ict library update · 2014. 7. 7. · 1 new construction methods (steel structural and metal...
TRANSCRIPT
1
Internal Circulation Only
ICT LIBRARY UPDATE
Bi-monthly Nov. – Dec. 2012 Vol. X : No. 6
Contents
- Articles - Pages
(Subject wise alphabetically indexed) - 2-5
- Addition of Books - 6
- Reports - 7-18
Prepared by : Neeru Saini
Librarian
2
Articles
Building
1 Building domes- Parliament library (A+D : Oct. 2012).
2 Organizing for project Management : (Steel Structural and Metal Buildings: Nov. 2012).
3 Energy Efficiency –New technical solutions for energy efficient building : (Master builder : Oct. 2012)
4 Review of different structural irregularities in buildings : (Journal of Structural Engineering Dec. to Jan. 2013).
5 High rise buildings: (Steel structures and metal buildings : Oct. 2012).
6 Office projects –Innovative integration of space frame and framed tube for high-rise building (Structural Engineering Digest
– Oct. to Dec. 2012).
Bridge
1 Footbridge over river marne, meaux (Steel structures and metal buildings : Oct. 2012).
Business Development
1 Two routes to resilience when your business model is upended, you need to do two things : reposition your core, and launch a disruptive start-up of your own. : (Harvard Business Review : Dec. 2012).
2 What you can learn from family business : focus on building resilience, instead of on short term results,(Harved Business
Review : Nov. 2012).
3 Which products should you stock …. ,(Harved Business Review : Nov. 2012).
3
Environmental
1 Solid waste management : (EPCJ : Nol. 16 : Nov.-Dec.2012).
2 Fuel oil from the plastic waste : ( EPCJ : Se-Oct. 2012)
Earthquake
1 Observations on damage in reinforced concrete structures during 18th
Sept. 2011 Sikkim –Nepal Earthquake (Structural Engineering
Digest – Oct. to Dec. 2012).
General
1 Pesticide-laden fruits, veggies : ( Down to Earth : Dec. 16-31, 2012)
2 Determination of Antioxidant Constituents in Palash (Butea Monosperma L) Flowers. (Consulting Ahead…Vo. 6 Issue 2 : 2012).
3 Tulsi can decontaminate water : (Down to Earth –Oct. 1-15, 2012).
4 Pomegranate peel helps make gold, silver nanoparticles: (Down to Earth : Dec. 2012)
Human Resource
1 A bubble that voices opinions : (Human Capital : Oct. 2012)
2 Clear communication defines bottom line (Human factor : Oct. 2010)
Highways
1 Concrete highways cracks repair in pavement quality concrete. (Master Builder : Nov. 2012)
Metro
1 Hyderabad Metro Rail Project (Steel Structures and Metal Building :Dec.2012).
4
Power
1 High Rise fire fighting systems –keeping it fire free latest fire fighting systems for high rise safety (Master Builders : Nov. 2012).
2 Power play : Twelfth plan investment projections Delhi islanding scheme : Guarding against grid disturbance (Indian Infrastructure
: Nov. 2012)
Road
1 Sustainability : road construction-possible use of some waste materials in road construction…(Master builder :
Oct. 2012).
2 7th
IRF Regional conference, roads for regional development : (World Highways : Sept. 2012).
3 Road and highways in focus : (Urban Railways – Oct.- Dec. 2012).
Railways
1 Overall performance of IR : (Urban Railways – Oct.- Dec. 2012).
2 IR goes whole hog for PPP : (Urban railways – Oct. –Dec. 2012).
Steel
1 Review of articles – Modern steel construction : (Structural Engineering Digest : Oct. to Dec. 2012).
5
Structures
1 New Construction Methods (Steel structural and metal buildings Sept. 2012).
2
Tunnel
1 Tunnel transit – growing demand in metro rail segment (Indian infrastructure : Oct. 2012).
2 Ground Engineering construction of underground metro stations and associated tunneling (Master Builders ; Nov. 2012)
Water
1 Water monitoring – flow measurement an important parameter (EPCJ : Sept- Oct., 2012).
2 An investigation of water quality and its quotient factor in Madurai : (Water Today ; Sept. 2012)
3 Water quality monitoring and testing (Water Today ; Sept. 2012)
4 Water proof coatings to keep your walls Immune to water and worries(Master builder : Nov. 2012)
5 Sustainable water management for cooling towers : (Water Today : Oct. 2012)
6 Contemporary development Green water treatment solutions : (Water Today : Oct. 2012).
7 Water reuse plant in Australian office building : (Water Today : Nov. 2012)
6
ADDITIONAL OF BOOKS
1 15877 : Specifications and schedule of rates for electrical works 2009
2 16012 : Failed bridges case studies causes and consequences.
