ieee 802.15-14-0587-00-004r15- 13-0310-00-004q submission sept 2014 b. rolfe (bca)slide 1 project:...
TRANSCRIPT
![Page 1: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/1.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Sept 2014
B. Rolfe (BCA)Slide 1
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: TG4r Sept 2014 next stepsDate Submitted: Sept 2014Source: SS Benjamin Rolfe (BCA)
Abstract: Plan for next steps for near term activity
Purpose: Overview of activities
Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.
![Page 2: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/2.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Next Steps and Support of TG 4r Sessions
Sept 2014
B. Rolfe (BCA)Slide 2
September 2014
![Page 3: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/3.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Sept 2014
B. Rolfe (BCA)Slide 3
Suggested Next StepsUpdate Call for Proposal Time Lines
• Extend time line for call for intend to Sept’14
• Extended Time Line for Call for Preliminary Proposal – • Complete TGD and issue CPP prior to November meeting (early
responders)
• Extend time to hear preliminary proposals to Jan ’15
• Extend Time Line for Call for Final Proposal – Jan ‘15 Meeting(Can begin presentations in January for early responders)
Sept ’14 to Nove’14
• Consolidate into formal TGD over 2 conference calls• Target to issue TGD and CPP 2 weeks prior to November meeting
• Discus schedule on the email reflector
.
![Page 4: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/4.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Sept 2014
B. Rolfe (BCA)Slide 4
Next StepsNovember 2014 Meeting:
• Review presentations from “early responders”
• Technical discussion to support proposal collaboration and development
.
![Page 5: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/5.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Sept 2014
B. Rolfe (BCA)Slide 5
OutlookYear 2014 2015
Month 3 5 7 9 11 1 3 5 7 9 11
Approval of PAR and CSD
Technical Guidance Document
Call
for Proposal
Call for Interest
Call for Preliminary Proposals
Presentation of Preliminary Propos.
Call for Final Proposals
Drafting
Presentation of Final Proposals
Alignment of Proposals
Build the first Draft for WG Ballot
WG Letter Ballot
Sponsor Ballot
![Page 6: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/6.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Next Steps to Complete TGD – Chapters to Complete
• Review changes made in Athens• Complete Application Requirements Matrix• Frequency Bands and related Regulations• Clarify additional guidance, if necessary
• Coexistence, Interoperability• Benchmarks, Channel Characteristics• Review suggestions made in Athens
• Complexity and Cost considerations
Sept 2014
B. Rolfe (BCA)Slide 6
![Page 7: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/7.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Chapter: Application Requirements Matrix
• Merge content from 15-14-0391-00-004r-technical-guidance-document-input-for-ami.ppt into this chapter
• Collect more input from: • TG4s – SRU – need specific questions to TG4s
Sept 2014
B. Rolfe (BCA)Slide 7
![Page 8: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/8.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Chapter: Frequency Bands and related Regulations
• Suggestion in Athens• Include in High Level Requirements for proposals
that the proposal should indicate the band or bands targeted for operation, if any;
• No further guidance or constraints on bands are needed at this time.
Sept 2014
B. Rolfe (BCA)Slide 8
![Page 9: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/9.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Chapter: Coexistence, Interoperability
• Incorporated coexistence criteria into the High Level Requirements for propsoals• Proposals to present coexistence characteristics• Compare and contrast during technical review
Sept 2014
B. Rolfe (BCA)Slide 9
![Page 10: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/10.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Chapter: Benchmarks, Channel Characteristics
• Suggestions from Athens• Review models developed by past TGs and apply
one or more existing models by reference• It was suggested a particularly good model was done
for TG4a (15-04-0662-04).
Sept 2014
B. Rolfe (BCA)Slide 10
![Page 11: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/11.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Chapter: Complexity and Cost considerations
• No new input
Sept 2014
B. Rolfe (BCA)Slide 11
![Page 12: IEEE 802.15-14-0587-00-004r15- 13-0310-00-004q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area](https://reader035.vdocuments.us/reader035/viewer/2022072016/56649ef25503460f94c045ab/html5/thumbnails/12.jpg)
IEEE 802.15-14-0587-00-004r15-13-0310-00-004q
Submission
Chapter: Energy and Power Consumption
• Added new text from doc #15-14-0556-00 plus input from the task group discussion, incorporated text into TGD.
Sept 2014
B. Rolfe (BCA)Slide 12