction In Development

Whilst this is only a guide please contact us if you would like to update or add to

this information.

31/01/2020 11 www.warwickHVDC.co.uk

Page 12: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland HVDC OHL connections

31/01/2020 12 www.warwickHVDC.co.uk

Page 13: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

UK and Ireland

HVDC OHL connections

Project name Website hyperlink Route length Technology Suppliers Published cost EU or National support?

Completion date

Key

Built In Construction In Development

Whilst this is only a guide please contact us if you would like to update or add to

this information.

There are currently no overhead HVDC lines in the UK or Ireland

31/01/2020 13 www.warwickHVDC.co.uk

Page 14: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe excluding UK and Ireland

HVDC Interconnectors

31/01/2020 14 www.warwickHVDC.co.uk

Page 15: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC sub-sea Interconnectors (1)

Project name

Website hyperlink Route length Technology Suppliers Published cost Completion date

SACOI 1 & 2 SACOI 140 km 300 MW 200 kV monopole LCC

Alstom GE

1968/1988/1992

NorNed NorNed Marine: 578 km Land: 2 km

700 MW 450 kV bipole

€600m 2008

SAPEI SAPEI Marine: 420 km Land: 15 km

1 GW 500 kV bipole LCC

ABB. PRYSMIAN

€730m 2011

NordBalt Nordbalt Marine: 400 km OHL: 53 km

700 MW 300 kV bipole VSC

ABB €552m 2015

COMETA/Romulo Romulo/COMETA Marine: 240 km Land: 7 km

200 MW 250 kV bipole

Siemens, Prysmian, Nexans

€375m 2012

Baltic Cable Baltic Cable 250 km 600 MW 450 kV

$280m 1994

Greece-Italy (GRITA) GRITA Marine: 160 km Land: 40 km

500 MW 400 kV

ABB Prysmian

2001

Estlink 1 (Finland – Estonia)

EstLink1 105 km 350 MW 150 kV bipole VSC

ABB €110m 2007

Estlink 2 (Finland – Estonia)

EstLink2 Marine: 170 km Land: 12 km OHL: 14 km

650 MW 450 kV monopole

Nexans, Siemens €320m 2014

SwePol SwePol Marine: 239 km Land: 15 km

600 MW 450 kV monopole

ABB 2000

LitPol LitPol Back-to-back convertors

500 MW 400 kV/330 kV

ABB €340m 2015

MONITA MONITA Marine: 433 km 500 kV bipole ABB, NEXANS

€800m 2018

Aland HVDC Aland 158 km 100 MW 80 kV VSC

ABB 2015

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 15 www.warwickHVDC.co.uk

Page 16: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC sub-sea Interconnectors (2)

Project name

Website hyperlink Route length Technology Suppliers Published cost EU or National support?

Completion date

Skagerrak 1&2 Skagerrak 1-3 Marine: 127 km OHL: 113 km

500 MW 250 kV

Alcatel, ABB 1976/2007

Skagerrak 3 Skagerrak 3 Marine: 127 km OHL: 113 km

500 MW 350 kV

Alcatel, ABB 1993

Skagerrak 4 Skagerrak 4 Marine: 140 km Land: 104 km

700 MW 500 kV VSC

Prysmian, Nexans, ABB

2.8bn DKK (approx. €375m)

2014

Fenno-Skan 1 Fenno Skan Marine: 233 km OHL: 33 km

500 MW 400 kV

ABB 1989

Fenno-Skan 2 Fenno Skan Marine: 233 km OHL: 103 km

800 MW 500 kV

ABB 2011

Gotland 1 Gotland Marine: 96 km OHL: 7 km

20 MW/30 MW 100 kV/150 kV

ABB 1957 Decommissioned 1986

Gotland 2 & 3 Gotland 2&3 Marine: 96 km OHL: 7 km

130 MW/150 kV 260 MW/150 kV

ABB 1983 (2) 1986 (3)

