    New Energy Horizons

    Opportunities and Challenges

    Performance of Relaying

    During Wide-area Stressed Conditions

    IEEE Power Systems Relaying Committee

    C12 Working Group Report

    Presented y Pratap !ysoreH"R Engineering In#$

    %uly 2&' 2(12'

    San "iego' C)

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    2/45

    New Energy Horizons

    Opportunities and Challenges

    C12 Working Group

    C*air+ "amir No,osel

    -i#e #*air+ George .artok

    !emers+

    )$ )postolo,/ !$ .ego,i#/ 0$ .e*rendt/ G$ .enmouyal/ !$.loder/ S$ .ra*ma' G$ .runello/ )$ .uanno/ $ Calero/ !$Carpenter/ %$ "e la Ree/ )$ "erona/ W$ Elmore' W$Hartmann/ G$ Henneerg' S$ Horowitz/ S$ Imai/ )$%o*nson/ .$ 0asztenny/ .$ 0ennedy/ P$ 0errigan/ S$ 0im/C$W$ 3iu/ -$ !adani/ P$!ysore/ S$ Saygin' !$ S*a*/ %$Soe*ren/ -$ 4erzia' "$ 4ziou,aras/ !$ -enkata/ S$Ward/"$ Ware/ 4$ Wiedman/ .$ Wosz#zyk

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    3/45

    New Energy Horizons

    Opportunities and Challenges

    C12 WG Report Organization

    "es#ription and detailed analysis o5 #auses t*at lead to widearea disturan#e

    Relay e*a,ior under stressed #onditions

    ield e6perien#e and e6amples

    Solutionsto mitigate undesired operations$ Report a,ailale on t*e PSRC wesite+

    *ttp+77www$pes8psr#$org7

    http://www.pes-psrc.org/http://www.pes-psrc.org/
  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    4/45

    New Energy Horizons

    Opportunities and Challenges

    lackouts

    In#rease in 5re9uen#y o5 maor' #ostly' la#kouts sin#e :;result?@ o5 our de#isions

    )nalysis o5 disturan#es re,eals some #ommon t*reads+

    Prote#tion e9uipment *as *ad maor impa#t on disturan#e propagation+

    )ddress solutions to pre,ent propagationA

    Propagation o5 t*e la#kout #an e arrested

    Restoration time #an e redu#ed

    It is not possile to a,oid multiple #ontingen#y initiated la#kouts'

    *owe,er+

    4*e proaility' size and impa#t o5 wide area

    la#kouts #an e redu#edA

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    5/45

    New Energy Horizons

    Opportunities and Challenges

    !ndesired" !ne#pected Relay

    Operation During a Distur$ance

    Sometimes #ontriutes to t*e propagation$

    )ug$ 1

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    6/45

    New Energy Horizons

    Opportunities and Challenges

    %actors &nfluencing Relay Performance

    During a Wide 'rea Distur$ance

    Conditions not #onsidered in t*e relay

    settings #riteria = !ultiple #ontingen#ies'

    se,ere o,erload #ondition' system ,oltage and

    5re9uen#y e6#ursions eyond t*e normal

    operating range$

    Hidden 5ailures in t*e s#*eme$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    7/45

