idea-b lea maintenance of effort (moe) fy 2014 and beyond

42
IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond Texas Education Agency (TEA) Division of Federal Fiscal Compliance and Reporting November 2013 Modified by Region One ESC April 11, 2014 based on new guidance.

Upload: tarala

Post on 24-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond. Texas Education Agency (TEA) Division of Federal Fiscal Compliance and Reporting November 2013 Modified by Region One ESC April 11, 2014 based on new guidance. Topics. Federal Law Four Test Methods Calculation Methodology SHARS - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

IDEA-B LEAMaintenance of Effort (MOE) FY 2014 and Beyond

Texas Education Agency (TEA)Division of Federal Fiscal Compliance and ReportingNovember 2013

Modified by Region One ESC April 11, 2014 based on new guidance.

Page 2: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Federal LawFour Test MethodsCalculation MethodologySHARSOSEP Boundy Letter

Topics

Page 3: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Federal Statutory ExceptionsMOE Voluntary ReductionState ReconsiderationsTimelineResources and Guidance

Topics

Page 4: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Required by federal law:34 Code of Federal Regulations

(CFR) §300.203

(Handout #1)

IDEA-B LEA MOE

Page 5: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Requires LEAs to expend the same amount of local/state funding for special education and related services as it expended in the previous fiscal year

(Handouts #1 and #2)

IDEA-B LEA MOE

Page 6: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

LEA must pass one of four tests:1. Total State and Local

Expenditures2. Per Capita State and Local

Expenditures3. Total Local Expenditures4. Per Capita Local Expenditures(Handout #2)

Four Test Methods

Page 7: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

1. Total State and Local Expenditures:◦PEIMS record 032 Fund Codes 199 and/or 420 Function Codes:11, 12, 13, 21, 23, 3132, 33, 34, 36, 41, 51, 53

PICs 23 and 33(Handout #3)

Calculation Methodology

Page 8: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

1. Total State and Local Expenditures (continued):◦PEIMS record 033 Fund 437, PIC 23 and 33◦Less SHARS Medicaid Cost Share (calculated state/local share)

(Handout #3)

Calculation Methodology

Page 9: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

SHARS Medicaid Cost Share◦Cost Share may not be used for more than one program ◦TEA calculates SHARS Medicaid Cost Share and deducts amount to arrive at Total State and Local Expenditures

(Handouts #3 and #4)

Calculation Methodology

Page 10: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

R5931 School Health and Related Services (SHARS)◦Funds received represent reimbursements to the

LEA for school-based health services provided to students in the Medicaid Program

◦Expenditures associated with SHARS reimbursements will be subtracted from Special Education expenditures for MOE purposes

◦Expenditures subtracted comprise the state/local Medicaid Cost Share Amount

(Handout #4)

SHARS – FASRG - Coding

Page 11: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

The LEA may expend SHARS reimbursements on Special Education Services.

SHARS reimbursements will not be considered “state and local” funds for MOE

If the LEA chooses to spend the SHARS reimbursement on special education, the LEA must account for that expenditure separately from the state and local expenditures for MOE purposes.

The LEA must document the subsequent expenditure and provide that information to TEA as an IDEA-B MOE state Reconsideration, so it is not counted for MOE.

(Handout #4)

SHARS – FASRG - Coding

Page 12: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

2. Per Capita State and Local Expenditures:◦Total State and Local Expenditures/Special Education Student Count (PEIMS Record 163, Child-Count Funding Type 3)

(Handout #3)

Calculation Methodology

Page 13: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

3. Total Local Expenditures Imputed using:◦Total State and Local Expenditures◦Summary of Finance Data: Special Education AllotmentTotal Tier ILocal Fund Assignment(Handout #3)

Calculation Methodology

Page 14: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

4. Per Capita Local Expenditures:◦Total Local Expenditures/Special Education Student Count (PEIMS Record 163, Child-Count Funding Type 3)

(Handout #3)

Calculation Methodology

Page 15: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Compare Current Year:To Previous Prior Year, if non-compliant in prior year

(Handout #5)

OSEP Boundy Letter

Page 16: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

LEA example: Compliant

LEA example: Non-Compliant

(Handout #6)

IDEA-B MOE Determination Report

Page 17: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Five exceptions cited:

34 CFR §300.204

(Handouts #2 and #7)

Federal Statutory Exceptions to MOE

Page 18: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Voluntary departure of Special Education personnel – 34 CFR §300.204 (a)

(Handout #8)

Exception A:

Page 19: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Decrease in the enrollment of children with disabilities – 34 CFR §300.204 (b)

(Handout #8)

Exception B:

Page 20: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Termination of an exceptionally costly program (obligation to particular student) – 34 CFR §300.204 (c)

(Handout #8)

Exception C:

