ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
General Information ProductUse.....................................................................................................................................Page4 ProtectionandStorage....................................................................................................................Page4 CheckMaterial.................................................................................................................................Page5 FieldConditions...............................................................................................................................Page5 CleaningMaterials...........................................................................................................................Page5 ExpansionJoints.............................................................................................................................Page5 SuggestionsforImprovingSystemThermalPerformance..............................................................Page6Frame Configurations............................................................................................................................Page7
TYPE “A” INSTALLATION (Verticals Run Through)
Section 1: Frame Fabrication and Assembly 1.1MeasuringOpening.................................................................................................................Page8 1.2CuttingMaterial.......................................................................................................................Page8 1.3VerticalMullionFabrication.....................................................................................................Page9 1.4IntermediateHorizontalFabrication.........................................................................................Page9 1.5WeepHoleFabricationforSill&Horizontal.............................................................................Page9 1.6WeepHoleFabricationforFaceCaps.......................................................................................Page9 1.7HeadAnchorFabrication.........................................................................................................Page9
Section 2: Frame Assembly 2.1ApplyingMullCaps...............................................................................................................Page11 2.2InstallingFaceCovers............................................................................................................Page11 2.3SealingHorizontalstoVerticals.............................................................................................Page11 2.4InstallingHead,Sill&Horizontals.........................................................................................Page12 2.5InstallingOptionalHorizontalforShearBlockInstallation.....................................................Page12
Section 3: Frame Installation 3.1GeneralFrameInstallation.....................................................................................................Page14 3.2ZonePlugInstallation............................................................................................................Page15 3.3ApplyingPerimeterSeal........................................................................................................Page15 3.4SSGBridgeInstallation..........................................................................................................Page15
TYPE “B” INSTALLATION (Head & Sill Run Through)
Section 4: Frame Fabrication and Assembly
4.1MeasuringOpening.................................................................................................................Page17
TaBLE OF CONTENTS
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 �Page
TABLE OF CONTENTS (continued)
4.2CuttingMaterial....................................................................................................................Page17 4.3Head&SillFabrication.........................................................................................................Page18 4.4VerticalMullionFabrication..................................................................................................Page18 4.5IntermediateHorizontalFabrication......................................................................................Page18 4.6WeepHoleFabricationatHorizontals...................................................................................Page18 4.7WeepHoleFabricationatFaceCaps....................................................................................Page18
4.8AnchorFabrication...............................................................................................................Page18
Section 5: Frame Assembly 5.1AttachingShearBlocks........................................................................................................Page20 5.2Head&SillAssembly..........................................................................................................Page20 5.3InstallingEndCaps..............................................................................................................Page20 5.4InstallingVerticals................................................................................................................Page24 5.5InstallingHorizontals............................................................................................................Page24
Section 6: Frame Installation 6.1SillAnchorInstallation..........................................................................................................Page24 6.2FrameInstallation.................................................................................................................Page24 6.3ZonePlugInstallation...........................................................................................................Page25 6.4SSGBridgeInstallation........................................................................................................Page25 6.5ApplyingPerimeterSeal.......................................................................................................Page25
6.6InstallingIsolatorClips..........................................................................................................Page25
Section 7: Frame Splicing (Type “B”)............................................................................................Page25
Section 8: Glazing 8.1InstallingExteriorGaskets.....................................................................................................Page28 8.2PositioningSettingChairs&SettingBlocks..........................................................................Page28 8.3SettingGlass.........................................................................................................................Page28 8.4InstallingSideBlocks........................................................................................................... Page30
8.5InstallingInteriorGaskets.....................................................................................................Page30Section 9: Supplemental Instructions A.1-A.7ReglazingFromtheExterior.........................................................................................Page31 B.1-B.2OptionalReinforcing(Type“B”Systems)....................................................................Page33
Section 10: Parts List...........................................................................................................................Page35
�
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
PRODUCT USE
The ICR-225 thermallyimprovedribbonwindowsystemisintendedforinstallationbyglazingprofessionalswithappropriateexperience.Subcontractorswithoutexperienceshouldemployaqualifiedpersontoprovidefieldinstructionandprojectmanagement.
Vistawalldoesnotcontroltheapplicationorselectionofitsproductconfigurations,sealantorglazingmaterialandassumesnoresponsibilitythereof.Itistheresponsibilityoftheowner,architectandinstallertomaketheseselectionsinstrictcompliancewithapplicablelawsandbuildingcodes.
Consult sealant manufacturer for review and recommendation of sealant application. Follow sealant manufacturer’s recommendations and literature for proper installation.
TheairandwaterperformanceoftheICR-225ribbonwindowsystemisdirectlyrelatedtothecompletenessandintegrityoftheinstallationprocess.Toinsuretopperformanceforthissystem,particularattentionshouldbegiventhefollowingprocedures.
PROTECTION aND STORaGE
Handleallmaterialcarefully.Donotdropfromthetruck.Stackwithadequateseparationsothematerialwillnotrubtogether.Storematerialofftheground,protectingagainsttheelementsandotherconstructionhazardsbyusingawellventilatedcovering.Removematerialfrompackageifwetorlocatedinadamparea.ForfurtherguidelinesconsultAAMApublication“CareandHandleofArchitecturalAluminumFromShoptoSite.”
Theglazinggasketsshouldbeinstalledsoastoavoidstretching,bucklesortears.Cornersmustbecuttotightlybutttogetherandsealasdescribedintheseinstructions.Avoiddamagetogasketandcornerjointsduringglazing.
2.
Surfacestobesealedshouldbecleanedwithisopropylalcoholorsolventanddriedasrecommendedbysealantmanufacturertoremovealldirtandcuttingoils.Sealantatshearblocksshouldbeaminimum3/16”diameternominal,placedcompletelyaroundthetop,faceandbottomoftheshearblockwithoutgapsinthesealant.Exposedsurfacesshouldbecleanedafterinstallingthehorizontal.Inspectjointforcompletesealantcontact,especiallywherethehorizontalmeetsthefaceoftheverticalmember.Repairjointasrequired.
1.
VariationsonthedetailsshownareinevitableandarenottheresponsibilityofVistawallwhendrawnbyothers.VistawallstronglyencouragesitscustomerstouseitsEngineeringdepartmentforcalculationsandshopdrawings.
ForStructuralSiliconeGlazingapplications,thestressonthesiliconeshouldnotexceed20PSI.Consultsealantmanufacturerforspecificapplicationtoensureproperloadingonsiliconejoint.
Consultglassmanufacturerforcorrectsettingblocklocationandlengthforglasssizesinexcessof40sq.ft.
