ieee smart village project (isv) - united nations...ieee smart village project (isv) briefing to the...
TRANSCRIPT
IEEE Smart Village Project (ISV)Briefing to the UN-DESA Energy Grant Secretariat
Powering The Future We Want: 2016 UN DESA Energy Grant Participants
Capacity Development Seminar 21- 22 November 2017
Ray Larsen, ISV Chair & Co Founder/ for the ISV Team
IEEE Life Fellow, Past President IEEE Nuclear & Plasma Sciences Society
SLAC National Accelerator Laboratory, US Department of Energy, Stanford University CA
Power a Village,Empower Community
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Outline
1. Introduction: General Background
2. Approach: Problems & Solutions
3. Achievements:
Access to sustainable energy for eradicating poverty and promoting prosperity
4. Obstacles, Barriers and Solutions:
Challenges & Solutions -- technical, managerial, financial, governmental and cultural
5. Future Plans: Scale, Impact, Collaborations
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
1. Introduction: General Background
3
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Mission & Vision
Mission
• IEEE Smart Village integratessustainable electricity, education, and entrepreneurial solutions to empower off-grid communities
Vision
• A world where all people enjoy equal access to electricity and education to grow opportunities and leverage change for themselves and others.
Elementary school near Madan, Papua New GuineaOne of 28 such schools, plus 3 large Secondary schools scheduled to receive electrification, intranet, laptops, tablets, projectors, clean water, and sanitary toilets recycling wastes to manufacture fertilizer product compost -- Collaboration with Rotary International
“There will be no Smart Cities without Smart Villages”
“Power a Village, Empower Community”
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Beginnings: IEEE HTC 2008-10
• 430,000 members, 39 Technical Societies
• 2008 IEEE asks: How can professional membership contribute to poverty eradication?
• Joint IEEE, UN & Vodafone Study group formed
• 2009: 3 Technology Challenges selected
• Reliable Electricity, Interconnectivity, Medical Records
• IEEE Humanitarian Technology Challenge (HTC) formed w/ Volunteers from IEEE Societies, NGOs, UN, other
5
Advancing Technology for Society
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
IEEE HTC Strategy
• Goal: Align with UN MDG (later SDG) Goals
• Market-based, sustainable, scalable enterprises (Sachs Model)
• Engineers develop tech solutions, collaborate with NGOs to demonstrate pilots, hand off to NGOs to develop businesses.
• Results 2010:
• All pilots worked but lacked sustainable business plans
• 2009 parallel community-scale electricity, education & business model group formed as Community Solutions Initiative (CSI) Working Group (later ISV)
• 2010 CSI developed technical model & franchise business plan, aligned with NGO in Haiti (Sirona), shopped for funding, received start from HTC & NPS Society Nov, 2010
• June 2011 Delivered 6 village scale systems to Haiti
• July2012 Delivered 9 systems; business model a success
6
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
2012: Adopted 3 Pillars Model for Success
• 2012 Power Africa Workshop• Workshop reinforced 3 pillars critical to
sustainable scaling:
• Electricity, Education, Enterprise
• 3 new African NGOs join CSI: Nigeria, Cameroon, South Sudan
• Headed by newly minted in-country engineer entrepreneurs
• All had DC Microgrid startups underway
• 2014
• IEEE Foundation supports IEEE Smart Village (ISV) electricity, education & business plan goal of scaling to reach 50M people by 2025
7
“Without broad community-based
education, historically all
sustainable development
efforts will fail”
- Nobel Economist Amartya Sen et al
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
2. Approach: Problems & Solutions
8
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
2. Approach: Problems & Solutions
• Problems: Charity vs. Empowerment
• Historic: Over a trillion dollars spent• Private charity, government-to-government foreign aid programs
have failed to budge ~20% global poor
• Most aid programs not designed to help empower• Big business or government solutions inherent conflicts -- profit
focus, misuse of funds; charity breeds chronic dependency
• Main beneficiaries developed country personnel
• Basic Electricity necessary but not sufficient• Without education, clean water, sanitation, health care, jobs creation
to prosper on community scale, initiatives cannot become sustainable, scalable, community-owned & reinvested
• Reciprocal Learning w/Community vital for Empowerment• Intelligence & energy for transformation lies primarily within
community members themselves. ISV or any other outside force is Change Agent only, not solution
9
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
ISV Solutions
• Build Collaborations & Reciprocal Learning• Community - Help to empower as Key Partner, owner
Entrepreneurs – Sustainable Devmt trained (e.g.. MDP)
• Energy authorities - Civic & Government
• Educators - Teachers, administrators, Universities, schools
• “Beyond the Light Bulb” - WASH programs, healthcare, women’s entrepreneurship, businesses, agriculture
• Investors – Foundations UN, Government, industry, private
• Posner Center for International Development, 80+ NGOs
• Rotary International co-investment partner
• Build Smart Villages• Help bring prosperity, reverse brain drain to big city slums
and overseas for jobs and education
10
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
ISV Solutions
• Continuous Development
• Invest/Seed market-based, community-based solutions at