    New Energy Horizons

    Opportunities and Challenges

    Causes of Wide 'rea Distur$ance

    In,ol,es a #omination o5+

    -oltage instaility7 ,oltage #ollapse

    )ngular instaility

    -oltage7 re9uen#y e6#ursions

    Small Signal Instaility

    Hig* e9uipment loading and *ig* power trans5ers/

    Hig* system unalan#e

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    8/45

    New Energy Horizons

    Opportunities and Challenges

    (oltage &nsta$ility

    Inaility to maintain ,oltage so t*at ot* power and ,oltage are#ontrollale

    4ypi#al s#enario+ *ig* system loading' 5ollowed y a 5ault' line o,erload

    or generators *itting an e6#itation limit

    Grid o,erloads' more rea#ti,e power #onsumed and ,oltages drop

    ollowed y motors stalling at lower ,oltages

    How t*e system gets to t*e knee pointF

    Continuous load growt*

    Generator *its t*e rea#ti,e limit andt*e P- #ur,e s*i5ts

    Contingen#y #auses t*e knee pointF to

    s*i5t to a lower #riti#al load ,alueReal

    Power

    Voltage

    Margin

    Pre-contingencycase

    Post-contingencycase

    PV Curve

    108% Peak- in 3 years

    100% Peak

    Margin

    108% Peak

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    9/45

    New Energy Horizons

    Opportunities and Challenges

    (oltage )#cursions

    lu#tuations eyond t*e a##epted operating range$ Can o##ur due to *ea,y loads' sudden loss o5 load'

    !otor Starting' Swit#*ing operations #apa#itor7

    rea#tors$

    !ore #ontrollale t*an -oltage instaility7#ollapse$

    3ong term ,ariations = se,eral minutes$

    S*ort term = 1(82( ms or 5ew #y#les/ E6#ursions are

    typi#ally larger t*an long term ,ariations su#* as

    t*ose during 5aults$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    10/45

    New Energy Horizons

    Opportunities and Challenges

    *ransient 'ngular &nsta$ility

    Caused y t*e rotor dynami#s o5generators w*en t*ey a##elerate at

    di55erent speeds

    ut8o58Step Relaying

    "o not trip on re#o,erale swings

    Separate t*e out o5 step segments

    Separate to mat#* generation and load

    "etailed staility studies re9uired

    "ete#ting t*e multi8area out8o58step may

    e re9uired

    P

    0 180

    Equal-area: A1 > A !> insta"ility

    Fault

    0

    CR

    L

    PF

    Pre-fault

    A1

    Post-fault

    A

    P0

    PC

    R

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    11/45

    New Energy Horizons

    Opportunities and Challenges

    Small Signal &nsta$ility

    Inaility o5 power system to restore a state o5 e9uilirium5ollowing a small disturan#e$

    Primarily due to Generator rotors swinging relati,e to one

    anot*er$

    ($181 HD etween inter8area$

    182 HD 8 lo#al plant mode$

    ndamped os#illations #an rea#* #ontrol limits or result in

    prote#ti,e relay operation$

    Power System Stailizers >PSS@ o55set negati,e dampingand supplement e6#itation #ontrol$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    12/45

    New Energy Horizons

    Opportunities and Challenges

    +ig, )uipment .oading and +ig,

    Po/er *ransfers

    Stressed #onditions o5ten o##ur at or near t*esystem peak load$

    4*is #ould e poor power 5a#tor loads generating

    *ig* #urrent 5low t*roug* e9uipment$ Hig* temperatures may result in #ondu#tor sag

    and insulation 5ailures propagating t*edisturan#e$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    13/45

    New Energy Horizons

    Opportunities and Challenges

    Cold .oad Pickup

    3oss o5 load di,ersity a5ter a long outage$

    Cold load pi#k up is t*e inrus* #urrent during

    restoration o5 load$

    Inrus* #urrent #ould e se,eral times t*e normalload$

    Can #ause o,er#urrent relay operation$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    14/45

    New Energy Horizons

    Opportunities and Challenges

    %reuency )#cursion

    ##urs due to imalan#e o5 generation and load$

    Caused y ,ariation in load or generation/ system

    5aults or line swit#*ing$

    E6#essi,e load #auses de#line in 5re9uen#y$ E6#essi,e generation #auses in#rease in 5re9uen#y$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    15/45

    New Energy Horizons

    Opportunities and Challenges

    +ig, System !n$alance

    Current nalan#e due to asymmetry o5 transmission

    line #on5igurations = E6$8untransposed lines$

    Hea,y loading generates neg$ se9$ #urrent as *ig* as

    1& and zero se9$ #urrent as *ig* as 1( o5 t*e pos$

    se9$ #urrent$

    "uring single pole tripping #onditions$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    16/45