GENERaL INFORMaTION
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 �Page
ChECK MaTERIaL
Checkglassdimensionsforoverallsizeaswellasthickness.Vistawallcannotbeheldresponsibleforgasketsthatarenotwatertightduetoextremeglasstolerances.
Checkallmaterialuponarrivalatjobsiteforqualityandtodetermineanyshippingdamage.
Usingthecontractdocuments,completelycheckthesurroundingconditionsthatwillreceiveyourmaterials.Notifythegeneralcontractorbyletterofanydiscrepanciesbeforeproceedingwiththework.Failuretodosoconstitutesacceptanceofworkbyothertrades.
Checkshopdrawings,installationinstructions,architecturaldrawingsandshippingliststobecomefamiliarwiththeproject.Theshopdrawingstakeprecedenceandincludespecificdetailsfortheproject.Theinstallationinstructionsareofageneralnatureandcoverthemostcommonconditions.Duetovaryingjobconditionsallsealantusedmustbeapprovedbythesealantmanufacturertoensureitwillperformpertheconditionshownontheinstructionsandshopdrawings.Thesealantmustbecompatiblewithallsurfacesinwhichadhesionisrequired,includingothersealantsurfaces.Useprimerswheredirectedbysealantmanufacturer.Properlystoresealantattherecommendedtemperaturesandchecksealantforremainderofshelflifebeforeusing.
FIELD CONDITIONS
Allmaterialtobeinstalledmustbeplumb,levelandtrue.Aluminumtobeplacedindirectcontactwithmasonryorincompatiblematerialshouldbeisolatedwithaheavycoatofzincchromate,bituminouspaintornon-metallicmaterial.
Aftersealantissetandarepresentativeamountofthewallhasbeenglazed(250squarefeetormore),runwaterhosetestinaccordancewithAAMA501.2specificationstocheckinstallation.Onlargeprojectsthehosetestshouldberepeatedduringglazingoperation.
CLEaNING MaTERIaLS
Cement,plasterterrazzo,alkalineandacidbasedmaterialsusedtocleanmasonryisveryharmfultofinishes.Anyresidueshouldberemovedwithwaterandmildsoapimmediatelyorpermanentstainingwilloccur.Aspottestisrecommendedbeforeanycleaningagentisused.RefertotheArchitecturalFinishGuideintheDetailCatalog.
EXPaNSION JOINTS
Expansionjointsandperimeterjointsshownintheseinstructionsandintheshopdrawingsareshownatnominalsize.Actualdimensionsmayvaryduetoperimeterconditionsand/ordifferencesinmetaltemperaturebetweenthetimeoffabricationandthetimeofinstallation.Forexample,a12footunrestrainedlengthofaluminumcanexpandorcontract3/32”overatemperaturechangeof50°F.Anypotentialmovementshouldbeaccountedforatthetimeoftheinstallation.
GENERAL INFORMATION (continued)
�
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
GENERAL INFORMATION (continued)
SUGGESTIONS FOR IMPROVING SYSTEM ThERMaL PERFORMaNCE
Tomaintainorimproveyourwallinstallationthefollowingitemsshouldbeconsidered.
A.
B.
C.
D.
E.
Blindsordrapespreventwarmairfromadequatelyflowingoverthewindowsurface.
Warmairventilatorstoofarfromthewindowwillnotadequatelywashthewindowwithairtopreventcondensation.
Inextremeconditionsthefanofthehearingsystemshouldnotcycleonandoff,butshouldruncontinuously.
Someheatingsystemshaveawaterinjectionfeaturethatcanraisehumiditylevels.Thehigherthehumiditylevelsthemorelikelycondensationorfrostwillform.Raisingthetemperatureandreducinghumiditywillusuallysolvetheproblem.
Onrareoccasionsanextremelycoldstormmaycausefrosttoappearontheglassframing.Aspaceheaterandelectricfanblowingalongtheplaneofthewindowwallcanreduceoreliminatethistemporarycondition.
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 �Page
TheframesshowninFIGURES 1 - 4belowarerepresentativeoftypicalframeconfigurationsthatarecoveredintheseinstructions.ContactyourlocalVistawallfacilityforcustomconfigurationsinvolvingnon-standardinstallationmethods.
FRaME CONFIGURaTIONS
Extended Frame (Width > 24’- 0”)
Extended Frame (Width > 24’- 0”) Type “A” Installation
Standard Punched Opening- Type “A” Installation(Verticals Run Through)
Figure 1
Figure 2
Figure 3
Figure 4
Standard Punched Opening - Type “B” Installation (Head and Sill Run Through)
Type “B” Installation
8
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
NOTE:Structuralsiliconeglazedverticalmullionisreferredtoas“SSGMullion.”
1.2
1.1
Details in this manual reflect the 4 1/2” system. 6” system part numbers and dimensions are referenced in parentheses ( ) where applicable.
FRaME FaBRICaTION TYPE “a”
Measure RoughOpeningtodetermineFrameWidthandFrameHeightdimensions.Allow1/2”minimumclearanceforshimmingandcaulkingaroundperimeterofframe.
Cutmaterialtosize.SEE FIGURE 5forguide.
Material Fabrication GuideFigure 5
Frame Width
D.L.O.
Bay Widthat SSG Mull
D.L.O.
FrameHeight
Glazinggasketsshouldbecut1/4”longerperfootofaluminumextrusion.Setasideandlayflatuntilreadytoglaze.
HeadandSill
Verticals,verticalfillerandjambs
VerticalFaceCaps
IntermediateHorizontals(Optional)IntermediateHorizontals
HorizontalGlassStops
HorizontalFaceCaps
HorizontalFaceCaps@SSG
DaylightOpening(D.L.O.)
FrameHeight
FrameHeight
D.L.O.(ScrewSpline)
D.L.O.-1/16”(ShearBlock)
D.L.O.-1/32”
D.L.O.-1/16”
BayWidth-1/16”(SEE FIGURE 5)(Maximumlength3litesor15feet)
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 �Page
1.3
1.4
FRaME FaBRICaTION TYPE “a”
Fabricatevertical/jambmembersforhead,sillandintermediatehorizontalattachment.SEE FIGURE 6, PaGE 10.
Drilljigguide:Aligndrilljigwithtopofhorizontal.Drillholesoutlinedbelowbasedonthemember:
HeadMember(DJ-101)–UseholesD,Efor41/2”system;D,Ffor6”system
ScrewSplineHorizontal(DJ-101)–UseholesA,Bfor41/2”system;A,Cfor6”system
(Optional)ShearBlockHorizontal(DJ-103)–UseholesA,Bfor41/2”system;A,Cfor6”system
SillMember(DJ-101)–UseholesG,Hfor41/2”system;G,Ifor6”system
•
•
•
•
Ifoptionalshearblockhorizontalisused(SEEFIGURE 21, page 23),fabricateholeoneachendofhorizontalperFIGURE 20, page 23.