electricity entry point
• Develop standardized drop-in tech solutions; design for
growth in level of service; adopt successful entrepreneur approaches; IEEE Open Source
• Commercialize modular products in-country for job creation, local supply chains
• Assist entrepreneurs with Total Project Support Teams
(TPSTs) to:
• address all 3 Pillars in proposals & deploy
• design 10-year plan to reach at least 1M people
• achieve sustainable business models, attract new bridge grants, loans, equity investment
11
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Align with UN Sustainable Development Goals – Impact of 3 ISV Pillars
• See web for full list of the 17 proposed sustainable development goals and summaries of their targets
12
SDG Goals IEEE Smart Village Response
Affordable Energy Directly address with Sunblazer modular family of electrification solutions
Quality Education Directly address with local community-based learning & internet delivery model*
No Poverty Seed fund community businesses: financially, technically, socially, & ecologically sustainable
Gender Equality Support women’s empowerment programs, entrepreneurial businesses, financial equality
*Posner Center for International Development, home of IEEE Global Classroom
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Impact of 3 ISV Pillars 2
• See web for full list of the 17 proposed sustainable development goals and summaries of their targets
13
SDG Goals IEEE Smart Village Response
Water & Sanitation Partner with Rotary, Posner Center*; support WASH with energy, education, enterprise
Good Health Partner with Rotary, Posner Center; access to energy, communications for medical clinics
Zero Hunger Support sustainable agriculture with access to energy, communications, education, enterprise
Partnerships for the SDGs
Partner with local entrepreneurs, NGOs, and communities for capacity building to empower 50 million people by 2025
*Posner Center for International Development, home of IEEE Global Classroom
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
3. Achievements: Access to Sustainable Energy for Eradicating Poverty & Promoting
Prosperity
14
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Haiti Project: SunBlazer 2010-12
• SunBlazer Solution Design Principles:
• Standardized, IEEE Open Source system design
• Mobile for instant deployment of SunBlazers, Portable Battery Kits, LEDs
• Market Surveys:
• Conducted by NGO non-profit or for-profit year in advance to show feasibility
• User feedback for product; signed up customers
• Business Model:
• NGO designs 10-yr. plan to serve >1M people
• Franchise village entrepreneurs serve 80+ homes
• IEEE raised seed funds ~$300K from IEEE Societies (NPSS), Region 9, Foundation
• On-ground NGO provides infrastructure, staff
• Results:
• Deployed 15 village systems 2011-12
• Demonstrated sustainable business model serving 1200 homes & 7200 people, created over 30 jobs
15
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen16
SunBlazer Factory & Staging 2010-2012
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen17
15 Haiti Deployments 6/2011 & 8/2012
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen18
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen19
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen20
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Internet/Intranet Education Delivery In-Country Global Classrooms, Learning Centers, Hospitals etc.
Interactive, server based, digital toolbox, laptops, tablets, projectors
21
LDWiFi point-to-point 40-100km Typ.
WiFi Hub 10km Radius Typ.
Internet Satellite Link (Desired but Optional)
Up to 12 Schools Per LDWiFi Node
Example for Papua New Guinea
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen22
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Achievements 1
• Steering Committee Organization
• Development, Finance, Marketing, Education, Technology, Engagement, Operations, Project Development, Country Managers
• Standard on-boarding process
• Standard, evaluation process: 3 Pillars, 10 yr. sustainable plan, financial model
• Review teams assigned to evaluate, SC approves
• Project Development, Operations Committees
• Completes detailed Project Agreement schedule & finances with IEEE Legal; Max award $200K total
• All projects submit to design reviews before funds spent
• Volunteer Total Project Support Teams (TPSTs)
• Team of 3 to advise on 3-Pillar plans, operations
23
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Achievements 2
• Buildup & Collaborations:• Standardized solutions for electricity, education business
delivery, model
• Joined Posner Center for International Development at opening, now 80+ NGOs for Sustainable Development
• Supporting Regis & Posner MDP via IEEE Global Classroom, delivers to remote villages @ 1% US cost
• Adopted Pre-K & up digital education, interconnecting schools Papua New Guinea, Vietnam, then to all projects
• Launched Rotary International fund-matching programin India, planning to expand globally
• Encourage knowledge sharing among all ISV projects
in the Forum for Sustainable Development Committee
24
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Achievements 3
ITEM YEAR ENDING QUANTITY COMMENTS
Villages Installed 2016 34
Villages Projected 2017 40
Beneficiaries Impacted 2016 70,000
Beneficiaries Projected 2017 100,000
Beneficiaries Projected 2018 200,000
New Starts 2017 8 (Fully funded)
New Approved Projected 2017 3 (Not funded)
New Approved Projected 2018 6 (Not funded)
25
The following reflect actual data to end 2016, projections for end 2017-18 Approved = eligible for funding when available.