    New Energy Horizons

    Opportunities and Challenges

    Protection e,a0ior During Stressed

    Conditions

    4*e report addresses issues wit* t*e 5ollowing+

    4ransmission line prote#tion

    4rans5ormer prote#tion

    Generator Prote#tion

    .us Prote#tion

    S*unt Rea#tor7 Capa#itor Prote#tion

    eeder Prote#tion !otor Prote#tion

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    17/45

    New Energy Horizons

    Opportunities and Challenges

    &mpact of %reuency )#cursion

    55 =nominal 5re9uen#y operation a55e#ts most o5 t*e

    mi#ropro#essor8ased relays$

    Relays make use o5 5undamental 5re9uen#y#omponents 5or t*eir prote#tion 5un#tion$

    P*asor estimation te#*ni9ues in !i#ropro#essor8

    ased relays work well at nominal 5re9uen#y$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    18/45

    New Energy Horizons

    Opportunities and Challenges

    %reuency Response of t,e %ull-cycle

    %ourier P,asor )stimator

    50 100 150 200 250 300 3500

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    GAIN

    frequency, Hz

    Nominal Frequency

    Upper Envelope

    Lower Envelope

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    19/45

    New Energy Horizons

    Opportunities and Challenges

    P,asor )stimation- Off-nominal

    %reuency Response

    50 100 150 200 250 300 3500

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    GAIN

    frequency, Hz

    Off-Nominal Frequency

    The estimated magnitude oscillatesbetween the upper and lower envelopes

    momentary overestimation

    momentary underestimation

    8 re9uen#y 4ra#kingalgorit*ms areslow7 may stoptra#king during adisturan#e$

    8 E55e#t on Currentdi55erentials#*emes arein#onse9uential$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    20/45

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    21/45

    New Energy Horizons

    Opportunities and Challenges

    +ea0y O0erloads

    !ay result in 5aults lines sagging into trees or e9uipmentdamage

    "istan#e relays pi#k up i5 o,erloads not relie,ed 8 Done B

    tripping as Relay dete#ts t*is as t*ree p*ase 5ault

    4*ermal line prote#tion' usually not widely used in t*e S

    R

    X

    ZLoad

    ZArc

    ZLine

    Zone 2

    Zone 3

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    22/45

    New Energy Horizons

    Opportunities and Challenges

    .oad )ncroac,ment .ogic

    !et*ods ),ailale

    to pre,ent relay

    operation 5or loads

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    23/45

    New Energy Horizons

    Opportunities and Challenges

    one Summary

    Done B #annot e aritrarily remo,ed wit*out re,iewing #on#rete prote#tionappli#ations and alternati,es

    Prote#tion )ppli#ations and Settings S*ould not inter5ere wit* peration

    Condu#tor 4*ermal Ratings' Sagging' and Re8rating

    New installations or upgrades using mi#ropro#essor relays #an minimize

    e55e#ts o5 load en#roa#*ment

    W*ere #on5li#t etween impedan#e set points and load en#roa#*ment use

    alternati,e prote#tion met*ods

    "ire#t 4rans5er 4rip

    3ine di55erential relays

    se o5 adapti,e prote#tion or multi8setting groups

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    24/45

    New Energy Horizons

    Opportunities and Challenges

    Po/er S/ing Detection and

    'pplication of Relays

    Slow -ariation o5 -oltage and #urrent instead o5 astep #*ange during 5aults$

    4*ree p*ase alan#ed p*enomenon$

    Power swings may #ause unwanted Relay operationsat lo#ations t*at #an lead to #as#ading outages$

    Relay appli#ations on transmission lines 5or powerswing lo#king and out o5 step #onditions are #o,ered

    in dept* in t*e report produ#ed y IEEE PSRC a5ter)ugust 1

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    25/45

    New Energy Horizons

    Opportunities and Challenges

    Po/er S/ing locking Relay 3PS4

    PS. = dis#riminates etween 5aults and power swings >Stale

    and unstale@$

    .lo#ks relay elements prone to operate during stale and

    unstale power swings$ )llows relay elements to operate during 5aults or 5or 5aults t*at

    e,ol,e during ut o5 step #onditions$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    26/45