3 16013 : BSEN 13256-2001 Geotextiles and Geotextile related products characteristics required…
4 16014 : Renewable energy in M.P. Opportunities and options may 2012
5 16015 : Company Act with new schedule VI 17th
ed. 2012
6 16016 : Direct taxes law and practice.
7 16017 : Services tax law and procedure – finance act 2012 ed. Vol. I – 2012
8 16018 : Services tax law and procedure – finance act 2012 ed. Vol. II – 2012
9 16091 : NFPA- 80 : Standard for fire doors and other opening protective..
10 16092 : NFPA-130 : Standard for fixed guide way transit and passenger rail system 2012
11 16093 : NFPA – 101 : Life safety code.
12 16094 : United nations handbook on practical anticorruption measures for prosecutors and investigation.
13 16095 : IS 10500 : 2012 : Drinking water specifications
14 16096 : IS 1237 : 2012 : Cement concrete flooring tiles specifications.
15 16124 : Planning design & engineering of sustainable Urban transport and system.
16 16125 : International seminar on transport infrastructure 2025 opportunities and challenges souvenir 12-13 Dec. 2012
17 16126 : Seminar on innovations in administration and project management 1st Dec. 2012
7
Reports
Sl. No. Projects Name Acc. No.
Title of the Report (Hard CopRe Soft Copy
Year
1 NH-43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 laning with paved shoulders configuration of ……
15935 MPR : Oct. 2012
2 NH-77 (HM) : Four laning of Hajipur - Muzaffarpur section of …….
15881 MPR No. 23 : Sept. 2012
15882 Inspection Report : 2012 : Oct. 2012
16009 QPR No. 7 : July 2012
16041 Inspection Report : Nov. 2012
16042 MPR : Oct.2012
16043 Various Monthly Report : Oct. 2012
16050 MPR No. 24 : Oct. 2012
16112 QPR No. 8 : Oct. 2012
3 NH-4 (TC) : Six laning of Tumkur- Chitradurga section of NH-4 from Km. 75+000 to km. 189….
15901 MPR : August 2012
15902 Monthly Inspection Report : August 2012
15903 MPR : Sept. 2012
15904 Monthly Inspection Report : Sept. 2012
15911 QPR : Sept. 2012
4 NH-10 (Hary.) : Independent engineering services for 4/6 laning of Delhi/ Haryana…….
15878 QPR : July to Sept. 2012
15879 MPR : Oct. 2012
16105 MPR :Nov. 2012
6 NH-15 (PA) : Independent engineer for 4 laning of Pathanko t- Amritsar section from …..
15946 Monthly Inspection Report No. 17 : Oct. 2012
15947 QPR No. 8 : Sept. 2012
8
15948 MPR : No. 26 : Oct. 2012
15941 MPR No. 20 : Oct. 2012
16070 Monthly Inspection Report No. 18 : Nov. 2012
7 NH-1 (Panipat) : Preparation of detailed project report for safe greener highway on ………….
15938 MPR : Oct. 2012
8 NH-83 : (Patna) : Patna Gaya Dhobi section of NH-83 from km.0.000 to km 125.000
16005 FDPR : Vol. VI : Cost estimate: Oct. 2012
16006 FDPR : Vol. VIII : Geotechnical investigation report : Oct. 2012
9 NH-60 (A) : Consultancy services for preparation of detailed project report for rehabilitation and upgrading
15936 MPR : Oct. 2012
10 NAM : (AP) : Design, construction finance operation and maintenance of four laning of Narketpally addanki medarametla road …..