1.5
Drill5/16”diameterweepholesinhorizontalsandsillmembersat1/4points.InstallICR-312baffleclipsatHorizontals.InstallHP-1004bafflesasrequiredatsill,securingwithSPW-295baffleretainers. SEE FIGURE 7, page 11.
1.6
Drillone5/16”diameterweepholeatthebottomcenterofeachliteofglassatthehorizontalfacecaps.NOTE: ForSSG applications, there will be multiple holes per face cap.
1.7
Drillanchorholesinsillmemberson“V”groove.Headanchorsaresecuredtobuildingconditionbeforeframeissetinplace.Seeapprovedshopdrawingsforlocationandquantityofanchorsandanchorboltsizes.
41/2”system:600lbs.
6”system:1000lbs.(Type“A”)withoptionalheadreinforcingsleeve
•
•
Maximum end reactions:
�0
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
FRaME FaBRICaTION TYPE “a”
Figure 6Type "A" Layout
1"
Use DJ- 101 Drill Jig to prep holes in the Verticals for Head,
Sill and Screw Spline
Cutout for clarity
Use DJ-103 Drill Jig to prep holes in the Verticals for the
Shear Block Horizontal
Cutout for clarity
NOTE: Die lines located on inside of Mullion and Filler may be used to locate attachment holes
A
BA
ALIGN W/TOP OF HORIZ
ALIGN W/TOP OF HORIZ
ALIGN W/BTM OF MULL
@ SILL
ED H
I
G
CF
BC
ICR- 416(ICR- 616)
FS - 8 ( #14 x 1” HHSMS) Typical fastener for Screw Spline attachments
7/8"
Top of Horizontal
3/4”
Top of Horizontal
1/4”
1/4”
5/8” (2 1/2”)
ICR-401 (ICR- 601)Head
“F” (.257) Dia. hole
ICR- 414 (ICR- 614) Screw Spline Horizontal
ICR- 180-01 (ICR- 181-01) Shear Block
FS- 9 (#14 x 1 1/2” HHSMS)
ICR- 412 (ICR- 612) Shear Block Horizontal(Optional)
ICR- 402 (ICR- 602) Sill
#11 ( .191) Dia. holes for Shear Block attachment
ICR - 410(ICR- 610)
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
2.3
2.2
2.1
Priortoapplyingsealanttoanyframemember,thealuminummustbecleaned.Consultsealantmanufacturerforcleaningrecommendations.Steps2.1through2.4refertoscrewsplineassemblyofsystem. Refer to Step 2.5 for optional installationofshearblockhorizontals.
AttachICR-112-01mullcapsusing(2)FS-320#10U-Drivefasteners.InstallandsealasshowninFIGURE 8, page 12.TheattachmentandsealingofthemullcapsisoneofthemostcriticalphasesoftheinstallationoftheType“A”assembly.Specialcareandattentionshouldbegiventothisprocess.
InstallICW-12isolatorclipsonallverticalandhorizontalframingmembersat12”O.C.Staggertheclipsbyapproximately2”attheendsand6”atintermediateclips. SEE FIGURE 9, page 13. Onceclipsareinstalled,snapfacecapsintoposition.Theverticalcapsshouldbeinstalledfirst,thenhorizontal,headandsillcaps.
Sealendsofhorizontalframingmembersbeforeassembly.SEE FIGURE 9, page 13.
If optional head reinforcing sleeves are used (6” system only), refer to Section B, page 33, for instructions before proceeding.
SPW- 295 Baffle
Retainer
HP- 1004 Baffle
Weep HolesFigure 7
Horizontal
Sill
5/16” Dia. Weep Hole
ICR- 312 Baffle clip @ Weeps
FRaME aSSEMBLY TYPE “a”
�2
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
FRaME aSSEMBLY TYPE “a”
Apply bead of sealant at Head and Sill
Tool sealant in glazing after installing Mull Cap to insure proper seal
Apply sealant to ends of Mullion prior to installing Mull Cap
Attach with (2) FS-320 Drive Pins
Mull Cap AttachmentFigure 8
Modify ICR-112-01 Mull Cap
5/8"
Modify Mull Capas shown at Jamb
Apply generous bead of sealant to Mull Cap at Head and Sill just
prior to assembly of units
2.4 Attachhead,sillandintermediatehorizontalstoverticalswith(2)FS-8#14x1”HexHeadscrews.DONOTOVERTORQUESCREWS. SEE FIGURE 9, page 13.
OptionalshearblockhorizontalsmaybeusedwithType“A”installations.BeginbyinstallingICR-180-01(ICR-181-01)shearblockstoverticalsusing(2)FS-9#14x1-1/2”HexHeadscrews.Priortoattachinghorizontalstoshearblocksapplysealanttofaceandtopofshearblockandalongfrontedgeofverticalinlinewithfaceofhorizontal.Rollthehorizontalovertheshearblockandattachwith(1)FS-55#10x½”PhillipsRoundHeadscrew.SEE FIGURE 21, page 23.
2.5
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
6"
12"
2"
Figure 9Type "A" Frame Seals
Apply sealant to Horizontals as shown prior to assembly
ICR-410 (ICR-610)
ICR-416(ICR-616)
NOTE: Additional sealant may be required along face of vertical connections. Tool sealant at these locations to insure proper seals
Apply sealant to Mullion at exterior and interior surfaces prior to assembly (Typical)
ICW- 12 clips @ 12” O.C. stagger as shown
Apply sealant to Horizontals as shown prior to assembly
��
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
FRaME INSTaLLaTION TYPE “a”
3.1 Installframesectionsstartingwithaframeunitcomprisedofajambandverticalmullionwithhead/sillandhorizontals.Eachadditionalframeunitwillbemadefrommullionfillerandamullionuntilyoureachtheoppositeendoftheopening.Thefinalframememberwillbemadefromthemullionfillerandajamb.(Thisdescriptionassumesaribboninstallationwithajambateachend.Yourinstallationmayvary.)
A.
B.
C.
D.
EachframeunitwillbeassembledandsealedasshowninFIGURE 8, page 12 and FIGURE 9, page 13withmullioncapsinstalledasshowninFIGURE 8, page 12.Asecondbeadofsealantisappliedtothefacecapthatisprotrudingintotheopeningjustpriortoassemblyoftheframeunits.SEE FIGURE 8, page 12. NOTE: Sealant must be tooled at head and sill to insure proper seal.