Kontek Kontek Marine: 52 km Land: 119 km

600 MW 400 kV monopole

ABB NKT

1995 2016 upgraded

Konti-Skan 1 Konti-Skan 1-2 Marine: 87 km OHL: 86km

250 MW 250 kV

ABB 1965

Konti-Skan 2 Konti-Skan 1-2 Marine: 88 km OHL: 61 km

300 MW 300 kV

ABB 1991

Storebaelt Storebaelt Marine: 32 km Land: 26 km

600 MW 400 kV monopole

Siemens 2010

NordLink * NordLink Marine: 516 km Land: 54 km OHL: 53 km

1400 MW 525 kV MI bipole VSC

Nexans, ABB, NKT €1.5bn - €2bn EPCI status 2020

CobraCable CobraCable Marine: 307 km Land: 22 km

700 MW 320 kV XLPE bipole VSC

Prysmian, Siemens

€621m EPCI status Complete

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 16 www.warwickHVDC.co.uk

Page 17: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC sub-sea Interconnectors (3)

Project name

Website hyperlink

Route length

Technology Suppliers Published cost

Completion date

EU or National support?

Latest status

EuroAsia / Parallel National Greek project

EuroAsia 1500 km Stage 1: 1 GW VSC

Stage 2: 2 GW VSC >400 kV

bipole

TBC €3.5bn 2020/21 EPCI status Project at risk Planning Approved

EuroAfrica EuroAfrica 1707 km 2 GW TBC > €3bn 2020/21 Euro Africa news Elia investment Jan 18

SACOI 3 SACOI 3 200 km (estimate)

400 MW 200 kV bipole VSC

TBC TBC 2023 Project news

ELMED Marine: 192 km

Land: 37 km

600 MW TBC TBC 2022 Feasibility

Italy – Albania Italian projects >1000 MW 400-500 kV

TBC

Italy – Algeria Italian projects TBC

Sicily – Libya Sicily Libya > €220m TBC

NorNed 2 580 km (estimate)

700 MW > 5.3bn NOK (> €640m)

Statnett joins project

NorGer NorGer >600 km 1.4 GW >400 kV

> 12bn NOK (> €1.4bn)

Statnett joins project

Slovenia-Italy Italian projects >1000 MW 350-500 kV

TBC

Italy-Croatia Italian projects TBC

Romania-Turkey

Romania-Turkey

400 km 600 MW 400 kV

€600m Feasibility

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 17 www.warwickHVDC.co.uk

Page 18: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC sub-sea Interconnectors (4)

Project name

Website hyperlink

Route length Technology Suppliers

Published cost

Completion date

EU or National support?

Latest status

Hansa Powerbridge* Powerbridge 300 km 700 MW 300 kV bipole

€600m (estimate)

2025/2026 Consenting

ANAI (Spain/France/UK)

Anai >1500 km 2 GW 2026 TBC

Kontek 2 & 3 Kontek

600 MW 400 kV

> 2030 Feasibility

Great Belt 2 (Stoerbalt 2)

Storebaelt

~ 60 km TBC

Denmark – Poland TBC

Cobra 2 COBRAcable ~ 330 km Est 2035 Concept

LEG1 (Greece, Libya, Egypt)

LEG1 Marine: 347 km Land: TBC

> 2GW 400-500 kV

> €1.6 bn (estimate)

2021 Feasibility

Tunur Phase 1 / 2 (Tunisia)

Tunur Phase 1: 250 MW Phase 2: 2 GW

Authorisation sought

Suedlink SuedLink 4 GW (total) 320 kV XLPE

> €14bn (estimate)

2025 Cost estimate trebles Contract Notice

Project News

Lithuania Poland (Harmony Link) ***

TBC 700MW, VSC 2025 Feasibility Latest Status

Ariadne Interconnection

Adriadne Marine 328km Land 32km

500MWx2, VSC Bi-pole

Est 1bn Euro 2022 Tenders live

Biscay Gulf Biscay-Gulf Marine: 280 km Land: 90 km

2 x 1000 MW bipole

€1.9bn 2025 RTE and REE perform additional analysis to

secure the project Consenting & Surveys Supplier event April

2018

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 18 www.warwickHVDC.co.uk

Page 19: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC off-shore energy projects

31/01/2020 19 www.warwickHVDC.co.uk

Page 20: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC wind farm connections (1)

Project name

Website hyperlink Route length Technology Suppliers Published cost Completion date Latest status

