IEEM 5352 Enterprise Integration. Enterprise Process Modeling and Analysis Tool – INCOME4. Contents. 1. Overview: INCOME process designer 2. Behavior Modeling fundamentals of Petri-nets sequence, preconditions for an activity, branching, refining (drill-down) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IEEM 5352 Enterprise Integration

112/04/19 1

IEEM 5352Enterprise Integration

Enterprise Process Modeling and Analysis Tool – INCOME4

Page 2: IEEM 5352 Enterprise Integration

112/04/19 2

Contents1. Overview: INCOME process designer2. Behavior Modeling

– fundamentals of Petri-nets– sequence, preconditions for an activity, branching,

refining (drill-down)– detailed information for activities

3. Organization Modeling4. Information Modeling5. Linkage of Organization Structure and Behavior

Modeling6. Linkage of Information Model and Behavior Modeling

Page 3: IEEM 5352 Enterprise Integration

112/04/19 3

1. Overview: INCOME process designer • Modeling, documentation and analysis of business

process

(object model, data model)

Page 4: IEEM 5352 Enterprise Integration

112/04/19 4

1. Overview: INCOME process designer(Cont.)

• Model types:– Behavioral model - define process & business

rules: Sequence, Preconditions for an activity, Branching, Refining

– Organization model - Identify personnel roles & resources

– Information model - Define information/data structure

Page 5: IEEM 5352 Enterprise Integration

112/04/19 5

1. Overview: INCOME process designer(Cont.)

• Application Type:– BPR (Business Process Reengineering)– Knowledge Management– Application (software) Development– Introduction of Standard Software– Workflow Management– Simulation Studies– Process Benchmarking (as-is and to-be models

comparison)

Page 6: IEEM 5352 Enterprise Integration

112/04/19 6

2. Behavior Model

Price quote

Pre-sales process

Page 7: IEEM 5352 Enterprise Integration

112/04/19 7

Basic elements of behaviour modelling

• Activities– Portrayed as a rectangle– Objects are

• consumed

• generated

• transported

• modified

by activities.

Page 8: IEEM 5352 Enterprise Integration

112/04/19 8

Basic elements of behaviour modelling

• Object store – Portrayed as a circle– Carrier for objects– Object stores can

• Store objects

• Visualise objects

• Acquire states

Page 9: IEEM 5352 Enterprise Integration

112/04/19 9

Fundamentals of Connections in Petri-Nets

(generates)

Page 10: IEEM 5352 Enterprise Integration

112/04/19 10

Connection Examples•Activity consumes objects from the input store (input connection) in the implementation

Customer order Accept order

•Activity generates objects in the implementation and places these in output store (output connection)

Print delivery note Delivery note

•Activity modifies objects in the connected object store in the implementation (update connection)

Schedule order Free capacity

Page 11: IEEM 5352 Enterprise Integration

112/04/19 11

Example 1• Chemical transformation process

Manufacture of ethaneEthane is produced using hydrogen and ethylene

with platinum as a catalyst.

Page 12: IEEM 5352 Enterprise Integration

112/04/19 12

Example 2

• Production system

UNPROCESSEDORDERS

PROCESSEDORDERS

COMPLETED

ORDERS

MATERIAL

PROCESSINGAT MACHINE 1

PROCESSING ATMACHINE 2

Page 13: IEEM 5352 Enterprise Integration

112/04/19 13

麥芽 麥芽汁 發酵

發酵粉

Page 14: IEEM 5352 Enterprise Integration

112/04/19 14

Page 15: IEEM 5352 Enterprise Integration

112/04/19 15

Petri-Net Presentation (1/3)

Concurrent: Activated by the same event. 同步:兩個或以上的狀態同時由一個事件所啟動 。

T3

Page 16: IEEM 5352 Enterprise Integration

112/04/19 16

Petri-Net Presentation (2/3) Synchronous: Activity must be triggered by

two events. 同時:若該活動需有兩個或以上之狀態成立,方能啟動

Page 17: IEEM 5352 Enterprise Integration

112/04/19 17

Petri-Net Presentation (3/3)

Conflicting: More than one activities can be triggered by one event.

衝突:當狀態被滿足時,下面卻有多個符合的活動等待選擇。

?

?

