ICOB Fundraiser Banquet December 2019
Ibn Majah narrated that `Umar bin Al-Khattab, may Allah be pleased with him, said; "The Messenger of Allah said:
تا ف النة هلل بن هلل ه ب من بن مسجدا يذكر فيه اسم ي (Whoever builds a Masjid in which the Name of Allah is
remembered, Allah will build for him a house in Paradise.)
Program
5:00 PM Maghrib Prayer5:45 PM Quran Recitation Check In5:50 PM
Our Legacy – Sh. Abdirahman6:00 PM
Dinner6:05 PM Imam Joban6:10 PM Sh. Jamal
6:15 PM
Banquet Dinner6:30 PM
Science/Lego/Crafts/Games6:45 PM Board Presentation7:10 PM Sh. Yahya
7:30 PM Fundraiser – Imam Fazal
8:40 Isha Prayer – Closing Dua
• Moved to Woodinville - June 2019• Moved to Bothell downtown - Nov
2019• Satellite locations:
• Friday Jumma• Pre school• Weekend School
Activities:• School Events• Community Events • Interfaith Events
• Mohamed Elmohandes
• Mohamed Odah
• Harris Thamby
• Sr. Huma Siddiqui
• Ahmed Hassounah
• Ahmed Idrees
• Jafar Sadiq Syed
Current Board
Non Voting Advisors:
• Azmath Khan
• Rami Alkabra
• Yusuf Ali
Construction Update
Current Facility
Existing Facility
Existing: 5,200 sfParking: 42 stalls
New Facility
Move Farmhouse and new basement
New Community Center3 level building
Farmhouse: 7,000 sfNew Building: 27,000 sfTotal Parking: 70 stalls
NEW FACILITY3 – Floors
18 parking stalls
• Permanent masjid• 3000 sf• Wudu facility• Dedicated area for sisters• Prayer space:
• ~ 210 bothers• ~ 70 sisters• 20 to 30 overflow• + existing space
Previous Basement →Main FloorPrevious Main level → Second Floor
Farmhouse New Main Floor
Farmhouse Second Floor Updates
• Use Musalla space For School During Construction
• Add Second Bathroom
• Reconfigure Kitching & Add Additional Classroom
1st FloorParking/Play/Kitchen
2nd FloorAcademy Classrooms
3rd FloorMulti-Purpose Halls
New Building
• Completed by April 2019:✓City of Bothell Permit✓General Contractor Engaged✓Demolition and Cleanup✓Footing and Foundation Excavation✓Relocation Sub-Contractor Appointed✓Geotech Approval ✓Special Foundation Inspection ✓City Of Bothell Foundation Inspection✓Foundation Concrete Poured
Farmhouse Progress Update• Completed Since April 2019:✓Underground Plumbing✓Foundation Walls✓Dismantle Electrical, Gas, Plumbing,
Fire etc.✓Vacate Farmhouse✓Re-locate Farmhouse✓Backfill and Pour Concrete Slab✓Demolish & Cleanup Old Basement✓East Side Sewer Retention System✓Update Level 2 Floorplan✓Community Building Footing &
Foundation Excavation
• In Progress 2019:➢Farmhouse Framing➢East Side Sewer Retention System➢Implement Level 2 Floorplan Changes➢Establish Required Easement with
NSD Connecting To Second Main Waterline➢Roadway & Parking Lot to Subgrade
Level
Farmhouse Progress Update• To Be Completed 2020:➢Farmhouse Insulation and Drywalls➢Farmhouse Paint Interior and Exterior➢Prepare Community building Footing
Foundation ➢City Community building Foundation
Inspection➢Foundation Concrete Poured ➢Replace Farmhouse Roof Tiles➢Connect To Second Waterline➢Landscaping➢Farmhouse Occupancy Permit➢Complete Community Building
Month Activities Status
January – 2019 City permits Completed
Finalize Contract with Building Contractor Completed
Locate interim facility Completed
February – 2019 Start Construction – Break ground Completed
Move to interim facility and vacate current facility Completed
June – 2019 Relocate the Farmhouse Completed
January – 2020 Complete New Community Building Footing Foundation In progress
April – 2020 Complete Farmhouse – Occupancy In progress
June – 2020 Complete Community Building Shell (Frame, roof, etc.) Not Started
TBD Complete new Community Building Not Started
Construction Project Milestones
Interim Facilities• Daily Prayers & Halaqas:
• 10027 Main Street Bothell
• Jummah:• Bothell United Methodist Church
• 18515 92nd Ave NE, Bothell, WA 98011
• Pre-School:• 19200 Hollyhills Dr NE, Bothell, WA 98011
• 19200 Hollyhills Dr NE, Bothell, WA 98011