Dolwin 1 Dolwin1 Marine: 75 km Land: 90 km

800 MW 320 kV sym. monopole VSC

ABB 2015 Fully Commissioned

Dolwin 2 Dolwin2 Marine: 45 km Land: 90 km

916 MW VSC ABB 2016 Fully Commissioned

Dolwin 3 Dolwin3 Marine: 80 km Land: 80 km

900 MW 320 kV XLPE bipole

GE, Prysmian

2018 Fully Commissioned

Sylwin1 Sylwin1 Marine: 160 km Land: 45 km

864 MW 320 kV XLPE bipole VSC

Siemens, Prysmian

2015 Fully Commissioned

Borwin 1 Borwin 1 Marine: 125 km Land: 75 km

400 MW 150 kV sym. monopole VSC

ABB €400m 2010 Fully Commissioned

Borwin 2 Borwin 2 Marine: 125 km Land: 75 km

800 MW 300 kV sym. monopole

Siemens, Prysmian

2015 Fully Commissioned

Helwin 1 Helwin1 Marine: 85 km Land: 45 km

576 MW 250 kV sym. monopole VSC

Siemens, Prysmian

2015 Fully Commissioned

Helwin 2 Helwin2 Marine: 85 km Land: 45 km

690 MW 320 kV XLPE VSC

Siemens, Prysmian

2015 Fully Commissioned

Troll A Troll A Marine: 70 km 88 MW + 100MW 60 kV VSC

ABB 2005 + 2015 Fully Commissioned

Borwin 3 Borwin 3 Marine: 130 km Land: 30 km

900 MW Siemens, Prysmian

2019 Fully commissioned

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 20 www.warwickHVDC.co.uk

Page 21: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC wind farm connections (1)

Project name

Website hyperlink

Route length

Technology Suppliers Published cost

Completion date

EU or National support?

Latest status

Modular Offshore Grid (MOG)

MOG Marine: >40 km

800MW/100MW 60kV

ABB Hellenic (Export)

Up to €400m

2020 Expected 2020 Array cables

installed

Dolwin 5+ 6 Dolwin 6 Marine: 45 km

Land: 45 km

900 MW Siemens, Nexans

2023 Under construction

update

Borwin 4 Borwin 4 Marine: 141 km

Land: 30 km

Paused

Borwin 5+6* Borwin 5+6 Development

OST-2-4 OST 2-4 2029

Sylwin 2 Sylwin 2 (no specific

site)

Marine: 160 km

Land: 45 km

Report

South Aegean 1 & 2

South Aegean

600-800 MW €1.8bn 2026 Consenting

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 21 www.warwickHVDC.co.uk

Page 22: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC OHL

31/01/2020 22 www.warwickHVDC.co.uk

Page 23: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Europe ex UK and Ireland

HVDC OHL connections (1)

Project name

Website hyperlink

Route length

Technology Suppliers Published cost

Completion date EU or National support?

Latest status

LitPol litpol 163km 500kV Back to Back

2015 Complete

France - Spain

France-Spain 64km 2GW 320kV XLPE

2x bipole VSC

Siemens Prysmia

n

2014 Complete

LitPol2* LitPol2 Concept

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 23 www.warwickHVDC.co.uk

Page 24: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Global excluding Europe

HVDC Interconnectors, wind farms and OHL

31/01/2020 24 www.warwickHVDC.co.uk

Page 25: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

North America & Canada (1)

Project name

Website hyperlink

Project Type

Route length

Technology Suppliers Published cost

Completion date

Status

Quebec – New England (USA)

Quebec OHL OHL: 1500 km

2 GW (total) Multi-terminal

ABB 1986/1990/ 2016

Commissioned

Neptune (USA) Neptune Subsea 100 km 660 MW 500 kV

Siemens Prysmian

2007 Commissioned

Transbay (USA)

Transbay Subsea 85 km 400 MW 200 kV

Siemens Prysmian

2010 Commissioned

Cross sound (USA)

Cross_sound Subsea 39km 330 MW 150 kV VSC

ABB 2002 Commissioned

Hudson (USA) Hudson OHL Land (& River): 5 km

660 MW 2013 Commissioned

Vancouver Island (Canada)