Wheninstallingeachunit,firstslideheadmemberovertheheadanchor,whichhasbeenpreviouslyinstalled,androtateunitintoposition.Eachadjacentunitwillberotatedintoposition,betweenthemullcapsattheheadandsill,andsnappedintoposition.(Afurnitureclampmaybeusetosimplifythesnappingofunitstogether.) NOTE: When optional head reinforcing sleeves are used (6” system only), slide head member into position over head anchor so that reinforcing sleeve is centered on head anchor.
Makesureeachunitisplumb,squareandlevel,anchoringeachunitasitisinstalled.
Onceallunitsareinstalledinspectcaulkjointstoinsureuniformity.
NOTE: For optimal performance of Head Anchor, Die Lines must be visible on the Anchor at the top of the Frame. SEE FIGURE 10 below.
Figure 10Head Anchor Position
CORRECT
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
FRaME INSTaLLaTION
3.2
3.3
3.4
InstallandsealzoneplugsatcapturedverticalsasshowninFIGURE 11.WherethereareSSGverticals,installandsealaluminumbridgesperinstructionsinStep 3.4.
Sealperimeterofframe.Caremustbetakentomarrysealsatthecornersoftheframe.Interiorsealsarenotrequiredforsystemperformancebutmaybenecessaryforcosmeticpurposes.Wheninstallingexteriorsealitisrecommendedthatthesealberunpriortoinstallingfacecaps.Keepweepholesatsillclearofsealant.Neverrunperimetersealalongouteredgeoffacecap.
SSGBridgeInstallation:AnaluminumbridgemustbeinstalledateachhorizontaltoverticalconnectionwhenusingaSSGmullion.Attachtothehorizontalsusing(2)FS-202#8x½”PanHeadscrews.Applysealanttothehorizontalmemberandtothematingsurfaceofthebridge.Setbridgeinplaceandattach.Toolsealantaroundtheperimeterofthebridgeandalongthefaceofthemullion.Capsealfasteners.Thejointatthefaceofthebridgetothehorizontalmustalsobesealed.SEE FIGURES 12, 13, & 14, page 16.
Figure 11
Bed in sealant
Seal Zone Plug to form a water tight seal
ICR-107-01 Mullion (deep pocket)ICR-110-01 Mullion (shallow pocket)ICR-108-01 Jambs
Zone Plug Installation
��
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
After Bridge is installed seal joints between Bridge and Horizontals
Figure 12Head Bridge
Figure 13Horizontal Bridge
Figure 14Sill Bridge
ICR- 106-01Bridge
Cap Seal Fasteners
Apply sealant to top of Bridge
ICR-104-01 BridgeApply sealant to top of Horizontal
Attach Bridges with (2) FS-202 (#8 x 1/2” PPH)
After Bridge is installed seal joints between Bridge and Horizontals (Typical)
Apply sealant to top of Bridge
ICR- 105- 01 Bridge
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
FRaME FaBRICaTION TYPE “B”
NOTE:Structural silicone glazed vertical mullion is referred to as “SSG Mullion”.
4.1 MeasureRoughOpeningtodetermineFrameWidthandFrameHeightdimensions.Allow½”minimumclearanceforshimmingandcaulkingaroundperimeterofframe.
4.2 Cutmaterialtosize.SEE FIGURE 15forguide.
Material Fabrication Guide
Frame Width
FrameHeight
D.L.O.
Bay Widthat SSG Mull
D.L.O.
Figure 15
Details in this manual reflect the 4 1/2” system. 6” system part numbers and dimensions are referenced in parentheses ( ) where applicable.
HeadandSill
HeadandSillFaceCaps
VerticalsandJambs
VerticalFaceCapsIntermediateHorizontals
HorizontalGlassStops
HorizontalFaceCaps
HorizontalFaceCaps@SSG
FrameWidth
FrameWidth
FrameHeight
FrameHeight-35/16”
FrameHeight-49/16”
D.L.O.-1/16”
D.L.O.-1/16”
BayWidth-1/16”(SEE FIGURE 15)
D.L.O.-1/32”
�8
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
4.3 Fabricatehead&sillmembersforvertical/jambattachment.UseDJ-101drilljigtodrilltheholesatthesillmemberandDJ-104fortheheadmember.SEE FIGURE 16, page 19.
Drilljigguide:
Aligndrilljigwithsideofmullionathead&sillmember.Drillholesoutlinedbelowbasedonthemember:
HeadMember(DJ-104)–Useholes1,2,3,4for41/2”system;A,B,C,Dfor6”system
SillMember(DJ-101)–UseholesA,B,G,Hfor41/2”system;A,C,G,Ifor6”system
NOTE: Only two (2) holes are needed for the 4 1/2” system.Drilling four (4) holes is recommended in case verticals must be flipped for pocket orientation.
•
•
4.4 AligndrilljigDJ-103withtopofHorizontal.Fabricateverticalmullionsforintermediatehorizontals.Notchtopofallverticalsandjambsforheadmember. SEE FIGURE 16, page 19.
4.5 Ifhorizontalsarerequired,fabricateholeoneachendofhorizontalperFIGURE 20, page 23.
4.6 Drill5/16”diameterweepholesinhorizontalsandsillmembersat1/4points.InstallICR-312baffleclipatHorizontalsandHead.InstallHP-1004bafflesasrequiredatsill,securingwithSPW-295baffleretainers.SEE FIGURE 18, page 21.
4.7 Drillone5/16”diameterweepholesatthebottomcenterofeachliteofglassatthehead,sill,andhorizontalfacecaps. NOTE: For SSG applications, there will be multiple holes per cap.
4.8 Drillanchorholesinsillanchors(TCR-102for4½”systemorICR-103for6”system).Headanchorsaresecuredtobuildingconditionbeforeframeissetinplace.Seeapprovedshopdrawingsforlocationandquantityofanchorsandanchorboltsizesforbothheadandsillanchors.
Maximum end reactions:
41/2”system:600lbs.
6”system:1000lbs.(Type“B”)withoptionalhead&sillreinforcingsleeves).
