ict 2009 reliability assessment and construction plan evaluation
DESCRIPTION
ICT 2009 Reliability Assessment and Construction Plan Evaluation. Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana. Overview. Background Scope Draft Construction Plan Results. Background. - PowerPoint PPT PresentationTRANSCRIPT
ICT 2009 Reliability Assessment and Construction Plan Evaluation
Entergy Transmission SummitAugust 11, 2009Astor Crown PlazaNew Orleans, Louisiana
SPP.org 2
Overview
• Background
• Scope
• Draft Construction Plan
• Results
SPP.org 3
Background
• Reliability Assessment is performed pursuant to Entergy’s Open Access Transmission Tariff (OATT) Attachment K.
• Objectives: • Assess of the ability of the Entergy transmission
system to perform according to the Planning Criteria.
• Evaluate the Construction Plan’s ability to mitigate any performance deficiencies found.
• Provide basis for development of the Base Plan.
SPP.org 4
Background
• Draft report was made available for stakeholder review and comment• Posted on Entergy’s OASIS July 17, 2009
• Presentation made at LTTIWG July 22, 2009
• Final report is posted on Entergy’s OASIS.• Detailed information not included in report is posted
• Background models, data, and other information is posted
SPP.org 5
Entergy Planning Criteria
• Planning Criteria• NERC Planning Standards
• SERC Supplements
• Entergy’s Local Planning Criteria
• Entergy’s Business Practices (Planning Guidelines)
• Posted on Entergy’s OASIS
• NERC Planning Standards being revised
SPP.org 6
Reliability Assessment Scope
• Models• Near-Term Period: Summer & Winter 2010 & 2014• Longer-Term Period: Summer 2018• Construction Plan Projects
1. Initial Scan: Approved Projects from 2009-11 Construction Plan
2. CP Eval: Approved and Proposed Projects <2010-12 Construction Plan
• System Intact Review – Category A• Contingency Scan – Category B• Sensitivities
• Specific Load Pocket Criteria• Low Hydro Sensitivity
SPP.org 7
Entergy’s Draft Construction Plan 2010-2012
• May 13, 2009: Original Draft Posted
• July 16, 2009: Revision 1 Posted
• August 3, 2009: Revision 2 Posted• 25 New Projects
• 10 Accelerated Projects
• 4 Delayed Projects
• 20 Projects reported in the 2008 Differences Report• 12 were directly included in the draft CP project
• 7 were replaced in the draft CP by an alternative project
• 1 was partly included; the full project is expected in a later CP
SPP.org 8
Near-Term: 2010 Problems and SolutionsProjected Problem Area Draft CP Project and Est. In-Service Date
Fish Creek-Longmire 138 kV (Western) College Station 138 kV Switch Station (2010)
Chlomal-Jennings 69 kV corridor (SW La.) Carter & Elton (2010)
Acadiana Area (S La.) Acadiana Area Improvement Project Phase 1 (2011) and Phase 2 (2012)
Holiday-Lafayette 69 kV (S La.) Youngsville 138 kV Substation (2011)
Willow Glen-Monochem & Sorrento-Vignes (SE La.)
Willow Glen-Conway 230 kV (2014)
Liberty-Amite & Brookhaven-Norfield (S Miss.) Bogue Chitto 500/230 kV (2013)
South Jackson-Brookhaven 115 kV corridor (S Miss.)
Ray Braswell-Wyndham-Byram (2013)
Tillatoba-Winona 115 kV corridor (Central Miss.)
Grenada Area Improvement Phase 2 Project (2012)
Hot Springs-Amity Tap 115 kV (Central Ark.) Aquila TSA (2011)
Lynch-McAlmont 115 kV (Central Ark.) Holland Bottoms (2012)
Harrison-Everton 161 kV (N Ark) Harrison East Switches (2011)
Harrison-Eureka 161 kV corridor (N Ark.) Grandview (2011)
SPP.org 9
Near-Term: 2014 Problems and Solutions
Projected Problem Area Draft CP Project and Est. In-Service Date
115 kV system south of Valentine-Barataria-Port Nickels (SE La.) SE LA Coastal Improvement Phase 3 (2012)
Waterford-Tezcuco 230 kV Belle Point-Gypsy 230 kV (SE La.) Bayou Steel-Tezcuco (2012)
Kenner-Snakefarm 115 kV (SE La.) Kenner-Snakefarm (2010 Winter)
Waterways-Vicksburg East 115 kV (SW Miss.) Waterways-Vicksburg East (2011)
Baxter Wilson-Ray Braswell 500 kV (SW Miss.) Baxter Willson-Ray Braswell 500 kV (2010)
Benton-Bauxite-Mabelvale 115 kV Corridor (Central Ark.) Benton S-Benton N (2012)
Cabot Area 115 kV Voltage (Central Ark.) Ward Capacitor (2010)
Morrilton East-Gleason-Tyler 161 kV (Central Ark.) Holland Bottoms-Hamlet (2012)
SPP.org 10
Near-Term: 2014 Problem Areas Under Study
Projected Problem Area CommentCalvert 69 kV (Low Voltage) (Western)
New Caney 138 kV (Low Voltage) (Western)
Port Neches Bulk-Sabine 138 kVPort Neches Bulk-Linde 138 kV (SE Tex.) Possible mitigation: Op Guide
Kolbs-Lakeview 69 kV (SE Tex.)