Vancouver Island Subsea Marine: 33 km

OHL: 42 km

ABB 1968/1977 Partially Decommissioned

Maritime Link (Canada)

Maritime Link Subsea Marine: 170 km

500 MW 200 kV

ABB Nexans

2017 Commissioned

Labrador Island (Canada)

Labrador Island

Subsea Marine: 30 km

OHL: 1070 km

900 MW 350 kV

2017 Commissioned

Bi Pole I, II and III

Manitoba Hydro

OHL Bipole III >1388km

>2GW 500kV

Bi-pole III Siemens

1970’s, 1970’s and 2018

Commissioned

Atlantic Wind Connection (USA)

Atlantic Wind Connection

Wind 1 GW 320 kV XLPE

Bechtel Alstom (GE)

2019 Under Construction

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 25 www.warwickHVDC.co.uk

Page 26: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

North America (2)

Project name

Website hyperlink

Project Type Route length Technology Suppliers Published cost

Completion date

Status

Vermont Greenline (USA)

Vermont Greenline

Sub-sea Marine: 60 km Land: 25 km

400 MW $600m 2020 Bid process open for

future capacity

Maine Greenline (USA)

Maine Greenline

Sub-sea 90 km 1 - 1.2 GW 2020 TBC

Maine Power Express (USA)

Maine Power Express

Sub-sea Marine: 322 km Land: 168

km

1.04 GW 320 kV

TBC Consents being sought

Grain Belt Express (USA)

Grain Belt Express

OHL 1255 km 4 GW $2.3bn Missouri regulators approve

Transwest Express (USA)

Transwest Express

OHL 1000 km 3 GW 600 kV

TBC

Deepwater 1 & 2 (USA)

Deepwater Wind

Wind 1 GW Partnership announced

with National Grid USA

Atlantic Link (USA)

Atlantic Link 1 GW Current Status

Juan de Fuca (USA – Canada)

Juan de Fuca Subsea & Land

Marine: 550 MW ABB TBC

Mexico Mexico BAJA Contract

model

OHL 1500 km 1.4 GW 500 kV

Tender underway

Conference Oct 18

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 26 www.warwickHVDC.co.uk

Page 27: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

North America (3)

Project name

Website hyperlink

Project Type Route length

Technology Suppliers Published cost

Completion date

Status

West Point (USA)

Westpoint Sub-sea 100 km 1000 MW TBC TBC

Champlain Hudson (USA)

Champlain Hudson

Sub-sea 400 km 1000 MW 300-320 kV

bipole

$2.2bn 2021 Mar 18 – strong support expressed by authorities

New England (USA)

New England Sub-sea Marine: 140 km Land: 60

km

1000 MW 300-320 kV

bipole

TBC Feb 18 – officials

express strong support

Sunrise Wind (USA)

Sunrise Wind Wind 880 MW 2024 Current Status Cable Deal

Empire Wind (USA)

Empire Wind Wind 816 MW > $3 billion (estimate)

2024 Current Status

Vineyard Wind ***

Vineyard Wind

Wind 804MW Current Status Latest News

Skipjack Windfarm

Skipjack Windfarm

Wind 2022 Current Status

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 27 www.warwickHVDC.co.uk

Page 28: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

South America

Project name

Website hyperlink

Project Type Route length

Technology Suppliers Published cost

Completion date

Rio – Madeira (Brazil)

Rio-Madeira OHL 2375 km 7.1 GW 600 kV

ABB Alstom

2013/2014

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 28 www.warwickHVDC.co.uk

Page 29: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Africa

Project name

Website hyperlink

Type Route length

Technology

Suppliers Published cost

Completion date

Status

Inga-Kolwezi (D.R. of Congo)

Inga-Kolwezi

OHL 1700 km 560 MW 500 kV

ABB 1982/2009 Commissioned

Cahora Bassa (South Africa – Mozambique)

OHL 1417 km 1.92 GW 533 kV

ZAMCO (~ Alstom, ABB,

Siemens)

1975/1998 Commissioned

Caprivi Link (Namibia)

950 km 300 MW 350 kV VSC

ABB, KEC, Jyoti

~ €306m 2009 Commissioned

Kenya – Ethiopia (Eastern Electric Highway)

