1 1 ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED CONSTRUCTION FOR POST-DISASTER RESTORATION Shigeomi Nishigaki, Kick, Co., Ldt., Tokyo, Japan Katsutoshi Saibara, Kick, Co., Ltd., Kochi, Japan Shigeo Kitahara, Kumagaigumi, Co., Ltd., Tokyo, Japan Hajime Iwasaki, Kumagaigumi, Co., Ltd., Nagasaki, Japan Kazuhiro Yamada, Kumagaigumi, Co., Ltd., Nagasaki, Japan Hideaki Satoh, Kumagaigumi, Co., Ltd., Tokyo, Japan Kick 2 Unmanned Construction in the Unzen Restoration Project Mt. Unzen Shimabara city

Upload: others

Post on 24-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

1

1

ICT-BASED WORK MANAGEMENT

TO SUPPORT UNMANNED CONSTRUCTION

FOR POST-DISASTER RESTORATION

Shigeomi Nishigaki, Kick, Co., Ldt., Tokyo, Japan

Katsutoshi Saibara, Kick, Co., Ltd., Kochi, Japan

Shigeo Kitahara, Kumagaigumi, Co., Ltd., Tokyo, Japan

Hajime Iwasaki, Kumagaigumi, Co., Ltd., Nagasaki, Japan

Kazuhiro Yamada, Kumagaigumi, Co., Ltd., Nagasaki, Japan

Hideaki Satoh, Kumagaigumi, Co., Ltd., Tokyo, Japan

Kick

2

Unmanned Construction in the Unzen Restoration Project

Mt. Unzen

Shimabara city

Page 2: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

2

3

The unmanned construction is introduced to a disaster

recovery or reconstruction under the following

conditions:

-Workers should be safe from any danger while they are

working;

-The structure of the check dam being constructed

should stand up to debris flow;

- The construction period should be short; and

Enormous volcanic deposits existing around the

construction site should be utilized effectively.

Unmanned Construction

4

Unmanned construction in the hazardous area under the threat of

avalanche of earth and rocks, land slide, or rock falls, and so on.

Hazardous Area

Venous unmanned construction such as

digging, loading and haulage of earth

and rocks Arterial unmanned construction such as

digging, shaping sediment forms, and

haulage, spreading and compacting of

no-slump concrete to build multilayer

sediment control dam

Multilayer sediment control dam

Page 3: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

3

5

No-slump Concrete Haulage and Placement to

build Multilayer Sediment Control Dam

Ground Station

Transfer Spot

Dumping and SpreadingSpreading and Compacting

Tel-operation Room

Active tag and GPS receiver

packed up in the vinyl case

No-slump Concrete Haulage

Batching Plant

6

Construction Target

Management

Work Plan and Supervision

Work order

Work Remote Monitoring

and control

Construction Profile

Points On Construction (POC)

Construction Plan

Design

ICT-based Work Management

Construction Profile

Management

Bird-eye View of Construction

Information Management

Data exchange function

Page 4: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

4

7

Relation between POC and ICT-based Work Management

Dump truck>>>

in-cab on board

・Active tag・GPS receiver・Web camera・Compact PC・Comm. terminal

ICT-based

Work Management

GPS

Satellite comm.

Operator

Mechanics

Gang leader Supervisor

Workers

Driver

①①①① Work zone fence

②②②② Information dissemination

Meetings

Contractor

④④④④Remote real-time

monitoring on PC

Cellular Phone

Backhoe>>>in-cabin on board

・Accelerometer・GPS receiver・Tag detector・compact PC・comm. terminal

Ground station>>>

・Tag detector・Compact PC・Comm.terminal

ICT equipment>>>

③③③③ Automated detection

and data gathering

Event occurrences are automatically

detected and then

the data automatically gathered

②②②②Information dissemination

all at once

a) Work plan and order

b) Emergency call-in

Active tag

Compact PC

POC

Data

exchange

④④④④Remote real-time monitoring

on Cellular Phone

8

Work Zone Fence for the Work Plan and Supervision◇◇◇◇Operation area of mobile entities is zoned into

compartments such as loading spot, haulage route,

transferring or dumping spot, and compartments of

concrete placement, as considering work

environment such as area, width, curvature, number

of lanes, and densely inhabited district.

◇◇◇◇This system is able to identify mobile entity within

the compartment, records time when entering and

existing the area, and calculate elapsed time within

the area.

◇◇◇◇Supervisor and resident engineers are able to

watch and confirm relevant information on works

performed and current work in progress in the each

compartment.

◇◇◇◇Operation area of mobile entities is zoned into

compartments such as loading spot, haulage route,

transferring or dumping spot, and compartments of

concrete placement, as considering work

environment such as area, width, curvature, number

of lanes, and densely inhabited district.

◇◇◇◇This system is able to identify mobile entity within

the compartment, records time when entering and

existing the area, and calculate elapsed time within

the area.

◇◇◇◇Supervisor and resident engineers are able to

watch and confirm relevant information on works

performed and current work in progress in the each

compartment.

Page 5: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

5

9

Work order and

Emergency call-in all at once to take shelter

Display of work order

Emergency Call-inLook-up table of works ordered

Based on the work plan, supervisor is able to

issue work order daily to inform gang leaders

and others of work orders and safety instructions.

Based on the work plan, supervisor is able to

issue work order daily to inform gang leaders

and others of work orders and safety instructions.

Work Order

Supervisor is able to communicate all at once

to take shelter by informing emergency alert

as to earthquake, tsunami and localized torrential downpour.

Here, supervisor can choose one of pre-arranged

alarm categories and also entry her/his order.

Supervisor is able to communicate all at once

to take shelter by informing emergency alert

as to earthquake, tsunami and localized torrential downpour.

Here, supervisor can choose one of pre-arranged

alarm categories and also entry her/his order.

10

Remote Monitoring Display on real time basis

for No-slump Concrete Haulage and Placement

Information on movement of

10 tones dump trucks

Information on movement of

off-highway dump trucks

Look-up table of concrete

placement work in progress

at the each compartment

Time Control over Concrete Placement

The information on this display gives work performed by now

And current work in progress at one-minute intervals.The information on this display gives work performed by now

And current work in progress at one-minute intervals.

Page 6: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

6

11

At the same time, information of those can be confirmed

on cellular phone

Current state of

concrete hauled

Information on time control

of concrete placement:

While placing concrete

→blackConcrete placement ended

→BlueLeft time:

within 50 minute→Orangewithin 30 minute→Red

Current state of

concrete placement

12

REMARKS

With the objective of increasing construction

safety and efficiency on daily duty-cycle.

This system

-Gives a detailed visibility into appearances

and motions in the unmanned construction,

and

- Enables the decision-makers to take quick

actions.

Page 7: ICT-BASED WORK MANAGEMENT TO SUPPORT UNMANNED … · Based on the work plan, supervisor is able to issue work order daily to inform gang leaders and others of work orders and safety

7

13