15940 MPR No. 19 : Sept. 2012
15941 MPR No. 20 : Oct. 2012
11 NH-8 (SD) : Six laning of Surat –Dahisar section of NH-8 from km 263.000 to km. 502.000…..
15952 Site Inspection Report : Oct. 2012
16110 QPR : Sept. to Nov. 2012
16111 MPR . Nov. 2012
12 NH-77 (MS) : Independent engineer services for two laning of Muzaffarpur –Sonbarsa section of NH-77 ……
15883 MPR : Sept. 2012
15884 Monthly Inspection Report No. 13 : Sept. 2012
16051 Monthly Inspection Report No. 14 : Oct. 2012
16106 Various monthly report : Nov. 2012
13 NH-59 (MP) : Independent engineer services for 4 laning of Godhra to Gujarat/MP …
15924 MPR No. 22: August 2012
15925 Inspection Report No. 21 : Sept. 2012
15926 MPR No. 23 : Sept. 2012
14 NH-54 (MN) : Four laning from km. 126/450 to km.140 -/700 and …..
15890 MPR : Sept. 2012
16010 MPR : Oct. 2012
15 NH-2 (UP) : Consultancy Package GTRIP/SC/1 for the construction supervision for four laning and strengthening of the existing two ….
15920 QPR : Sept. 2012
15921 Engineering Report No. 122 : Sept. 2012
15922 MPR No. 128 : Oct. 2012
9
15953 Engineering Report No. 123 : Oct. 2012
16107 Engineering Report No. 124 : Nov. 2012
16108 Monthly Progress Report : Nov. 2012
16 NH-21 (Punjab) :Independent consultancy services for 4 laning of Kurali) kiratpur section ……
15916 QPR No. 20 : Sept. 2012
15917 MPR No. 60 : Sept. 2012
16011 MPR No. 61 : Oct. 2012
16109 Monthly Report No. 62 : :Nov. 2012
17 NH-9 (PS) : Independent engineer services for design, engineering, construction, development, finance, Operation and maintenance of …..
15893 MPR No.22 : August 2012
15894 MPR No. 23 : Sept. 2012
18 NH-5 (CN) : Six laning of Chilakaluripet Nellor section of NH-5 from km 1182.802 to km ….
15885 QPR : Sept. 2012
15944 MPR : August 2012
15945 MPR : Sept. 2012
19 NH-6 (Orissa) : Consultancy services for preparation of DPR for rehabilitation and up gradation of Baharagora to Sambalpur ……
15939 Progress Report : Oct. 2012
16069 Progress Report : Nov. 2012
20 SH-45-50 (C – Anjar) : Design consultancy for four laning of existing two lane Chirai Anjar road including Anjar bypass and …..
15937 SLAG : Investigation Report : Nov. 2012
21 NH-8 (Gomti) : Independent engineer for 6 laning of Surat Dahisar section from 263.00 to km.502.00 of…..
15951 Q&M Inspection Report 35 : Sept. 2012
16007 O & M Inspection Report No. 36 : Oct. 2012
16008 Quarterly Progress Report No. 12 : Oct. 2012
22 NH-54 (AS-1) : 4 laning of Silchar to Balachera Section of NH-54 …..
15886 MPR : Oct. 2012
15889 MPR : Sept. 2012
15907 QPR : Sept. 2012
23 NH-1 A (2151) : Multi sector project for infrastructures rehabilitation in Jammu…..
15887 MPR : Oct. 2012
16098 MPR : Nov. 2012
24 Ethiopia (Addis Ababa City) : Consultancy services for technical advisory service for Addis Ababa city Traffic
15888 Final Report : Oct. 2012
10
management
25 NH-9 (HV) : Independent consultancy services for design, engineering construction development …..
15891 MPR : Sept. 2012
15892 Monthly Report : Oct. 2012
16052 Monthly Report : August 2012
16054 Monthly Report : Sept. 2012
16066 Monthly Progress Report : Oct. 2012
26 NH-47 (KL-1) : 4/6 laning of NH from Thrissur to Edapally sectuib if NH-47 …
15895 MPR : August 2012
16074 MPR : Sept. 2012
27 NH-47 (KL-3) : Independent engineering services for design construction, development, finance, operation and maintenance of 6 laning of Vadakanchery…..
