ic-enc ic-enc became operational in july 2002. it is one of the 2 rencs created after the break-up...

17

Upload: kasandra-dane

Post on 31-Mar-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were
Page 2: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

IC-ENC• IC-ENC became operational in July

2002.• It is one of the 2 RENCs created

after the break-up of the original PRIMAR.

• The PRIMAR member HOs were presented with 2, very different, alternative RENC models.

Page 3: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

Description of IC-ENC• A RENC in accordance with WEND Principles.• An organisation created and controlled by its

members and operated for them by the UKHO.• A low cost, “Not for Profit” organisation. • A cost effective distribution system through

Value Added Resellers. No direct end user service.

• Promotes the “One Stop Shop” concept.• Simple IT infrastructure.• Centre of excellence. Emphasis on data QA

and consistency.

Page 4: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

MissionTo deliver to its members a cost-effective service designed to meet the needs of the users by providing high quality, fit-for-purpose ENCs that comply with IMO and IHO standards, and which are delivered to users within integrated and user friendly ENC services.

Page 5: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

Co-operating Nations

• Belgium• Bahrain• Germany• Greece• India• Netherlands

• Portugal• (Russia)• South Africa• Spain• Turkey• UK

Page 6: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

STRUCTURE

Bilateral Arrangement with the Service

ProviderIC-ENC OFFICE (5 staff)

VAR 1 VAR 2 VAR 3 VAR n

HYDROGRAPHIC OFFICES

Cooperation Arrangement

Steering Committee

IC-ENC

Technical WG

Commercial WG

UKHO

Page 7: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

Staffing

Business Manager

Graham Saundercock

Guest ValidatorCHO Representative

ValidatorJim Nicol

ValidatorGraham Reeks

ValidatorMike Hawes

Data Manager

Mike Bisset

Steering Committee Chairman

IC-ENCOffice

Page 8: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

MAIN FUNCTIONS

• Acquisition of ENCs from Members.• Quality Assurance of ENCs + updates:

– Validation tools error message assessment– ECDIS loading checks– Data consistency / usability checks

• Feedback and support for Members.• Database management.• VAR appointment and management. • Supply of ENCs to VARs.• Revenue collection.

Page 9: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

CooperatingHOs

DataManagement

Database

Ftp Site – Receipt ofEN and ER

ValidationdKart InspectorENC AnalyzerENC Designer

Manual ChecksECDIS Checks

VARs

Data Flow Within IC-ENC

Data Flow Within IC-ENC

Archive

Page 10: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

ISO 9001:2000 Certification upgraded 18 December 2002

Page 11: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

Data on 23rd July 2004

663 Cells Available Week 30/2004

0

50

100

150

200

250

300

350

400

450

EN Cell totals 2 47 88 403 54 24 41 4

BE DE ES GB GR NL PT ZA

Page 12: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

www.ic-enc.org

Page 13: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were
Page 14: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

Cells and Units

• Cell sizes vary.• Could lead to differential pricing.• Mariner is familiar and happy with

the “Paper Chart” in terms of:– Coverage– Value for money

• IC-ENC therefore groups cells into paper chart equivalent Units.

Page 15: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

Pricing • IC-ENC is operated on a “not for profit” basis.

• Operational costs are funded through a deferred cost recovery mechanism.

• IC-ENC retains a fixed amount for each ENC unit that it sells to its VARs.

• This fee is capped at $5, so an HO that sets a wholesale price of $12 will receive $7 for each sale that a VAR makes.

Page 16: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were

VAR Status

6 VARs now appointed:

– UKHO (Admiralty) (July ’02)– C-Map (May ’03)– 7Cs (Chartworld) (June ’03)– Transas (June ’04)– NHS (PRIMAR-Stavanger) (June ’04)– Kelvin Hughes (July ’04)

Page 17: IC-ENC IC-ENC became operational in July 2002. It is one of the 2 RENCs created after the break-up of the original PRIMAR. The PRIMAR member HOs were