Foundation in Natural and Built Environment  08/14

Introduction To The Construction Industry

(QSB30105)

Final Project

­Proposal of a Commercial Area ­

Name: Terence Tan Peng Ong & Yong Man Kit Student ID : 0320275 & 0319778

Tutor  : Ms Ann See Peng

SUBMISSION DATE :18th Nov 2014

Introduction

Page 2: ICI.pdf

 

In this Introduction to Construction Industry project, we were asked to find a 

specific empty land to initiate a small construction project. The size of the 

land must be around 900 square meters to 1200 square meters. We had 

been given some purposes for our proposal. For example, recreation area, 

commercial area, industrial area, agricultural area, tourism area and 

residential area. We had chosen our site which is located at Jalan Desa 

Budiman, Bandar Sungai Long, Kajang, Selangor. 

Purpose

   The purpose of this project is to let us feel what it is like to be a city 

planner, as well as testing our creativity. It also helps reflect our 

personalities, whether if we care about the nature or we are a selfish bunch 

of student. Beside that, it also let us learn mroe about the construction 

industry, because we have to do research on how to propose our concept.

Concept

Page 3: ICI.pdf

    This area had been neglected for quite a long time so we decided to use this area for our final project. The area that we had chosen is 934.84 m² big 

and it is big enough to build a fast food restaurant.

Page 4: ICI.pdf

The concept is a 4­storey, multi­restaurant building, with the ground 

floor being the Car park, Mcdonald’s in the 2nd floor, KFC in the 3rd floor 

and Domino in the highest floor. Due to the small size of our site, we 

decided to put the car park at the ground floor as we do not have to 

dedicate a specific area for car park, which is impossible. 

The multi­restaurant concept is to provide more variety for the 

residents nearby, which a drive­thru located at the 2nd floor Mcdonalds’. In 

order to pull off this 2nd floor drive­thru concept, we designed a “bridge” 

where the drivers can go up and drive­thru, and underneath the bridge is 

the entrance to the car park.

The building consists many gigantic glass pane to provide a modern 

look as well as allowing natural sunlight into the building. By doing this, less 

energy will be used to light up the building during the day, thus making this 

building a green building.

We also decided to plant grass, as well as palm trees alongside the 

road in front of the building. This creates a contrast between technology 

and natural, providing a good scenery for the customers inside the building. 

It also helps counterbalance the amount of carbon dioxide emitted from the 

vehicles.

However, due to it being a restaurant, littering will be inevitable, 

because you know, Malaysians. But, one way to solve this problem is to put 

Page 5: ICI.pdf

trash cans everywhere around the building. Another way is just hired some 

cleaners to clean up the rubbish every now and then.

Why we choose McDonalds’ ?

The nearest McDonalds’ from our site is a distance of 8.1 km. It takes 

you 17 minutes of drive to there, assuming the traffic isn’t bad as always. It 

is very inconvenient for the residents of Jalan Desa Budiman. 

 Therefore, McDonalds’ is one of the good choices to be proposed in 

this project. Since our site is surrounded by residential area, there will be a 

lot of students living there. McDonalds’ is also a nice place to chill and 

some students also can study at McDonalds’ because McDonalds’ will 

provides a good environment to relax and study.

 Beside that, it also provides fast and easy food for the busy ones, 

because nowadays, the people would rather starve their tummy just to earn 

money. That’s even more unhealthier than eating junk food!

Page 6: ICI.pdf

Moreover, the location is very suitable for a drive­thru restaurant as 

it’s a cross junction. This means that the street will be always busy, which 

in turn means that the restaurants will get a tons of customers everyday. 

Site Plan

Our Site At Jalan Desa Budiman, Bandar Sungai Long,Kajang Selangor.

Page 7: ICI.pdf

Front View 

Side View

Page 8: ICI.pdf

Site Context

YELLOW = Residential Area

RED = Our Site

Residential Area at Jalan Desa Budiman

Page 9: ICI.pdf

Site Analysis

  Introduction to our site

Page 10: ICI.pdf

Our site is surrounded by residential area and has a big space for 

parking in case there are too many cars want to come here. The 

environment of our site is quiet so residents can just chill at the fast 

food tower that we propose. The residents can reach our site easily 

as it is nearby the residential area.

Advantages

● Near to residential area.  ● At the side of the junctions, good geography. ● Easy to reach  ● Open Space ● Green Spaces 

Disadvantages

● Wasted Area. ● Hilly. ● There is no way to exit to the main road. ● Not shady. ● There is not safe because there is not guard house nearby. 

Improvement

● Make a way to the junctions. ● Mini guard house created at the site. ● Provide more shade. ● Make it to a better place to chill and relax. ● Add in some decorations. ● More plants planted at the hilly area. 