15896 Monthly Inspection Report : Sept. 2012
15897 Quarterly Inspection report : Sept. 2012
16053 Monthly Inspection Report : August 2012
16054 Monthly Inspection Report : Oct. 2012
28 NH-50 (BH) : Four laning of Bijapur…
15898 QPR : Sept. 2012
15899 Operation and maintenance report No. 4 : Oct. 2012
16068 Operation and Maintenance Report No. 5 : Nov. 2012
29 MP : (2736) : Construction of ADB assisted nine highway corridors under ADB Loan no. 2736….
15900 MPR No. 15. Oct. 2012
15923 MPR No. 14 : Sept. 2012
16073 MPR No. 16 : Nov. 2012
30 NH-25/26 : (JL) : Jhansi to Lalitpur in the state of U.P. ….
15905 MPR : August 2012
15906 MPR : Oct. 2012
15927 QPR : Sept. 2012
31 NH-45 (TK) :
15908 Inspection Report No. 8 : August 2012
15909 Inspection Report No. 9 : Sept. 2012
15910 QPR : Sept. 2012
15912 MPR : August 2012
15913 MPR : Sept. 2012
11
32 NH-4 (TH) : Harihar to Haveri in Karnataka….
15914 MPR No. 48 : Oct. 2012 (Pack4)
15915 MPR No. 48 : Oct. 2012 (Pack5)
16071 MPR No. 49 : Nov. 2012 Pack. 4
16072 MPR No. 49 : Nov. 2012 Pack. 5
33 NH-22 : Independent engineer services for two laning with paved shoulder of Dindigul Theni section km. …
15918 MPR No. 54 : Sept. 2012
15919 QPR No. 18 : Sept . 2012
16040 Final Report On traffic survey and analysis Dec. 2012
16055 MPR . No. Oct. 20121
16067 MPR Oct. 2012
34 MP (Deherdha Ishagarh) :
15928 Report on EPC Cost of Project : August 2012
15929 Project Review and Assessment : August 2012
35 SH-18 : (TL) : 15930 MPR : August 2012
15931 MPR : Oct. 2012
36 SH- 39 : 15932 MPR No. 1 : August 2012
37 NH-58/72 : 15933 QPR : Sept. 2012
38 NH-15 (PJ) : Consultancy services for preparation od detailed project report for
15934 MPR : Oct. 2012
39 MP (2154): Consultancy services for construction supervision of package no. 2 …..
15942 MPR No. 71 : Sept. : 2012
15943 QPR : Sept. 2012
16065 Monthly Progress Report No. 72 : Oct. 2012
40 NH-8 (D) : Independent Engineering services for the four laning of Jetpur Somnath section from ……
15949 QPR No. 3 : Sept. 2012
15950 MPR No. 11 : Sept. 2012
16044 MPR No. 12 : Oct. 2012
41 NH-83 (Patna) Patna Gaya Dhobi section of NH-83 from km. ……
15954 Modified FDPR : Vol. I : Main Report : Oct. 2012
15955 Modified FDPR : Vol. II : Appendices to Main Report : Oct. 2012
12
15956 Modified FDPR : Vol. V : Social impact screening Report : 2012
CD
15957 Modified FDPR : Vol. IV : Environment screening and environment assessment report : Oct. 2012
15958 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 1 of 8) : Oct. 2012
15959 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 2 of 8) : Oct. 2012
15960 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 3 of 8) : Oct. 2012
15961 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 4 of 8) : Oct. 2012
15962 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 5 of 8) : Oct. 2012
15963 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 6 of 8) : Oct. 2012
15964 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 7 of 8) : Oct. 2012
15965 Modified FDPR : Vol. VII : Design features and detailed design calculations of structures : (Part 8 of 8) : Oct. 2012
15966 Modified FDPR : Vol. VI : Cost estimate (Package II) : Oct. 2012
13
15967 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 1 of 3) : Oct. 2012
15968 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 2 of 3) : Oct. 2012
15969 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 3 of 3) : Oct. 2012
15970 Modified FDPR : Vol. VIII : Geotechnical Investigation Report : Oct. 2012
15971 Modified FDPR : Vol. VI : Cost estimate :Oct. 2012 Package III
15972 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 1 of 4) : Oct. 2012
15973 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 2 of 4) : Oct. 2012
15974 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 3 of 4) : Oct. 2012
15975 Modified FDPR : Vol. VII : Design features and detailed design calculations of structure (Part 4 of 4) : Oct. 2012
15976 FDPR Vol. VIII: Geotechnical investigations report : Oct. 2012
42 NH-65 : (148D) & (458) : Consultancy services for preparation of Detailed project Report from Lambia
15977 148 D Package I : FDPR : Vol. I : Preliminary Design Report : Nov. 2012 : Package I