1044 km 500 kV Siemens, KEC,

$1bn 2019 Under Construction

Eygpt – Saudi

Egypt Saudi OHL Marine: 16 km

Land: 1500 km

3 GW 500 kV

Tender

Western Power Corridor

Western Power

Corridor

OHL Concept

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 29 www.warwickHVDC.co.uk

Page 30: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

India

Project name

Website hyperlink

Project Type

Route length Technology Suppliers Published cost Completion date

Status

Sileru – Barsoor

OHL 196 km 400 MW 200 kV

1989 Decommissioned

Rihand – Delhi (India)

OHL 816 km 1.5 GW 500 kV

ABB, BHEL $250m 1991 Commissioned

Chandrapur – Padghe

OHL 752 km 1.5 GW 500 kV

ABB, BHEL 1999 Commissioned

Talcher -

Kolar (India)

OHL 1450 km 2.5 GW 500 kV

Siemens 2003 Commissioned

Ballia – Bhiwadi (India)

OHL 780 km 2.5 GW 500 kV

Siemens 2010 Commissioned

Mundra -Haryana (India)

Mundra - Haryana OHL 989 km 2.5 GW 500 kV

Siemens 2012 Commissioned

North-East Agra (India)

OHL 1780 km 8 GW 800 kV

ABB, BHEL 2015 Commissioned

Champa – Kurukshetra

OHL 1287 km Phase I: 3 GW Phase II: 6

GW 800 kV

GE 2017 Phase I Commissioned

Raigarh – Pulagur

1830 km 6 GW 800 kV ABB, BHEL $840m 2019 Under construction

Pulagur – Thrichur

154 km 2 GW 320 kV ABB, BHEL 2020 Under construction

India – Sri Lanka

India Sri Lanka

OHL & Subsea

Land: 235 km Subsea: 50 km

1GW Feasibility complete

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

30 31/01/2020 www.warwickHVDC.co.uk

Page 31: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

China (1)

Project name

Website hyperlink Type Route length Technology Suppliers Published cost Completion date

Yunnan – Guangdong

Yunnan - Guangdong OHL 1418 km 5 GW 800 kV

Siemens 2009

Xiangjiaba – Shanghai

Xiangjiaba – Shanghai

OHL 1980 km 6.4 GW 800kV

Siemens, XD Xi’an Power Rectifier

Works, ABB

2010

Jinping – Sunan Jinping – Sunan OHL 2090 km 7.2 GW 800 kV

ABB $3.5bn 2012

Hami - Zhengzhou

OHL 2192 km 6.4 GW 800 kV

China XD Electric Company

23.4bn CNY (approx. €2.9bn)

2014

Xiluodo – West Zhejiang

OHL 1680 8 GW 800 kV

2014

Irkutsk - Bejing (Russia – China)

OHL 6.4 GW 800 kV

2015

Xiluodo – Hanzhou

OHL 6.4 GW 800 kV

2015

Humeng - Shandong

OHL 6.4 GW 800 kV

2015

Goupitan – Guangdong

OHL 3 GW 2016

Jinsha River 1 OHL 6.4 GW 80 kV

2016

Zhungdong - Chengdu

OHL 11 GW 1100 kV

2016

Jinsha River 2 OHL 6.4 GW 800 kV

2018

Humeng – Liaoning

OHL 6.4 GW 800 kV

2018

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 31 www.warwickHVDC.co.uk

Page 32: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

China (2)

Project name

Website hyperlink

Type Route length

Technology Suppliers Published cost

Completion date

China - Hainan

Hainan Subsea

Nanao 3 terminal (China)

Subsea 32km VSC 3 terminal 200MW 160kV

2013

Zhoushan 5 terminal (China)

Subsea 141km VSC 5 terminal 400MW 200kV

2014

Jinsha River 2 OHL 6.4GW 800kV

2019

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 32 www.warwickHVDC.co.uk

Page 33: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

East and South-East Asia (1)

Project name

Website hyperlink

Project Type Route length Technology Suppliers Published cost

Completion date

Status

Hokkaido – Honshu (Japan)