Page 11: ICI.pdf

 

Elements

Landscape:

Grass Turf Cost of lawn installation and maintenance

Installation costs per square foot:

● Hydroseed: $.50­1.00

● Sod: $3.50

● Artificial turf: $8­$12

● Backyard putting greens: $14

● Sprinkler systems for turf: $2

Maintenance costs:

Page 12: ICI.pdf

● Mowing and edging: $30­$40 per visit for small suburban lots

● Aeration and overseeding: $40­$60 per 1000 square feet

● Fertilizing and weed control: $60 for an average application

Palm Tree

Page 13: ICI.pdf
Page 14: ICI.pdf

Equipment:

Full Series Luxury Catering Equipment fast food kitchen equipment FOB Price: US $1,200 ­ 1,500 / Set 

Min.Order 

Quantity: 1 Set/Sets fast food kitchen equipment

Supply 

Ability: 5000 Set/Sets per Month

Port: HUANGPU

Payment 

Terms: T/T,Western Union

Page 15: ICI.pdf

Square high  quality 

KFC, 

Starbuck,Buffet, Mcdonald's Long dining Restaurant dining table set

FOB Price: US $40 ­ 300 / Piece 

Min.Order 

Quantity: 50 Piece/Pieces

Supply Ability: 1000 Piece/Pieces per Month

Port: Shenzhen

Payment Terms: T/T,Western Union

APPLICATION FOR PLAN APPROVAL 

PROCEDURE (RESIDENTIAL / 

COMMERCIAL /INSTITUTIONAL)

BUILDING PLAN APPROVAL APPLICATION 

Page 16: ICI.pdf

Building Department Nilai Council

Building Definition : 

By Act 133, the Street, Drainage and Building, part 1 of section 3, 'The 

building includes a house, hut, shed or roofed enclosure, whether 

used for residential or otherwise such as wall, fence, platform, stage, 

dendeng board, lancer place, dock, wharf, pier, jetty, landing stage or 

bridge or any structure or foundation associated with the above 

'Construct a building without prior written permission of the Council is a nd 

offence and a fine of up to 20 X Payment for processing plan [ACT 133 

STREET, DRAINAGE AND BUILDING 1976, 

SECTION (70) SUB 13 & 14].

PLAN APPROVAL PROCEDURE (RESIDENTIAL / COMMERCIAL /INSTITUTIONAL)

Each application have to attach with below documents:

1. Application letter signed by the applicant’s Architect / Engineer

2. Form A (Certificate of building plan/structure).

3. Copy of Architects / Engineers Registration Certificate 

4. Copies of Company Registration, MAA Form and Form 49. 

Page 17: ICI.pdf

5. Official Search Certificate / documents relevant to land ownership.

6. Copy of premium.

7. Copies of the land tax and assessment tax receipt.

8. Copy of the Planning Permission Approval.

9. Copy of the Infrastructural and Earthworks Application Letter to the Engineering 

Department of MPN.

10. Verification form for the use of local construction materials.

11. Plan processing fees inclusive of the plan processing calculation form. 

12. Cleanliness Deposit payment of RM 500.00 an acre based on the development area.DEPARTMENT OF TECHNICAL 

REQUIREMENTS

The building plans which have been certified by the appointed 

Architect / Engineer must be submitted together with the application 

letter to the Internal and External Technical 

Department through Local Centre (OSC).

INTERNAL TECHNICAL DEPARTMENT 

1. Building Department ­ 3 sets (1 linen)

Page 18: ICI.pdf

(The plans submitted to the Building Department should include 

Appendix A )

2. Engineering Department­ 4 sets (1 linen)

(Please refer to the checklist of the Engineering Department)

3. City Planning Department­ 1 set (paper)

4. Landscape Department­ 1 set (paper)

EXTERNAL TECHNICAL DEPARTMENT

1. Fire Department

2. Water Supply Department

3. Tenaga Nasional Berhad

4. Telecommunication Company

5. Indah Water Konsortium

Page 19: ICI.pdf

The flow chart

 

Page 20: ICI.pdf

Costing of the project

Item Description Unit Qty Amount (RM)

Concrete Strong supportive material kg 20k 50000

Steel Strong supportive material kg 10k 100000

Glass Beautiful piece of material m²  5k 10000

Ceramic Tiles

Beautiful piece of material m² 5k 25000

Cement Base material m3 20k

Palm Tree

Softscape   no.   12 180

Lawn Grass

Softscape m² 100 15000

Lighting Equipment no. 50   5000

Table set Equipment no. 45 6750

Kitchen Set

Equipment no. 3   10800

Fridge Equipment no. 18 90000

Trash can Equipment no. 100 2000

Page 21: ICI.pdf

Soft Drinks

Dispenser

Equipment no. 6 6000

Toilet set Equipment no. 6 60000

Counter set

Equipment no. 3 3000

Dining Set

Equipment no. 200 4000

Conclusion

Page 22: ICI.pdf

   After doing this project, we understand of the building 

team, its organization, duties and inter­relations. Besides 

that, we are also have the ability to justify the feasibility of a 

development and improve the proposal to serve the 

purpose of the development.

 

   In addition, my teammate and I are getting better in 

teamwork. We helped each other and finally managed to 

finish our work successfully on time.