Page 18: IEEM 5352 Enterprise Integration

112/04/19 18

Activity Triggering

SCREWS

After Triggering

SHEET METALS

NUTS

ASSEMBLYDOORS

WAIST

K(1)

K(1)

SCREWS

SHEET METALS

NUTS

ASSEMBLYDOORS

WAIST

K(1)

K(1)

token

token

Page 19: IEEM 5352 Enterprise Integration

112/04/19 19

Conflict Resolution (1/2)

ProbabilityPARTS

ASSEMBLY1

ASSEMBLY2

PRODUCT1

PRODUCT2

PARTS

ASSEMBLY1

ASSEMBLY2

PRODUCT1

PRODUCT2

70%

30%

解決之道 - 加入機率

Page 20: IEEM 5352 Enterprise Integration

112/04/19 20

Conflict Resolution (2/2)

)condition rule

Page 21: IEEM 5352 Enterprise Integration

112/04/19 21

Business modeling processAnalysis andFormalisation

Behaviormodel

furtherFormalisation

Definition ofObject relatedBusiness rules

INPUT OUTPUT

PROCESSING

INPUTOUTPUT

PROCESSING

InDoc OutDocget_attribute(InDoc, st),st = approved,assign.var(InDoc, OutDoc).

Page 22: IEEM 5352 Enterprise Integration

112/04/19 22

Refining: Drill-down

Page 23: IEEM 5352 Enterprise Integration

112/04/19 23

Refining: Drill-down

Page 24: IEEM 5352 Enterprise Integration

112/04/19 24

Page 25: IEEM 5352 Enterprise Integration

112/04/19 25

Detailedinformation for activities

Page 26: IEEM 5352 Enterprise Integration

112/04/19 26

3. Organization Model

Page 27: IEEM 5352 Enterprise Integration

112/04/19 27

3. Organization Model (Cont.)

• Detail information– the responsible manager– cost center– resources (personnel, technical aids)– a specific cost unit rate can be defined for every

resource type– roles: task-related group

Page 28: IEEM 5352 Enterprise Integration

112/04/19 28

4. Information Model

Page 29: IEEM 5352 Enterprise Integration

112/04/19 29

4. Information Model

Page 30: IEEM 5352 Enterprise Integration

112/04/19 30

5. Linkage of Organization Structure and Behavior Modeling

Page 31: IEEM 5352 Enterprise Integration

112/04/19 31

6. Linkage of Information Model and Behavior Modeling

Page 32: IEEM 5352 Enterprise Integration

112/04/19 32

Process Modeling Case 1Logistic Distribution Center (1/3)

Page 33: IEEM 5352 Enterprise Integration

112/04/19 33INCOME Behavior Model – Top Level

Process Modeling Case 1Logistic Distribution Center (2/3)

Page 34: IEEM 5352 Enterprise Integration

112/04/19 34

Process Modeling Case 1Logistic Distribution Center (3/3)

INCOME Behavior Model – Drilled-down

Store Merchandise

Page 35: IEEM 5352 Enterprise Integration

112/04/19 35

Process Modeling Case 1Logistic Distribution Center (3/3)

INCOME Behavior Model – Drilled-down

Process Orders

Page 36: IEEM 5352 Enterprise Integration

112/04/19 36

• AS-IS model

• TO-BE model

• Final Comments

Business Process Modeling Case 2 Gold bumping wafer company business

process reengineering

Page 37: IEEM 5352 Enterprise Integration

112/04/19 37

AS-IS Organization Model

• Boss: CEO

• Divisions: manufacturing center and QC Center

• Departments: Equipment department, manufacturing process department, I.E. department, quality control department, document management department

Page 38: IEEM 5352 Enterprise Integration

112/04/19 38

AS-IS Organization Diagram

Page 39: IEEM 5352 Enterprise Integration

112/04/19 39

AS-IS Object Model

Page 40: IEEM 5352 Enterprise Integration

112/04/19 40

AS-IS Behavior Model – Top Level

Page 41: IEEM 5352 Enterprise Integration

112/04/19 41

Manufacturing Process Drill-Down

Page 42: IEEM 5352 Enterprise Integration

112/04/19 42

Shipping Process Drill-Down

Page 43: IEEM 5352 Enterprise Integration

112/04/19 43

As-Is Shipping Process Drill-Down

BeforeImprovement 1

BeforeImprovement 2

Page 44: IEEM 5352 Enterprise Integration

112/04/19 44

To-Be Behavior Model (Shipping)

Improvement 1 Improvement

2

Page 45: IEEM 5352 Enterprise Integration

112/04/19 45

Final Comments

• Shorter workflow• Fewer tasks in a given flow• Time reduction• Cost reduction• Less man power