Page 21: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Termination of costly long-term purchases, such as the acquisition of equipment - 34 CFR §300.204 (d)

(Handout #8)

Exception D:

Page 22: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Assumption of cost by the high cost fund – 34 CFR §300.204 (e)

(Handout #8)

Exception E:

Page 23: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

MOE Voluntary Reduction

34 CFR 300.205(a) permits the LEA, if it chooses, to reduce MOE by up to half the increase in its IDEA-B Formula § 611 allocation from the previous year

(Handouts #7 and #8)

Page 24: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

MOE Voluntary ReductionThree Eligibility Criteria:

1. Increase in IDEA-B Formula Entitlement from previous year

2. “Meets Requirements” LEA Determination under §616 of IDEA

3. Not identified with “Significant Disproportionality” under 34 CFR §300.646

(Handouts #7 and #8)

Page 25: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

MOE Voluntary Reduction and CEIS interconnection◦34 CFR § 300.226(a)◦34 CFR § 300.205(d)

(Handouts #7, #8, and #9)

MOE Voluntary Reduction

Page 26: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

If LEA elects to do only MOE Voluntary Reduction:◦ Amount available may not exceed 50% of increase in IDEA-B Formula funding (§ 611 IDEA-B)

(Handouts #7, #8, and #9)

MOE Voluntary Reduction

Page 27: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

If LEA elects to do only CEIS:Amount available may not be more

than 15% of IDEA-B allocation (§611 and 619 IDEA-B)

(Handouts #7, #8, and #9)

MOE Voluntary Reduction

Page 28: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

If the LEA is both setting aside funds for CEIS and voluntarily reducing its MOE, the LEA should determine the lowest amount.

(Handouts #7, #8, and #9)

MOE Voluntary Reduction

Page 29: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

LEA chooses to do both MOE and CEIS: LEA determines lowest amount:◦the amount available for CEIS

set-aside (15%), or◦the amount available for voluntary

MOE reduction (50%) Combined, the CEIS set-aside and MOE

reduction may not exceed the lowest amount.

(Handouts #7, #8, and #9)

MOE Voluntary Reduction

Page 30: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Significant PEIMS Errors◦Must change compliance status◦Will not change PEIMS data◦Replaces PEIMS in FFCR database ONLY

(Handouts #2, #3 and #8)

State Reconsiderations

Page 31: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Federal Funds Which May be Considered as State or Local Funds

(Handouts #2, #3 and #8)

State Reconsiderations

Page 32: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Legislatively Mandated Changes to Account for Funds

(Handouts #2, #3 and #8)

State Reconsiderations

Page 33: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Significant Timing Issues◦SHARS◦Change in fiscal year◦Extraordinary item◦Other

(Handouts #2, #3 and #8)

State Reconsiderations

Page 34: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

SHARS federal reimbursement expended in Special Education◦Fund codes 199, 420, and/or 437◦PIC 23

(Handouts #2, #3 and #8)

State Reconsiderations

Page 35: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Preliminary determination issuedLEA has opportunity to respond

(30 calendar days to respond)TEA review (up to 45 days)Final determination issuedEnforcement Action, if appropriate

(Handout #11)

Timeline for IDEA-B LEA MOE

Page 36: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Includes instructions, worksheets, and examples for FY2014 and beyond

Serves as estimation/planning tool for LEAs

(Handout #10)

IDEA-B MOE Determination Calculation Tool

Page 37: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

34 CFR 300.203(b)(2) - An LEA that relies on paragraph (b)(1)(i) of this section for any fiscal year must ensure that the amount of local funds it budgets for the education of children with disabilities in that year is at least the same, either in total or per capita, as the amount it spent for that purpose in the most recent fiscal year for which information is available and the standard in paragraph (b)(1)(i) of this section was used to establish its compliance with this section.

(Handout #1)

IDEA-B Eligibility Requirement

Page 38: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Special Education Consolidated Application Egrant Schedule (Handout #11)

Page 39: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Payment must be made with state/local funds

LEAs have 30 days to refund amounts due

LEAs should not send refunds until requested by TEA

Enforcement

Page 40: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

FFCR IDEA-B LEA MOE webpage:◦IDEA-B LEA MOE Guidance

Handbook◦IDEA-B LEA MOE Determination Tool

and Instructions◦CEIS Handbook◦SHARS Handbook◦OSEP Boundy Letter◦Additional Resource Links

Resources and Guidance

Page 41: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

For questions, please send an email to

[email protected]

Additional Questions?

Page 42: IDEA-B LEA Maintenance of Effort (MOE) FY 2014 and Beyond

Frances GuzmanDeputy Director for Business Operations & Finance Support

(956) [email protected]

Kelly SolisDirector for Special Education

(956) [email protected]

Region One ESC Contacts