icp “yurt” footprint m cc m2 f meeting tent p imet fban sitl misc map table oc ops / air /...
TRANSCRIPT
![Page 1: ICP “Yurt” FOOTPRINT M CC M2 F Meeting Tent P IMET FBAN SITL MISC Map Table OC OPS / AIR / SAFETY IC COPY MISC DOCL Supply Cache GIS Ordering COMMOIC/Dep](https://reader036.vdocuments.us/reader036/viewer/2022080917/56649ec05503460f94bcc4a9/html5/thumbnails/1.jpg)
ICP “Yurt”FOOTPRINT
F
MeetingTent
P IMETFBAN
SITLMISC
Map Table
O C IC
SupplyCache
GIS
Ordering COMMO IC/Dep IC
PLANS
Trailer or Yurt
Finance
CI / DCheck InDEMOB
HR / THR &
Train Spec
Comp/ClaimsPatient Care Area
GroundSupport
GS
AM Briefing AreaMap Board
If Only One Fax/Copier Available, Locate Between
Repeated Users; Plans Primarily Copies Once/Day
MISC = Como Storage / Rental PC Box Storage
FAX
FAXCheck In / Demob Located at Main Street Entrance
Primary Visitor / FF Entrance
INFO Located at Main Street Entrance to
Intercept Media/Visitors
Ordering Requesting PC to Test Sending Gen
Messages & Receive Fax Via PC
MISC = LTAN / FOBS / Etc.
GIS “Trailer” Near SITL & PLANS
Off Site (ICP) Location
Off Site Facilitate Parking / Traffic Safety Objectives
LOCATE AS CLOSE TO ICP AS POSSIBLE to Facilitate I-Suite Supply Module BUT Maintain Traffic Safety Objective
ICP Main Street (MS)
Locate “Near” Crew Sleeping Area
Locate To FacilitateSemi Private HR Sessions
Locate Heavy I-Suite &Doc Server Users
[F, P, CI, D, IMET/FBAN]Parallel To CROW
Computer RoomOn Wheels
CROW
Blue Rooms /Hand Washing Station
WM
MH
Blue Rooms /Hand Washing Station
W M M H
Blue Rooms /Hand Washing Station
P = Reserved For Patients
W M P H
Locate Outside MSCongestion Concerns
MorningCoffee
CrewPhones
Kit PC
2-Kit PCs
Kit PC
Wireless Access (Team3Crow) Primarily Doc Server Users
Hard Wire
Wireless
PRT
PRT
PRT
Wireless
Wireless
Kit EquipmentRental Equipment
Lege
nd:
I-Suite Connection: Wireless/Hardware orSupply Module Bridge/Client Wireless
GIS Stand Alone Network & Hard Drive
WirelessDependingOn DistanceTo CROW
Medical
PLOT / 11x17 PRT
Optional ConnectionTo Doc Server
FAX/PRT/COPIER
LLogistics
Gen FF Use Rental PC
Casual Overhead Use Kit PCRental PC
IINFO
WWEBMs
WEBM & IOFQuiet Area Away
From Visitor Foot TrafficTo Produce Info/Web
Products
PreferH
ome Runs
YURT To CRO
W
DRAFTPlease Provide
Your Input
Computer RoomOn Wheels
CROWPRT 2 ServersCTSPs
Note: Map Table Outside to Facilitate OPS/SITL /Etc. Review;Table May Need To Be Covered Depending on Weather
Last Revised09/16/10 0830
Strategy,Planning,C&G &Misc WorkGroups
Positions InThese 2
YurtsDependentOn Incident
NOT TO SCALE – Relative Position Only
Position Yurt For Privacy
Concerns
General Leadership Info Board[IAP / Logistic Info Sheet]
May Need2 Yurts or Locate in Under Utilized
Yurt Depending On Incident
![Page 2: ICP “Yurt” FOOTPRINT M CC M2 F Meeting Tent P IMET FBAN SITL MISC Map Table OC OPS / AIR / SAFETY IC COPY MISC DOCL Supply Cache GIS Ordering COMMOIC/Dep](https://reader036.vdocuments.us/reader036/viewer/2022080917/56649ec05503460f94bcc4a9/html5/thumbnails/2.jpg)
ICP IT EQUIPFOOTPRINT
F P IMETFBAN
SITLMISC
Map Table
OI C IC
GIS
INFO Ordering COMMO IC/Dep IC
PLANS
Trailer or Yurt
Finance
CI / DCheck InDEMOB