    New Energy Horizons

    Opportunities and Challenges

    Out of Step *ripping Relay 3OS*4

    "is#riminates etween stale and unstale power

    swings$

    Initiates system area separation at pre8determined

    points to maintain staility$

    Prote#tion p*ilosop*y is simple ut' proper

    implementation re9uires transient staility studies$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    27/45

    New Energy Horizons

    Opportunities and Challenges

    Out of Step Relay C,aracteristics

    Narrow Juadrilateral 5un#tion

    R

    X

    a

    R

    X

    b

    R

    X

    c

    R

    X

    d

    dR

    dX

    Bus R

    Bus S

    Swing locus

    X

    R

    #a$

    Finite tie inside t!e

    narrow "uad #one

    Bus R

    Bus S

    Swing locus

    X

    R

    #"$

    $!en fault t!e locus

    sto%s at t!e fault

    %osition

    Bus R

    Bus S

    X

    R

    #c$

    Selecti&e #one

    Bus R

    Bus S

    X

    R

    #$

    'e%endabilit( for

    close in faults) sall

    o&ertri%%ing s%ots

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    28/45

    New Energy Horizons

    Opportunities and Challenges

    'pplication of Super-imposed

    Component

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    29/45

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    30/45

    New Energy Horizons

    Opportunities and Challenges

    Distance Relay Operation During

    Off-nominal %reuency

    -

    nI D

    I

    nP I D -=

    !PC3 -=

    IZs

    IR

    IX

    -

    nI D

    I

    nP I D -=

    !PC3 -=

    IZs

    IR

    IX

    B((

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    31/45

    New Energy Horizons

    Opportunities and Challenges

    Solutions- %reuency *racking and

    Compensation

    Numeri#al relays adapt estimation algorit*ms to

    maintain a##ura#y during slow #*anges in

    5re9uen#y$

    Suggested met*ods 5or memory polarized relays+!emory ,oltage is used

    nly during 5ault #onditions wit* t*e use o5 5ault

    dete#tors$

    nly i5 t*e a,ailale ,oltage is elow a le,el$

    O i i S

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    32/45

    New Energy Horizons

    Opportunities and Challenges

    Ot,er *ransmission Sc,emes and

    'pplications

    Current di55erential )symmetri# C*annel delays may #ause misoperation

    Harmoni#s or 5re9uen#y de,iation may a55e#t

    depending on t*e 5iltering te#*ni9ue used$

    Generally not a55e#ted y ot*er stressed #onditions$

    Parallel lines

    !ulti84erminal and 4apped lines

    Series #ompensated lines

    Hig* speed #ommuni#ation s#*eme #onsiderations

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    33/45

    New Energy Horizons

    Opportunities and Challenges

    *ransformer Protection

    4*ermal Pro,ides prote#tion against loss o5 li5e o5 t*e trans5ormer

    sed 5or tripping i5 top oil or Winding 4emperaturee6#eeds a set point

    ,er#urrent ,erload prote#tion > Some degree o5 t*ermal

    Prote#tion@$

    4ypi#ally set to 1B( to 2(( o5 t*e top rating$

    !ay operate during temporary o,erloads$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    34/45

    New Energy Horizons

    Opportunities and Challenges

    *ransformer *,ermal" O0ercurrent

    Relay Solutions

    Super,isory #ontrol a#tion ased on top oil and windingtemperature allowing loss o5 li5e during stressed #onditions

    will pre,ent tripping during temporary o,erloads$

    Se#ond di55erential s#*eme pro,ides re9uired redundan#y

    instead o5 using o,er#urrent relays$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    35/45

    New Energy Horizons

    Opportunities and Challenges

    *ransformer O0er )#citation

    Protection

    4rans5ormer di55erential relays not e9uipped wit* 5i5t*

    *armoni# restraint may trip$

    4*e restraint may lo#k operation resulting in 5ailure o5

    t*e trans5ormer$ =)ug$1(' 1;;M Cali5ornia disturan#e

    resulted in 5our 2B( k- trans5ormer 5ailures during o,er

    ,oltage 7under85re9uen#y #onditions$

    Re#ommended to use -7HD prote#tion on all

    trans5ormers$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    36/45

    New Energy Horizons

    Opportunities and Challenges

    *ransformer Differential Protection

    ses 2nd '

