Ice Bridge Data Management
Scope, Challenges, SolutionsRon Weaver, NSIDC DAAC Manager
National Snow and Ice Data CenterSupporting Cryospheric Research Since 1976
IceBridge Data Management. September 20092
Topics
• Vision, Guiding Principles• Science Goals• Data Management Goals
In Response to Science Goals• Proposed Activities• Schedule• Challenges• Questions• Next Steps
IceBridge Data Management. September 20094
Science Goals - IceBridge
• Ice Sheet Surface elevation data after ICESat-1 mission ends Areas of rapid ice sheet change, Sea ice mass estimates
• Computed measurements critical to ice models Bed topography, grounding lines, ice and snow thickness
• Link ICESat-1 to ICESat-2 through baseline inter-calibration measurements
• Campaigns to support sea ice (thickness, type, extent)• Technology incubator and test-bed
Airborne and satellite sensors, UAV, photon counting, cross-track measurements
IceBridge Data Management. September 20095
Data System (at NSIDC) Goals
1. Data system supports science goals and user needs
2. Provide appropriate and adaptable data services and tools for these data
3. Provide (and/or promote) understandable, accessible, and relevant data products to broader science community
4. Manage data sets from IceBridge, ICESat-1 and WFF ATM (via funded ACCESS project) in a coherent and interoperable manner
5. Prototype the ICESat-2 data system6. Data Stewardship
Data Types
L0
L1
L2
L3
LidarsATM GLAS LVIS UAF
LiDARIce Radars
PARIS KU-IceKu-Snow ……Gravity Magnetics
Profiles/SwathPoints - Waveforms
Point cloud
Waveform
DEM DEMsurface
Profiles/SwathReturn Energy -
Waveforms
Ice in-situlayers
SnowAccum.
DEMbed
profiles profiles
GravityPotentialsurface
AeromagPotentialsurface
Surface mapsSea ice – ice sheets
Ice sheet roughness
External Products and ServicesAg
greg
ation
Ser
vice
sModels
Dat
a Pr
oces
sing
Lev
els
Services Data CastingsTools
USERS
ICECAP
ICECAP LDEO
Task Sequencing – After Preliminary Discussions With NASA HQ
ESTABLISH OIB PROJECT TEAM•Coordinate DAAC OIB data mgmt. activities at NSIDC•Coordinate NSIDC activities with:
• Science team• Instrument teams• ESDIS and HQ
CONDUCT DATA ASSESSMENT•Establish OIB initial baseline data list•Characterize existing data formats, metadata processes, services, etc.•Determine initial LOS for all OIB data sets•Assess tools and services needed by OIB Science and Instrument Teams and User Community•Provide NASA HQ with work plan with cost estimates for remaining work
BROKER OIB DATA SETS•Metadata entries in NSIDC data catalog with LOS designated•Collect/extract/reformat documentation and metadata•Metadata entries transferred to ECHO and GCMD
ESTABLISH LIST OF DATA FOR INGEST AT NSIDC
•Determine LOS and resources needed for transfer•Negotiate agreements with Instrument Team(s)•Determine transfer phasing
EXTEND TOOLS AND SERVICES TO DATA AND PRODUCTS
•Determine phasing of development efforts
IMPLEMENT OIB DATA PORTAL•Rapidly implement focused entry point for OIB data and services•From metadata entries in NSIDC and ECHO data catalogs with LOS designated•Reuse/Augment SearchLight, CCAWS/SAGE technologies
IMPROVE INSTRUMENT TEAM DATA MANAGEMENT PRACTICES
•Consult with Instrument Teams
IMPLEMENT DATA AGGREGATION SERVICES
INGEST DATA INTO NSIDC VO OR ECS SYSTEMS
•Phased ingest based on established priority
A C
D
E
F
H
I
G
B
PROVIDE APPROPRIATE DATA PRODUCTS DERIVED FROM
INGEST DATA STREAMS
Current NSIDC Schematic Architecture
Ingest Paths Archival SystemsData & Metadata
Production Interfaces & GUIs
Services
EOS Satellite Data
V0 Ingest Paths
PDR Server
PMIngest
SearchlightIngest (TBD)
PMProduction
Manual Ingest
WIST
DPInterface
Machine to machine
Sub setters
DataPool SAN
ECS
ECHO
V0 SAN
V0 MDDB (to be replaced)
SearchLight
OIB Portal
Legacy GUIs
SAGE CCAWS
GUI
Service Casting
SLight GUI
Lines indicate data and metadata flowsDotted outlines are functions under developmentGrayed out items are to be replacedRose colored items are proposed
IceBridge Data Management. September 200914
Schedule• HQ decision on NSIDC Proposal (November?)
scope, level of effort, schedule• NSIDC appoint a project leader and identify team
members (January?) (Proj Mgr, scientist, USO, OPS, Engr) probably aggregate 1-1.5 fte level of effort
• Implement approved tasks Work on integrated data products ?Conduct Data Assessment (prelim report March
2010?)
• Iterate with NASA over requirements
IceBridge Data Management. September 200915
Challenges• Timeliness Of Data Delivery• Understanding And Responding To User Community Needs• Complexity Of Data Streams, Especially Experimental
Instrumentation Changing Formats Of Experimental Data Dataset Co-registration
• Appropriate Data Set And System Integration Develop Tools And Services To Fit Complex Data Or Adapt Complex Data To Known Tools And Services
• Distributed (Virtual?) Data Management Systems Who Holds What Data? Who Decides? How Does Interoperability
Get Accomplished?
Note That Archive Volume Is Not On This List
IceBridge Data Management. September 200918
It will use NSIDC’s SearchlightUSERS
JAZ
Struts 2 Action Objects(controller)
WCS Service
ExternalDatabase
MetadataDatabase
JPA Hibernate
ECSFile System
ECHOMetadata
NSIDC FileSystem
Service Objects
Repository Objects
Domain Objects
BrokeredDatabase
Workflow Objects
WMS Service WFS Service
Analysis Objects
CCAWS UIG-CAP OGC UI
External Metadata
SearchLight JSP Pages(view)
OPeNDAP ServerOther Systems
AJAX Libraries (DOJO, YUI)
SearchLight
CCAWS
G-CAPUser Interface Layer
Service Layer
Domain (model) Layer
Infrastructure Layer
Other Systems
Core Software Architecture