CD
15978 FDPR : Vol. II : Design Report : Nov. 2012
15979 FDPR : Vol. II(A) : appendices to design report : Nov. 2012
15980 FDPR : Vol. III : Drawings : Nov. 2012
15981 FDPR : Vol. IV : Environment Impact Assessment and Environment plan :Nov. 2012
14
15982 458 Package I : FDPR : Vol. I : Preliminary Design Report : Nov. 2012 :
CD
15983 FDPR : Vol. II : Design Report : Nov. 2012
15984 FDPR : Vol. II(A) : Appendices to design report : Nov. 2012
15985 FDPR : Vol. III : Drawings : Nov. 2012
15986 FDPR : Vol. IV : Environment Impact Assessment and Environment management plan. : Nov. 2012
15987 FDPR : Vol. V : Cost estimate : Nov. 2012
15988 148 D Package II : FDPR : Vol. I : Preliminary design report Nov. 2012 :
15989 FDPR : Vol. II : Design Report : Nov. 2012
15990 FDPR : Vol. II(A) : appendices to design report : Nov. 2012
15991 FDPR : Vol. III : Drawing : Nov. 2012
15992 FDPR : Vol. IV : Environmental Impact assessment and environment management plan :Nov. 2012
15993 458 Package II : FDPR : Vol. I : Preliminary Design Report : Nov. 2012
15994 FDPR : Vol. II : Design report : Nov. 2012
15995 FDPR : Vol. II (A) : Appendices to design report : Nov. 2012
15996 FDPR : Vol. III : Drawing : Nov. 2012
15997 FDPR : Vol. V : Cost estimate : Nov. 2012
15998 FDPR : Vol. IV : Environment Impact Assessment and environment management plan : Nov. 2012
15999 458 :Package III : FDPR : Vol. I : Preliminary Design Report : Nov. 2012 :
16000 FDPR : Vol. II : Design Report : Nov.
15
2012
16001 FDPR : Vol. II (A) : Appendices to design report : Nov. 2012
16001 FDPR : Vol. III : Drawing 2012
16003 FDPR : Vol. IV : Environmental Impact assessment and environment management plan : Nov. 2012
16004 FDPR : Vol. V : Cost estimate : Nov. 2012
62 NH-30 (Mohani) : Independent engineering services for the work of four laning of Mohania ara section of NH-30 ………
16113 MPR : August : 2012
16114 MPR : July : 2012
16121 MPR : Inception Report : 2012
16122 MPR : Sept. 2012
16123 MPR : Oct. 2012
63
Ghana : (Ghana-Kumasi) : Consultancy services for update of engineering designs for the Kumasi Roads and drainages extension project Ghana…..
16056 Preliminary design and update of cost estimate Ph ; I (Final Report ) : Nov. 2012
64 NH-13 (BH) : Four lanign of Bijapur-Hungund section of NH-13 from……
16075 Operation and maintenance manual : July 2012
65 Tanzania : (NML) Consultancy services for environmental and social impact assessment, detailed engineering design and preparation of tender documents for …..
16076 Final Engineering Design Report : Vol. O : Main Report : Dec. 2012
16077 Final Engineering Design Report : Vol. II : Topographical survey report : Dec. 2012
16078 Final Engineering Design Report : Vol. VII : Drawing Data : Dec. 2012
16079 Final Engineering Design Report : Vol. VIII : Structure design calculations (Bridges and box culverts) : Dec. 2012
16080 Final Engineering Design Report : Vol. XI : Bill of quantities Package I : Natta to Tabora B : Gate : Dec. 2012
16081 Final Engineering Design Report : Vol. XI : confidential cost estimate package I : Natta to Tabora B : Gate : Dec. 2012
16
16082 Final Engineering Design Report : Bidding documents Vol. I Dec. 2012 Package
16083 Final Engineering Design Report : Vol. I : Bidding Documents Package II : Dec, 2012
16084 Final Engineering Design Report : Vol. XI : Bill of quantities Package II : Tabora B Gate to ….
16085 Final Engineering Design Report : Vol. XI : Confidential cost estimate : Package II : Tabora B Gate to ….
16086 Final Engineering Design Report : Vol. I : Bidding documents : Package III : Dec. 2012
16087 Final Engineering Design Report : Vol. I : Confidential cost estimate : Package II : Dec. 2012
16088 Final Engineering Design Report : Vol. IX : Bill of quantities Klieni gate to Lolicndo …Dec. 2012Package III :
16089 Final Engineering Design Report Vol. 5 (A) : Plan and profile and miscellany drawings : Dec. 2012
16090 Final Engineering Design Report : Vol. 5 B : Drainage plan and structural drawings : Dec. 2012
66
NH-2 (VA) : Independent engineering services for the work of 6 laning of Varanasi-Aurangabad section of NH-2…..