•
•
FRaME FaBRICaTION TYPE “B”
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
FRaME FaBRICaTION TYPE “B”
1 3/4"
Mullion Centerline
Mullion Centerline
7/8"
5/8"
2"
1" (2")
1 1/4"
9/16"
DRILL "F" (.257) DIA.HOLES @ HEAD, SILLON "V" GROOVES
FIGURE 16Type "B" Fabrication and Assembly
7/8"
1 3/4"
ICR-452 (ICR-652) Sill
ICR-450 (ICR-650) Mullion
ICR-180-01 (ICR-181-01)Shear Block
Top of Horizontal
Drill #11 (.191) Dia.Tap holes for Shear Blocks
5/8"1" (2")
ICR-454 (ICR-654)SSG Mull
ICR-453 (ICR-653) Jamb
3/4"
ICR-412 (ICR-612)Horizontal
FS-9 (#14 X 1 1/2" HHSTS)
(2) Hole pattern for 4 1/2” system;(4) Holes required at 6” system(Typical @ Head/Sill)
Use DJ- 104 Drill Jig to prep holes in
the Sill for Verticals
Use DJ- 104 Drill Jig to prep holes in the Head for Verticals
4 1/2" Head
6" Head
4 1/2" Sill
6" Sill
Cutout for clarity
ICR- 451 (ICR- 651) Head reference Sill for fabrication dimensions
Notch top of Jambs and Captured Mullions (Typical)
Use DJ- 103 Drill Jig to prep holes in the verticals for the Shear Block Horizontal
Assemble Head and Sill with FS- 8 ( #14 x 1” HHSTS )
A
ALIGN W/TOP OF HORIZ
BC
DA
BC
FI
HGE
ALIGN W/TOP OF
HORIZ & MULL
ALIGN W/TOP OF
HORIZ & MULL
DA
BC
F
IH
GE
ALIGN W/TOP OF
HORIZ & MULL
ALIGN W/TOP OF
HORIZ & MULL
20
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
Ifframehashorizontals,attachShearBlockstojambsandverticalmullionswith(2)FS-9#14x1½”HexHeadscrews.
5.1
5.3
5.2
FRaME aSSEMBLY TYPE “B”
If optional Head & Sill reinforcing sleeves are used (6” system only), refer to Section B, page 33 for instructions before proceeding.
Attachjambsandverticalmullionstotheheadandsillusing(2)FS-8#14x1”HexHeadscrews(4½”system)or(4)FS-8#14x1”HexHeadscrews(6”system).Ifheadistobeusedforincidentalwater,screwsmustbecapsealed.
If frame is to accommodate incidental water at the head, slide strap anchors into head member prior to installing end caps (STEP 5.3) and setting the frame in the opening.
Attachaluminumendcapstoeachendofheadandsillmemberswith(2)FS-320U-driveandsealasshownonFIGURE 17.
ICR-109-01FS-320Seal over extra hole
FIGURE 17End Cap Attachment
Fully seal pocket
ICR-109-01 (ICR-130-01)
(ICR-130-01)Apply sealant to End Cap before installing
Apply sealant to bottom of End Cap prior to attaching Jamb
Apply sealant to top of End Cap prior to attaching Jamb
Seal upper section of End Dam for incidental water only
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 2�Page
FRaME FaBRICaTION TYPE “B”
Weep HolesFigure 18
HP-1004Baffle
SPW-295
Horizontal
Head
5/16” Dia. Weep Hole @ 1/4 points of ea. Lite; (Typical at Horiz. and Sill and incidental Water Head)
NOTE: Weep required at Head for incidental water only!
Baffle Retainer
ICW-12 Clip typicalICR- 312 Baffle Clip @ incidental Water Head
Sill
ICR- 312 Baffle Clip @ Weeps
22
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
Figure 19Type "B" Frame Seals
Stagger Clips as shown at Head and Sill members
Apply sealant to top of Jamb at inside and exterior surfaces as shown
ICW-12 Clips (Typical)ICW-312 Clip at weeps for incidental water head installations
NOTE: Additional sealant may be required along face of vertical to Head and Horizontal connections. Tool sealant at these locations to insure proper seals.
Applysealant to top of SSG Mullion
Apply sealant to Mullion along interior and exterior surfaces of Mullion as shown
ICW-12 (Typical)ICW-312 at weeps
Apply sealant along face of Mullion and Shear Block prior to installing Horizontal
Apply sealant at inside and outside surfaces of Sill at captured Mullions and Jambs
ICW-12 Clips @ 12” O.C. stagger as shown
Apply sealant as shown at SSG Mullion
Apply sealant at Jambs as shown
FRaME SEaLING TYPE “B”
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 2�Page
Figure 20Horizontal Mullion Fabrication
Figure 21Horizontal Installation
FS-55 (#10 X 1/2" PPH)
1/2"Locate on V-Groove
#25 ( .149”) Dia. tap hole for #10 screw (centered on V-Groove)
Drop Horizontal over Shear Block then push back to lock
See Page 17 for the required application of sealant prior to installation of Horizontal
Keep hook area free from sealant for glazing bead installation
FRaME aSSEMBLY TYPE “a”
2�
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
5.4 Sealendsofverticalandhorizontalframingmembersbeforeassembly.SEE FIGURE 19, page 22.
5.5 Horizontalscanbeattachedeitherbeforeoraftertheframeisinstalledintheopening.Priortoattachingintermediatehorizontals,applysealanttothefaceofshearblockandalongouterfaceofmullionwherehorizontalwillintersecttheface.Rollthehorizontalovertheshearblocksandattachwith(1)FS-55#10x½”PhillipsPanHeadscrew.SEE FIGURE 20 & 21, page 23.
FRaME INSTaLLaTION TYPE “B”
6.1 Shimcontinuoussillanchorofffloor.Anchormustbelevel.SEE FIGURE 22forshimplacement.Endsofsillanchorshouldbeequaldistancefromwalloneithersideofopening.Refertoapprovedshopdrawingforanchorsizeandplacement.NOTE: Front of sill anchor is 2 3/16” (3 11/16”) in front of rear edge of wall.
6.2 Priortosettingframe,installheadanchorsintoperimeteropening.SEE FIGURE 23. If optional reinforcingsleeves are used (6” system only), refer to Section B, page 33 for instructions before proceeding.NOTE: Front edge of head anchor is 3 1/8” (4 5/8”) in front of rear edge of frame. Slideheadofframeovertheheadanchorandrotateintoposition,thenlowerontosillanchor.Checktoinsurethatframeisplumb,squareandlevel.Checkcaulkjointstoinsureuniformity.NOTE: For optimal performance of Head Anchor, die lines must be visible on the anchor at the top of the frame. SEE FIGURE 23.