HR / THR &
Train Spec
GroundSupport
GS
PRTFAX
All In One[FAX/PRT/COPIER]
Primary Visitor / FF Entrance
Ordering Requesting PC to Test Sending Gen Messages &
Receive Fax Via PC
Off Site (ICP) Location
Computer RoomOn Wheels
CROW
Gen FF Use Rental PC
Casual Overhead Use Kit PC
Rental PC
Kit PC
2-Kit PCs
Kit PCHard Wire
PRT
PRT
Med COPIER
Kit EquipmentRental EquipmentAgency EquipShare ICP IT Equipment
Lege
nd:
GIS Stand Alone Network & Hard Drive
WirelessDependingOn DistanceTo CROW
Medical
PLOT / 11x17 PRT
GSUL
HRFACLFUDLIACRDOCLSECMLOFR
Note: Any PositionMay Utilize Other ITEquipment As It Is
Available
SKDNDEMB
FSCTIMEEQTRCOST [GIS PC]PROC
GIS [GIS PC]GISS
IOFIOFIOF
Minimum IT Equipment Needs
ORDM COMOPositions
COML
ICDep IC
SOFABODOther AIRPositions
OSCsDIVSsOther OPS
LLogistics
RESLRESLPSCDPSC
SUPL / I-SUITE SUPPLYMODULE [PCs & Prt]
COMPMEDLIMSM
LSC/DLSCOther LOGS
Positions
WWEBMs
WEBM
The objective of this diagram is to provide an IT Equipment Access minimum/initial strategy for all positions to perform their functions. Additional IT equipment can be rented based on the incident needs and situation.
2 ServersCTSPs
11x17ColorPRT
IT Equipment Summary5 - Kit PCs3 - Network BW Prt2 - 11x17 Color Prt1 - GIS Plotter1 - All In One Prt[Goal: All Prt Devices Networked]
2 - GIS PCs10 - PCs2 – Copier2 – BW Prt2 – Fax[Note: Prt & Fax Can Sometimes Be Combined in One Device]
LargeCOPIER
PRT
FAX/PRT
Last Revised09/16/10 0830
DRAFTPlease Provide
Your Input
MeetingTent Supply
Cache
Map Board
[Positions Bringing Agency Equipment May Vary Over Time]
NO
T TO SCALE – Relative Position O
nly
Ordered Services:1 - Phone Line2 - High Speed Internet Connections (DSL/Cable/Sat)[1 - ISuite/Doc Lan : 1 - Gen Overhead Use]
General Leadership Info Board[IAP / Logistic Info Sheet]
![Page 3: ICP “Yurt” FOOTPRINT M CC M2 F Meeting Tent P IMET FBAN SITL MISC Map Table OC OPS / AIR / SAFETY IC COPY MISC DOCL Supply Cache GIS Ordering COMMOIC/Dep](https://reader036.vdocuments.us/reader036/viewer/2022080917/56649ec05503460f94bcc4a9/html5/thumbnails/3.jpg)
START FROM SCRATCH ICPThe objective of this diagram is to provide IT Equipment Access Using Kit PCs and Peripherals until Rental Equipment and/or “Yurts” are available.
Computer RoomOn Wheels
CROW
3 – Kit PCs [Wireless]
PRT 2 ServersCTSPs
2 – Kit PCs [Wireless]
Clean PowerGenerator
GInternet AccessAir Cards or Limited Use Satellite(s)
Check In / Time
PLANS / Misc
FF / Visitor Traffic Pattern
Table & 2 Folding Chairs
Table & 3 Camp Chairs
Awning Deployment Optional
DRAFTPlease Provide
Your Input
Setup Order:1)Stop Truck2)Open CROW3)Pull Power Box4)Open Truck Canopy / Start Generator5)Connect Clean Server Power & Internet Café Power Cords6)Turn on UPSs / Servers / TEAM3CROW Printer7)Setup Tables / Folding Chairs8)Setup 5 Kit Laptops via Wireless9)Deploy Awnings10)Restore / Attach / Build I-Suite DB11)Test Laptop Connections12)Fine Tune Setup / Level Crow / Disconnect From Truck / Etc.
GOAL: Setup for 1st 24 hrConfiguration w/in
30-60 minutesAssuming Access to Existing I-Suite DB or Build New I-Suite DB
Full ICP Configuration Depends on Arrival of “Yurts” & Rental PCs
Last Revised09/16/10 0800