16098 QPR NO.5 : July 2012
67 NH-47 (08) : Design, engineering, finance, construction, and maintenance of 6 laning from chengapalli to start of coimbator …..
16099 Various Other report : July 2012
16100 MPR : July 2012
16101 MPR : May 2012
16102 Monthly Report : June : 2012
16103 Monthly Report : April 2012
17
16104 Monthly Project report : April 2012
68 Vadodara Mumbai Expressway : Preparation of detailed engineering design of Vadodara – Mumbai expressway including spur to …..
16127 FDPR : Vol. I : Main Report : Nov. 2012 CD
16128 FDPR : Vol. II(A) : annexures to main report : Nov. 2012
16129 FDPR : Vol. II : Design report Part :I : alignment future and pavement design : Nov. 2012
16130 FDPR : Vol. III : Soil and material investigation
16131 FDPR : Vol. II : Design Report (Part- III) traffic survey and analysis report Nov. 2012
16132 FDPR : Vol. IV : Environment Impact assessment & Environmental Management plan. Nov. 2012
16133 FDPR : Vol. V : Social impact assessment studies and rehabilitation action plan. Nov. 2012
16134 FDPR : Vol. VI : standards and specification : Nov. 2012
16135 FDPR : Vol. VII : Rate analysis : Nov. 2012
16136 FDPR : Vol. VIII : Cost estimate (Part I of 5) (Main expressway) : Nov. 2012
16137 FDPR : Vol. VIII : Cost estimate (Part 2 of 5) (Main expressway) : Nov. 2012
16138 FDPR : Vol. VIII : Cost estimate (Part 3 of 5) (Main expressway) : Nov. 2012
16139 FDPR : Vol. VIII : Cost estimate (Part4I of 5) (Main expressway) : Nov. 2012
16140 FDPR : Vol. VIII : Cost estimate (Part 5 of 5) (Main expressway) : Nov. 2012
16141 FDPR : Vol. IX : Drawings Part A-I Road drawing …. Nov. 2012
16142 FDPR : Vol. IX : Drawings Part A-2 Sub Part 1 of 4 plan and longitudinal profile … Nov. 2012
18
16143 FDPR : Vol. IX : Drawings Part A-2 Sub Part 2 of 4 plan and longitudinal profile … Nov. 2012
16144 FDPR : Vol. IX : Drawings Part A-2 Sub Part 3 of 4 plan and longitudinal profile … Nov. 2012
16145 FDPR : Vol. IX : Drawings Part A-2 Sub Part 4 of 4 plan and longitudinal profile … Nov. 2012
16146 FDPR : IX : Road drawings Part A-3 : Interchange and standard drawings . Nov. 2012
16147 FDPR : Vol. IX : Drawings Par B-1 (Drawings and structures ) sub Part 5 of 9 Canal bridge …. Nov. 2012
16148 FDPR : Vol. IX : Drawings of Bridges/structures Part 7 of 9) : ROB’s : Nov. 2012
16149 FDPR : Vol. IX : Drawings of Bridges/structures Part 9 of 9) : Gas pipeline bridges CRZ, VoB’s….. Nov. 2012 Nov. 2012
16150 FDPR : Vol. IX : Drawings : Part B-3 drawings of structures sub part 1 of 3 RCC Solid slab RCC, Girder… Nov. 2012 of 9) : ROB’s : Nov. 2012
16151 FDPR : Vol. IX : Drawings : Part B-3 drawings of structures sub part 2 of 3 RCC Solid slab RCC, Girder… Nov. 2012 of 9) : ROB’s : Nov. 2012
16152 FDPR : Vol. IX : Drawings : Part B-3 drawings of structures sub part 3 of 3 RCC Solid slab RCC, Girder… Nov. 2012 of 9) : ROB’s : Nov. 2012