Head Anchor PositionFigure 23
CORRECT
3 1/8" (4 5/8")
Shim placement at Sill Anchor
1" 2 3/16"(3 11/16")
Figure 22
See Figure 32, Page 34 for optional Head reinforcing at 6” system
See Figure 32, Page 34for optional Sill reinforcing at 6” system
FRaME aSSEMBLY TYPE “B”
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 2�Page
Head Anchor PositionFigure 23
CORRECT
3 1/8" (4 5/8")
Shim placement at Sill Anchor
1" 2 3/16"(3 11/16")
Figure 22
See Figure 32, Page 34 for optional Head reinforcing at 6” system
See Figure 32, Page 34for optional Sill reinforcing at 6” system
InstallandsealzoneplugsatcapturedverticalsasshowninFIGURE 24, page 26.WherethereareSSGverticals,installandsealaluminumbridgesperinstructionsinSTEP 6.5.
FRaME INSTaLLaTION TYPE “B”
6.3
6.5
6.4 SSGBridgeInstallation:AnaluminumbridgemustbeinstalledateachhorizontaltoverticalconnectionwhenusingaSSGmullion.Thebridgewillbeattachedtothehorizontalsusing(2)FS-202#8x½”PanHeadscrews.Sealantwillbeappliedtothehorizontalmemberandtothematingsurfaceofthebridge.Setbridgeinplaceandattach.Toolsealantaroundtheperimeterofthebridgeandalongthefaceofthemullion.Capsealfasteners.Thejointatthefaceofthebridgetothehorizontalmustalsobesealed.SEE FIGURE 25, page 26.
Sealperimeterofframe.Caremustbetakentomarrysealsatthecornersoftheframe.Interiorsealsarenotrequiredforsystemperformance,butmaybenecessaryforcosmeticpurposes.Wheninstallingexteriorsealitisrecommendedthatthesealbeappliedpriortoinstallingfacecaps.Keepweepholesatsillclearofsealant.Neverapplyperimetersealalongouteredgeoffacecap.
6.6 InstallICW-12isolatorclipsonallverticalandhorizontalframingmembersat12”O.C.Staggertheclipsbyapproximately2”atendsand6”atintermediateclips.SEE FIGURE 19, page 22.Onceclipsareinstalled,snapfacecapsintoposition.Thehead&sillcapsshouldbeinstalledfirst,thentheverticals.Completetheinstallationwithhorizontalfacecaps.
FRaME SPLICING TYPE “B”
WhentheFrameWidthexceeds20’-0”,theheadandsillmembersmustbespliced.Locatesplicejointsatornearmid-lite.Splicesillanchors12”fromtheframesplice.Headandsillmembersshouldbecuttoallow1/4”splicejointbetweeneachframesection.Sillanchorscanbebuttedtogether.Locateananchorbolt3”fromeachsideofthesillanchorjoint.
7.1 Priortosettingframesinplace,applyanon-hardening,non-skinningsealanttobothsidesofthesplicejointattheheadandsillmembers.AttachsplicestoonesideofframewithFS-55(#10x1/2”PhillipsPanHead)asshowninFIGURE 26, page 27.
7.2 Placesplicesleevesinheadandsilloffirstframesection,slidethenextframesectionoverthesplicesleevetoachievea1/4”joint.SEE FIGURE 26, page 27.
7.3 Offsetheadandsillfacecapsplicejointsby3”frommainmembersplices.Setjointatfacecapsat1/2”andsealasnecessary.
7.4 Followinstructionsforshimmingandanchoringofframe.
7.5 Sealovergapatsplicejoint.
2�
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
Figure 24Zone Plug Installation
Bridge InstallationFigure 25
Seal Zone plug to form a water tight
seal
ICR-107-01 Mullion (deep pocket)ICR-110-01 Mullion (shallow pocket)ICR-108-01 Jambs
ICR-105-01 BridgeAttach bridges with(2) FS-202 (#8 X 1/2" PPH) Cap Seal Fasteners
Bed in sealant
Apply sealant to top of Horizontal
After Bridge is installed seal joints between Bridge and Horizontals (Typical)
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 2�Page
Figure 24Zone Plug Installation
Bridge InstallationFigure 25
Seal Zone plug to form a water tight
seal
ICR-107-01 Mullion (deep pocket)ICR-110-01 Mullion (shallow pocket)ICR-108-01 Jambs
ICR-105-01 BridgeAttach bridges with(2) FS-202 (#8 X 1/2" PPH) Cap Seal Fasteners
Bed in sealant
Apply sealant to top of Horizontal
After Bridge is installed seal joints between Bridge and Horizontals (Typical)
Figure 26Head & Sill Member Splicing
ICR-120-01
3"Head Splice
1/2"
Face Splice Sill Splice3"
ICR-117-01
FS-55
FS-55 ICR-119-01 (ICR-124-01)ICR-451 (ICR-651)Head
3"
Face Splice
1/2"
ICR-452 (ICR-652)Sill
ICR-118-01 (ICR-123-01)
1/4"
1 1/2"1/4"
1 1/2"3”
28
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
Startglazingtheframefrombottomandworkup.
GLaSS SIZE CaLCULaTION:
GLaZING
8.1
D.L.O.+1”FORWIDTH&HEIGHTatCAPTUREDSYSTEMD.L.O.+13/4”FORWIDTHatSSGSYSTEM(VERTICALSONLY)
D.L.O.+1”atCORNERMULLIONS(CAPTURED)
Toavoidsealantcuringbeforeglassissetinplace,andcontaminationfromjob-sitedebris,glazingprepmustbedoneaseachopeningisglazed.Donotpre-sealthegasketsintheentireframe;installandsealgasketsasyouarereadytosetglassineachopening.Installexteriorgaskets.Gasketsatverticalsrunthrough;horizontalgasketsbuttintoverticalgaskets.Crowdthegasketsintothecorners,cuttingthehorizontalgasketsatanangletomatchthebevelonadjoininggaskets.Gasketsshouldberemovedfromtherollandallowedtorelaxovernightbeforecutting.CutallgasketstoD.L.O.plus1/4”perfootofaluminumextrusion.Sealjointbetweenthecornersofthegasketsjustpriortoglazing;sealallexteriorcorners.
NOTE: Sealant is not required at the horizontal gasket abutting an SSG mullion. This gap will be sealed during application of structural silicone.
8.2 Positionsettingblocksatcorrectlocation(twoperlite).Refertoapprovedshopdrawingsordeadloadchartsforlocations.Stakethehooksonbothsidesofsettingchairatsill.Lubricationonthetopofthesettingblockwillhelpinsurepropersettingforlitesofglass.NOTE: Consult glass manufacturer for correct setting block location and length for lites larger than 40 sq. ft.
8.3 Setglassinopening.Ensurethatglassbiteisequalonallsides.SEE FIGURE 27 & 28, page 29forglazingsequence.CaUTION:Be certain that glass is placed firmly against exterior gasket to insure a proper seal and toavoid binding of the glass on the setting block.