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    37/45

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    38/45

    New Energy Horizons

    Opportunities and Challenges

    Generator Protection &ssues5 con6

    3oss o5 ield Prote#tion 8 Pi#ked up during stalepower swings$ Were not #oordinated wit* e6#itation

    #ontrol and limit settings$

    nder re9uen#y relays = were not #oordinated wit*

    manu5a#turer re#ommendation on low 5re9uen#y

    turine operation$ Not re9uired on Hydro units$ No

    ,oltage super,ision

    nknown #auses due to la#k o5 data re#orders$ IEEE PSRC wesite 8 Per5orman#e o5 Generator prote#tion

    during maor system disturan#eF

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    39/45

    New Energy Horizons

    Opportunities and Challenges

    Generator Relay Coordination

    )normal -oltage Prote#tion = !ust #oordinatewit* #ontrol systems allowing operation o5generator and e6#itation system outside t*eirsa5ety limit$

    .a#kup prote#tion =3imit t*e rea#* o5 t*ese relaysto #oordinate settings wit* o,erload$ S*ould#oordinate wit* us relays and reaker 5ailurerelays$

    or ,oltage #ontrolled relays' t*e ,oltage setting is setelow t*e lowest system operating ,oltage$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    40/45

    New Energy Horizons

    Opportunities and Challenges

    Generator Relay Coordination

    3oss o5 ield Prote#tion+ Can trip on re#o,erale powerswing$ Studies needed to determine t*e re9uired time

    delay$

    ,er E6#itation+ -7HD relay s*ould e #oordinated wit*

    generator and trans5ormer #apailities and wit* !inimumE6#itation 3imit #ontrol$

    ut o5 Step = System studies needed to determine proper

    setting$ 4ypi#ally set to trip only on unstale swings$

    nder re9uen#y load s*edding relays s*ould e#oordinated wit* generator under 5re9uen#y relay$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    41/45

    New Energy Horizons

    Opportunities and Challenges

    us Protection

    "i55erential prote#tion$

    C4 saturation dete#tion may lo#k relay during *ig*

    #urrent 5lows$

    )dapti,e prote#tion s#*eme is proposed in t*e report touse 2 out o5 BF ,oting s#*eme during system stressed

    #onditions$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    42/45

    New Energy Horizons

    Opportunities and Challenges

    Ot,er Protection Sc,emes

    eeder Prote#tion = !ay operate under #old load pi#k up

    #onditions$ Settings are #oordinated to pre,ent operation

    during t*is situation$

    !otor Prote#tion = impa#ted y anormal ,oltage or

    5re9uen#y operation$ IEEE guide to !otor Prote#tion

    addresses t*ese issues$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    43/45

    New Energy Horizons

    Opportunities and Challenges

    &mpro0ing Protection Performance

    Prote#tion #oordination studies a#ross regions and wit*in in t*e

    region$

    #oordination wit* e9uipment #ontrol and prote#tion

    Study and re,iew prote#tion designs on a regular asis' as system

    #onditions #*ange

    ),oid *idden 5ailures y ade9uate testing o5 not only indi,idual

    relays' ut also o,erall relay appli#ations

    In#rease t*e se#urity o5 prote#tion design in t*e areas ,ulneraleto la#kouts

    -oting s#*emes are implemented y some utilities$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    44/45

    New Energy Horizons

    Opportunities and Challenges

    Conclusions

    Prote#ti,e systems are o5ten in,ol,ed in maor wide

    area disturan#es' sometimes pre,enting 5urt*er

    propagation and sometimes #ontriuting to t*e

    spread$ 4*e report identi5ies key system #onditions t*at

    a55e#t t*e prote#tion per5orman#e' des#ries pro,en

    met*ods and re#ommendations to impro,e t*e

    prote#tion per5orman#e$

  • 8/9/2019 Ieee Pes Gm 2012 Pgm Presentation

    45/45

    New Energy Horizons

    Opportunities and Challenges

    7uestions8