Hokkaido-Honshu

Subsea Marine: 42 km 300 MW 250 kV

JP Power (Japan) 1979/1980 Commissioned

Kii Channel (Japan)

KII Channel Subsea Marine: 50 km Land: 50 km

1.4 GW 250 kV

Hitatchi 2000 Commissioned

Haenam – Jeju (South Korea)

Haenam Subsea Marine: 96 km Land: 5 km

300 MW 180 kV

Alstom Nexans

1998 Commissioned

Jindo – Jeju (South Korea)

Jindo-Jeju Subsea 105 km 400 MW 250 kV

Alstom LS Cable and System

$415m 2014 Commissioned

Khanom – Koh Samui 1 - 3 (Thailand)

Khanom Subsea 24 km 100 MW 33 kV

Nexans 1996/2007 Commissioned

Leyte – Luzon (Philippines)

Leyte Luzon Subsea Marine: 21 km Land: 430 km

440 MW 350 kV

ABB Marubeni Corp of Japan

Upgrade – NR Eelctric

1996 Upgraded 2013/14

Commissioned

Buk-Dangjin – Godeok (South Korea)

Underground with short

subsea

Marine: 7 km Land: 26 km

1.5 GW 500 kV GE/KAPES Under Construction

Seoul (South Korea)

Seoul OHL 4 GW 500 kV

GE KAPES

$320m 2021

Asia Super Grid (China – South Korea)

Asia Super Grid

Sub-sea TBD TBC

Visayas Mindanao (Philippines)

Link Sub-sea PhP 51.7bn (approx. $1.03bn)

2020 NKT awarded €100m contract

Project News

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

33 31/01/2020 www.warwickHVDC.co.uk

Page 34: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

East and South-East Asia (2)

Project name

Website hyperlink

Project Type

Route length Technology Suppliers Published cost

Completion date

Status

Malaysia – Singapore

Malaysia Singapore

TBC

Sarawak / SARPEN (Malaysia)

Sarawak Sub-sea Marine: 676 km Land: 1000 km

Concept

Java – Sumatra (Malaysia)

Sumatra Java

On hold

Philippines – Saba

TBC

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

34 31/01/2020 www.warwickHVDC.co.uk

Page 35: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Australasia

Project name

Website hyperlink

Type Route length

Technology Suppliers Published cost

Completion date Status

Directlink (Australia)

59 km 180 MW 80 kV VSC

ABB 2000 Commissioned

Murraylink (Australia)

176 km 220 MW 150 kV VSC

2002 Commissioned

Basslink (Australia)

Basslink Subsea 290 km 500 MW 400 kV LCC

Siemens, Prysmian

2006 Commissioned

Inter-Island (New Zealand)

Subsea 617 km 1.2 GW 350 kV bipole

Siemens, ABB

1965/1992/2013 Commissioned

Australia-Singapore Power Link project

Sun Cable

Sub-sea 3750km 2027 Development Project Investor

Basslink 2 + similar schemes*

Concept

Marinus Link Tasmania – Victoria ***

Marinus Link

Sub-sea 1500 MW 2028 Concept

Gippsland coast - Star of the South

Star of the South

Sub-sea Feasibility

Whilst this is only a guide please contact us if you would like to update or add to

this information.

Key

Built In Construction In Development

31/01/2020 35 www.warwickHVDC.co.uk

Page 39: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

Top European construction companies 2018

Click image to see full list

Please contact us if you would like to update or add to this information.

Top UK civil contractors 2018

Click image to see full list

Top 10 biggest construction companies worldwide 2018

Click image to see full list

Civil Contractors

31/01/2020 39 www.warwickHVDC.co.uk

Page 40: If you would like to update or add to any of the ...€¦ · NEXANS + Prysmian 1986 Complete BritNed BritNed Marine: 250 km Land: 10 km 1 GW 450 kV MI bipole LCC Siemens / BAM, ABB

31/01/2020 www.warwickHVDC.co.uk 40

Interested in any of these projects?

For expert advice, analysis, training, or consultancy, on a long or short-

term basis, please contact us at:

www.warwickhvdc.co.uk

Monthly updates and news will be posted but we also offer retained

support packages from minimum 15 hours per year to keep you fully up to speed with information, opinion and advice in this

market.