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 2�Page
Glazing Frames with SSG MullionsFigure 28
Glazing Frames with Captured MullionsFigure 27
Type "B"
Type "A"
Type "B"
Type "A"3
2
4
1
4
2
3
1
4
23
1
3
4
1
2
GLaZING
�0
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
Figure 29Side Block Installation
GP-125 “W” Block
Temporary Wedge Gasket
Expanded “W” Block (See view at left)
GP-109 Side Block at shallow pocket (install before glass is set)
8.4 Installsideblocksinverticalmullionsasrequired. SEE FIGURE 29.Consultglassmanufacturerforpreferredlocationinseismicareas.NOTE: Side Blocks are optional and not required at SSG Mullions.
8.5 Installglassstopsandruninteriorwedge,crowdingintocorners.Sealcornersofwedgegasketsatthebottomofeachliteafterallgasketshavebeeninstalled.WedgeshouldbeallowedtorelaxandcutlongasdescribedinSTEP 8.1.
GLaZING
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
REGLaZING PROCEDURES
NOTE: These instructions cover the replacement of glass below an intermediate horizontal or head member. Glass size for reglazed lites is D.L.O. + 1”.
A.1
A.2
Removefacecapfrommembersaboveaffectedlite.
Removeliteofglassandallglazinggasketsfromopeningtobeglazed.
A.3 Thebottomlegofthehorizontalorheadabovetheremovedlitemustbecutaway.CarefullycutalongtheV-groovealongthefaceoftheleg.SEE FIGURE 30.
A.5 Glazenewlite,checkingtomakesurethesettingchairandsettingblockareproperlylocated.Caremustmetakenduringglazingsoasnottodisturbinteriorgasket.Holdglassinplacetemporarilywithshortpiecesoftheedgegasketatthesideofthelite.
Modification for Exterior Reglazing(Shear Block Horizontal Shown. Head and Screw Spline Horizontal Require Same Modification)
Figure 30
Cut at V-Groove
A.6 Runacontinuousbeadofsealantalongthefaceofhorizontal,thenscrewapplythereglazingadaptorwithFS-55#10x1/2”PhillipsPanHeadscrewsat12”O.C.(11/2”fromends).Sealheadsofallfasteners.Pre-drillornotchfaceofreglazelegatweepholes.SEE FIGURE 31,page 32
A.7 Installwedgegasketaroundexteriorofliteandsealallcorners.Replacehorizontalfacecapstocompletethereglazingprocedure.
�2
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
REGLaZING PROCEDURES
Exterior ReglazingFigure 31
Continuous bead of sealant
ICR-208 Head reglaze leg attach w/ FS-55 @ 12” O.C.
Continuous bead of sealant
ICR-207 reglaze leg attach w/ FS- 55 @ 12” O.C.
Pre-drill or notch leg or reglaze leg to clear weep holes
Keep weep clear of sealant
Seal screw head
PSA-backedgasket
Wedge Gasket
GP-100 gasket for reglaze only
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
OPTIONaL hEaD & SILL REINFORCING6” SYSTEM DEPTh ONLY
Optional reinforcing sleeves are available with Type “A” systems (head only) and Type “B” systems (Head & Sill) when end reactions exceed 600 lbs. Do not pre-install head anchors onto building condition.
B.1 Priortoassemblingframe,slidereinforcingsleevesandheadanchorsintopositionasfollowsSEE FIGURE 32, page 34:
Type“A”&“B”Head:AtheadanchorlocationsorperapprovedshopdrawingsType“B”Sill:Ateachverticalorperapprovedshopdrawings
B.2 Attachjambsandverticalmullionstotheheadandsillmembers.RefertoSTEP 2.4,page 12forType“A”systemsandSTEP 5.2, page 20forType“B”systems.
NOTE: Assembly screws for verticals and jambs run through the sill reinforcing sleeves.
��
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
Figure 32
Head anchor (Do Not pre-install onto building)
Install 6” reinforcing sleeve prior to attaching Mullion sleeve located at Head anchor (see Detail A for location)
Access holes
Vertical attachment screw beyond
Vertical Mullion
Vertical attachment screw. Fasten through reinforcing sleeve
Install 8” reinforcing sleeve prior to attaching Mullions. Sleeve located at Vertical Mullion connections. (See Detail “A” for location)
Head and Sill Reinforcing Sleeves (6” System)
Refer to approved shop drawings Head anchor
Head reinforcing sleeve
Refer to approved shop drawings
Seal reinforcing sleeve
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
PaRTS LIST
Vertical Mullion
Type "A" System Extrusions
ICR-410
ICR-401Head
ICR-402Sill
ICR-403Jamb
ICR-424SSG Vertical Mullion
ICR-405Sill Glazing Bead
ICR-416Vertical Mullion Filler
ICR-414
Screw SplineHorizontal
ICR-450
ICR-452
ICR-453Jamb
ICR-454SSG Vertical Mullion
Vertical Mullion
Head
Sill
ICR-264
Outside 135 DegreeSSG Corner Mullion
ICR-203
Outside 90 DegreeFace Cover
ICR-204
Outside 135 DegreeFace Cover
ICR-240
Outside 90 DegreeCorner Mullion Half
ICR-241
Outside 90 DegreeCorner Mullion Half
ICR-263
Outside 135 DegreeCorner Mullion
D-208Door Subframe
FG-3280Transom Header
TCR-102Sill Anchor
Outside 90 DegreeSSG Corner Mullion
ICR-242
ICR-413
Head & HorizontalGlazing Bead
ICR-412
Horizontal(Shear Block Ass'y)
Type "A" & "B" Extrusions
DESCRIPTIONITEM
2 1/4" x 4 1/2" SYSTEM