Mossville-Line 253A Tap 69 kV (SW La.)
Cecelia-Semere 138 kV (S La.)
Fivepoints-Tigre 69 kV (S La.) Possible mitigation: Existing spare transformer
Carlisle (La.) 115 kV (Low Voltage) (SE La.) Possible mitigation: Automatic load transfer
Horn Lake-Hernando 115 kV Corridor (N Miss.)Getwell-Batesville 230 kV Project first leg in
the draft CP. Transformer tap adjustments are also being investigated.
Parkin-Twist 161 kV (NE Ark.) Alternatives under consideration.
Bull Shoals SPA-Bull Shoals Entergy 161 kV (N Ark.) SPA has a planned upgrade for 2011.
Norfork-Calico Rock-Melbourne 161 kV (N Ark.) Alternatives under consideration.
SPP.org 11
Map Legend
Year Color Key
Overloads and Low VoltagesPlanned Upgrade from
Entergy’s Draft Construction Plan
Other Notes
Solution being investigated
Annotations
Contingency Scan Results with Entergy’s Draft Construction Plan Projects Included
Key to Map Highlights
SPP.org 12
Grandview-Osage Creek 161 kV
Line
Harrison East Upgrade
Melbourne-Sage Line Upgrade
SPP.org 13
SPP.org 14
Holland Bottoms New Station
Holland Bottoms-Hamlet New 161 kV Line
Lynch-McAlmont 161 kV Overload
SPP.org 15
Hot Springs-Bismarck-Alpine-Amity Upgrade
Benton North-Benton South 115 kV Line
SPP.org 16
SPP.org 17
Greenbrook 115
Plum Point 115
Nesbit 115
Getwell 230/115
Hernando 115
Batesville 230/115
Horn Lake 230/161/115Freeport 500/230
Church Rd 230
Twinkletown 230 165 MW
SPP.org 18
Grenada/Winona/
Greenwood
SPP.org 19
R. Braswell-Byram 115 kV Line
SPP.org 20
Bogue Chitto
SPP.org 21
Kenner-Snakefarm
SE Louisiana Coastal Improvement
SPP.org 22
Willow Glen-Conway 230 kV
SPP.org 23
Acadiana Improvement
Project
SPP.org 24
Mossville-L253A Tap
SPP.org 25
Sabine-Port NechesPort Neches-Linde
Kolbs-Lakeview
SPP.org 26
College Station 138 kV Switch Sta
SPP.org 27
Low Hydro
• Simulate reduced availability of hydro units during summer peak• Conway (Arkansas) Area
• Harrison-Eureka 161 kV
• Norfork-Sage 161 kV
SPP.org 28
Load Pocket Criteria
• Application of Specific Load Pocket Criteria• Western
• Amite South
• Downstream of Gypsy (DSG)
• G-1, N-1• No new problems identified.
SPP.org 29
Longer-Term Period: 2018
Projected Problem Area Comment
Tubular-Dobbin 138 kV Area (Western)
Dayton 138 kV Area (Western)
Kolbs/Hanks Area (SE Tex.)
Tigre-L247 Tap 69 kV (S La.) Possible mitigation: Existing spare transformer
Lake Arthur, Klondike 69 kV (S La.)
Sorrento-Gonzales (SE La.)
Gypsy-Claytonia 115 kV Area (SE La.)
Minden-Minden LaGen 115 kV (N La.)
S Jackson-E Jackson 115 kV (Central Miss.)
Andrus 230/115 kV transformer (Central Miss.)
Horn Lake Area (N Miss.) Possible mitigation: Getwell-Batesville 230 kV
SPP.org 30
Longer-Term Period: 2018Projected Problem Area Comment
Marked Tree-Twist 161 kV (NE Ark.)
Trumann-Trumann West 161 kV (NE Ark.)
NLR Dixie-Lakewood 115 kV (Central Ark.)
Bull Shoals-Norfork 161 kV (N Ark.)
Helena Area (E Ark.) Possible mitigation: Operating Guide
Cabot Area (Central Ark.)
SPP.org 31
SPP.org 32
SPP.org 33
SPP.org 34
SPP.org 35
SPP.org 36
SPP.org 37
Gypsy-Claytonia
SPP.org 38
Tigre-L247 Tap
SPP.org 39
SPP.org 40
SPP.org 41
Base Plan Development Next Steps
• Today-August 31: Stakeholder Input/Comments on Projects for Base Plan and Construction Plan
• Stakeholder comments will be posted on Public OASIS (per Attach. K)
• September LTTIWG: Present/Discuss Comments
• October/November LTTIWG: ICT presents draft Base Plan for comment
• Year End: Final ICT Base Plan Posted; Final Entergy Construction Plan Posted