8 new projects launched 2017, $1.3M committed
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen2626
Country Project/Entre-preneurs
Year
HAITI (Note: Largely lost in Hurricane) 1 2011
NIGERIA 2 2012, 2017
CAMEROON 2 2012, 2017
SOUTH SUDAN 1 2012
ZAMBIA 2 2014, 2016
UGANDA/RWANDA 1 2017
INDIA 3 2015, 2017
PAPUA NEW GUINEA 1 2017
SUBTOTAL 13
Applicants Pending: Kenya, Vietnam, India (3),Zimbabwe, Ghana (2), Burkina Faso, DR Congo,Bangladesh, Ecuador, Egypt, Ethiopia
12+ 2017/2018
TOTAL PROJECTED END 2018 (Exceeds Plan/Budget!) 25+ 2018
Projects Current & Pending
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
4. Obstacles, Barriers, Solutions:Technical, Managerial, Financial,
Governmental, Cultural
27
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Obstacles, Barriers, Solutions 1
Obstacles Description Solutions
Technical
Design Expertise NGOs need guidance Design reviews, TPSTs
Standard prod. Availability
Very slow or no delivery from foreign suppliers
Bid open source designs to local suppliers; create new jobs
Managerial
ISV SC Volunteer loading
Need more vols. w/ time to build, manage committees
Retirees w/ tech & managerial team building experience; via web, media
Project lead inexperience
New Project leads needmanagement assistance
Bi-weekly forums keep all project leads in close contact, sharing
Financial
Project demand exceeds funds
Have $1.5M/yr. plan, need grow to $2.5M/yr.
Expand reach to Rotary, similar foundations, offer market baskets
Investmentcommunity
Favors grid projects over renewables by 99:1 (UN)
Build on successes with multiple ISV players, shop market basket to investors
28
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Obstacles, Barriers, Solutions 3
29
Obstacles Description Solutions
Governmental
Severe import duties, taxes
Can cost >/= 100% of value.
Ship kits, not full assemblies..Take advantage trade free zones
State Dept. Travel Warnings
Restricted access prohibits foreigners
Appoint ex-pats , in-country volunteers to find trusted project leadership
Cultural
Engineers lacksustainable business Ed'n.
Cooperating w/ IEEE on broad program of basics for engineers
Stress that problem is 20% technology, 80% business & education
Language, lack of English
At some level manuals need translation, ESL
Develop IKEA style tech manuals, lots of pics, also translate to local language; start teaching ESL in grade schools
Women denied opportunities
In many cultures women totally denied education
ISV projects support women’s learning centers in India, Uganda, Papua, women-owned cooperatives for agriculture in Uganda-Rwanda
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
5. Future Plans: Scale, Impact, Collaborations
30
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Future Plans
• Fundraising Goals • Adjust plan to live within current fundraising capacity
• Continue toward goal of $2.5M per year, 10 new projects per year –or equivalent- for decade
• Continue developing matching fund plans with Rotary International, India CSR funds, Foundations, Government
• Explore basket funding both seed & investment/loans
• Develop new funds to support Education initiatives (not in initial calculation of $200K/project)
• Marketing• Continue developing “basket” of qualified new
projects to attract new targeted donor funds
• India, Africa, Bangladesh, Ecuador, etc.31
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Future Plans 2
• Education
• Expand collaborations for Education development, Standard business models, for all new projects
• All Projects
• Increase number of Total Project Support Teams of in-country volunteers with ISV USA members
32
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Summary
• ISV has proposals in hand to expand toward initial 10 per yr. goal
• Success of fundraising, TPST support teams, ISV management will drive progress
• Education poised for first major pilot projects, targeted fundraising
• Modest increase of IEEE staff planned when necessary, affordable, but IEEE is volunteer driven organization
• “Extreme Volunteer” resources are on critical path for ISV management and TPST support positions
33
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen
Acknowledgments
• The work presented here is the product of many hands and minds since 2009 and we are honored to thank all the contributors, especially the on-the-ground ISV Entrepreneurs who have seized the dream and are making history.
• Special thanks are due our financial supporters especially two IEEE Societies, Nuclear and Plasma Sciences and Power and Energy, and the IEEE Foundation for their amazing support. Special thanks also to the Posner Center, Regis University and Nextek Power Systems for huge continuing contributions.
• We acknowledge our roots in the IEEE HTC Initiative and thank the visionaries who started it all.
• Finally we thank the UN DESA hosts who have bestowed the honor and privilege of presenting to kindred spirits who follow the same dream of a just and sustainable world.
34
Copyright 2015, IEEE Smart Village Proprietary and Confidential
UN DESA Briefing Nov 21 2017 R. Larsen35