Vertical MullionICR-610
ICR-601Head
ICR-602Sill
ICR-603Jamb
ICR-624SSG Vertical Mullion
ICR-605Sill Glazing Bead
ICR-616Vertical Mullion Filler
ICR-614
Screw SplineHorizontal
ICR-650
ICR-651
ICR-652
ICR-653Jamb
ICR-654SSG Vertical Mullion
Vertical Mullion
Head
Sill
ICR-103Sill Anchor
DESCRIPTIONITEM
2 1/4" x 4 1/2" SYSTEMType "A" System Extrusions
2 1/4" x 6" SYSTEM
Type "B" System Extrusions
DESCRIPTIONITEM
Type "B" System Extrusions
ICR-451
��
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
PaRTS LIST
Reglaze Legfor Horizontal
ICR-207
ICR-208
Reglaze Legfor Head Members
ICR-209
Glazing Adaptor1
4" Infill - Captured
ICR-210
Dual Glazing Adaptor1
4" Infill - SSG
ICR-211
FG-2145Door Stop
FG-3324Sash
FG-3325Sash Glazing Stop
Single Glazing Adaptor1
4" Infill - SSG
ICR-117-01
Sill SpliceSystem "B"
ICR-118-01
ICR-120-01
ICR-119-01
Sill SpliceSystem "B"
Head SpliceSystem "B"
Head SpliceSystem "B"
ICR-201
Snap-in Pocket Filler
ICR-200Typical Face Cover
ICR-274
Outside 135 DegreeSSG Corner Mullion
ICR-213
Outside 90 DegreeFace Cover
ICR-214
Outside 135 DegreeFace Cover
ICR-250
Outside 90 DegreeCorner Mullion Half
ICR-251
Outside 90 DegreeCorner Mullion Half
ICR-273
Outside 135 DegreeCorner Mullion
D-608Door Subframe
FG-3468Transom Header
Outside 90 DegreeSSG Corner Mullion
ICR-252
ICR-613
Head & HorizontalGlazing Bead
ICR-612
Horizontal(Shear Block Ass'y)
ICR-202
Inside 90 DegreeCorner Closure
ICR-205
Inside 135 DegreeCorner Closure
Type "A" & "B" Extrusions
ICR-109-01
End Dam at Head/SillSystem "B"
ICR-113-01
90 deg. Corner ClipSystem "B"
ICR-115-01
135 deg. Corner ClipSystem "B"
ICR-121-01
Outside 90° CornerEnd Cap
System "A"
Shear Block
ICR-180-01
Accessories2 1/4" x 4 1/2" SYSTEM
Head AnchorSystem "A" & "B"
ICR-100-01
Common Extrusions4 1/2" x 6" SYSTEMS2 1/4" x 6" SYSTEM
DESCRIPTIONITEM DESCRIPTIONITEM
DESCRIPTIONITEM
Common Extrusions4 1/2" x 6" SYSTEMS
DESCRIPTIONITEM
FG-3160(OHCC Closer)
FG-3287
Door Header @ Transom(Surface Closer)
DS-104Door Stop
FG-3168
Door Header(Surface Closer)
ICR-245
SSG Outside 90 Corner Spear
F-57
1” X 1” X .125 Tube atSSG Corners
ICR-225 RIBBON WINDOW INSTALLATION AND GLAZING MANUAL
March 2008 ��Page
PaRTS LIST
ICR-159-01
End Dam at Head/SillType "B"
ICR-123-01
ICR-124-01
Sill SpliceType "B"
Head SpliceType "B"
ICR-163-01
90 deg. Corner ClipType "B"
ICR-165-01
135 deg. Corner ClipType "B"
ICR-171-01
Outside 90° CornerEnd CapType "A"
Head AnchorType "A" & "B"
Shear Block
ICR-101-01
ICR-181-01
ICR-135-01
6" Head Reinforcing Sleeve
ICR-125-016" Head Reinforcing Sleeve
ICR-126-018" Sill Reinforcing Sleeve
Accessories2 1/4" x 6" SYSTEM
ICR-107-01/ICR-110-01
Zone Plugsat Mullions
(Package for deep & shallow pocket - 50ea.)
ICR-108-01
Zone Plug at Jambs
ICR-104-01
SSG Bridge at HeadType "A"
ICR-105-01Type "A" & "B"
DESCRIPTION
Common Accessories
SSG Bridge at Horizontal
ITEMDESCRIPTIONITEM
ICR-182-01 /Outside 90 Degree
Shear BlockICR-182-02
ICR-127-01
Inside 90 Degree Corner Mull Cap
Type “B”
ICR-128-01
Inside 135 Degree Corner Mull Cap
Type “B” HP-1004Weep Baffle
SPW-295
Weep BaffleRetainer
ICR-114-01
Sill End Dam @ PocketType "B"
ICR-122-01
Inside 90° CornerEnd CapType "A"
Temporary GlazingRetainer
Drill Jig forScrew Spline Ass'y(Head, Horiz, Sill)
SPW-PP-3
DJ-101
Drill Jig forShear Block Ass'y
(for ICR-412 & ICR-612)DJ-103
Entrances & Corners
Drill Jig forType "B" Head & Sill
DJ-104
A
B
C
E
F
I
H
SCREW SPLINE
HORIZ.
SCREW SPLINE
HEAD
SCREW SPLINE
SILL
ALIGN W/TOP OF HORIZ.
ALIGN W/BTM OF MULL AT SILL
ICR
-225
RIB
BO
N W
IND
OW
DJ-
101
B
C
SHEAR BLOCK HORIZ.
ALIGN W/TOP OF HORIZ.
ICR
-225
RIB
BO
N W
IND
OW
DJ-
103
ICR-225 P
/N DJ-104
HOLE PREP - TYPE "B" H
EAD
ALIGN W/SIDE OF MULL
ALIGN W/SIDE OF MULL
1
2
B
A
4
D
C
ICR-112-01
Mull CapType "A"
ICR-106-01
SSG Bridge at SillType "A"
GP-109Side Block
GP-125"W" Side Block
ICW-12Typical Isolator Clip
ICR-312
Isolator Clipat Weep Holes
SSG Spacer
GP-102
ICR-116-01
Temporary ClipOS135 SSG Corner
Corner ClosureIsolator
ICR-206
ITEM DESCRIPTION
Common Accessories
GP-129
SSG Spacer for3/16" F.C.
Interior ReglazeGasket
Exterior Gasket(Sponge)
Exterior Gasket(Dense)
GP-123
GP-124
GP-100
Interior Wedge1 1/8" Glazing
Exterior Gasket1 1/8" Glazing
(Sponge)GP-127
GP-128
Interior WedgeGP-113
�8
ICR-225 RIBBON WINDOWINSTALLATION AND GLAZING MANUAL
PageMarch 2008
PaRTS LIST
#10 X 3/4" P.P.H.Attachment of
Corner Closures
#14 X 1 1/2" H.H.S.T.S.Assembly Screw
Attachment of ShearBlock to verticals#10 x 1/2" P.R.H.
Attachment of Horizontals to Shear Blocks
#10 x 1/2" U-Driveat Mull Caps
#8 x 1/2" P.P.H.Attachment ofSSG Bridge
#14 X 1" H.H.S.T.S.Assembly Screw
FS-6
FS-8
FS-9
FS-55
FS-202
FS-320
GP-101
TCR-310-01
Vinyl Setting Chairat Sill
DESCRIPTIONITEM
Setting Blockat Horizontal & Sill
Common Accessories