Operations & Maintenance OptimizationOperations & Maintenance Optimizationfor Smart Grids using CIM.for Smart Grids using CIM.
Laurent Schmitt, Alstom Grid, VP Smart Grid SolutionsFrédéric Bauchot, IBM, Chief Architect E&U Solutions Center
- , ,
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
2/11
Alstom & IBM: two major actors of Smart GridAt IBM, we are:
Accelerating the adoption of SG worldwidethrough the Global Intelligent Utility NetworkCoalition.
Aiding utilities in the development of SG bycreating the Smart Grid Maturity Model.
Collaborating in the GridWise Alliance and similarorganizations around the world to promote SG
Participating in the DoE Advisory Committee and
At AG, we are :
Contributing to Smart Grids standardization
convergence efforts worldwide
A world leader in critical Grid Power Electronics,Automation & Control Room IT
Participating to several demonstration projectsacross the world . .
electric system
Exploring how to turn millions of electric vehiclesinto a distributed storage system.
Delivering SG solutions around the world:
Want to make Smart Grid a reality today
Are sharing a Joint IT architecture with IBM SAFE
C DC DC DC D
P P P P
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
3/11
Need to accelerate Standardisation Convergence
TC8Electrical Systems
TC17HV/MV Equipments
TC69Electrical Vehicule
TC205PV Converters
T&D Europe
ETSI
EuropeanCommission
ENTSOe
EFET
ERGEGCEN/Cenelec
JTC1Joint Techical
Commitee
TC65Process Control
TC205Home Automation
TC247Building Automation
Organlime
Eurelectric
GridwiseAlliance
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
4/11
Good CIM Adoption in Europe / Transmission Utilities
First IEC-ETSO Meeting (Market) April 2006
Beginning of CIM ETSO Convergence March 2007
Issue of first draft CME Europe ETSO Profile June 2007
First IEC-UCTE Meeting (Load flow) April 2008
Acce tance b UCTE to oin IEC a roach June 2008
P P P P
S S S S
FFFF
P P P P
TODA
CIM A CIM A CIM A CIM A
CIMCIMCIMCIM
Paper at next CIGRE D2-C5 September 2008
Finalisation of New Work Item Proposal October 2008
Interop test – UCTE Model Exchange March 2009
Official ENTSO-E adoption December 2009
Interop Test March 2011
S S S S
IIII
C C C C
E E E E
UCTE UCTE UCTE UCTE
MMMM
E E E E
IIII
TODA
Convergence methodology established and demonstrated
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
5/11
IBM / Alstom Grid joint Value Proposition
Customer Issues
Increasing operational challenges related to themanagement of their network assets
Optimizing the use of current assets
Maintaining and replacing ageing assets
Managing the aging workforce and knowledge retention
Improving responsiveness to outages and customercomplaints
High cost due to equipment failure andmaintenance
Benefits for Transmission and DistributionUtilities
Business process improvements
Increase consistency and integration betweenbusiness processes
Enforce safety rules
Improve data management scheme
Improve visibility
5
Key Features of joint approach
Combine Alstom Grid state-of-the art solutions incondition monitoring and grid management withIBM best-in-class asset management solutions
Lever the available condition monitoring data to improvegrid operations and asset management
Optimize grid operations and asset management byexchanging information between both systems
Work jointly with the utilities to design most valuable usecases
Operations efficiency
Reduce the number of unplanned outages andminimize the impact of all outages
Maximize the use of assets (push to the limits)
Financial gain
CAPEX reduction: a few percents improvementrepresent a huge saving for TSO
OPEX and inventories reduction thanks tooptimized maintenance
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
6/11
Reference Smart Grid Architecture
IIIIN A L D E N A L D E N A L D E N A L D E
R M DE R MS R M DE R MS R M DE R MS R M DE R MS
G MG MG MG M
C RC RC RC R
E MS E MS E MS E MS DMS DMS DMS DMS MMS MMS MMS MMS
E E E E
C IMC IMC IMC IM
IIII
6
S S S S
DDDD E MS E MS E MS E MS
E GE GE GE G
S MS MS MS M
GGGG
DDDD E MS E MS E MS E MS
B B B B
DDDD E MS E MS E MS E MS
DDDD
DDDD E MS E MS E MS E MS
M E MS M E MS M E MS M E MS
E E MS E E MS E E MS E E MS
C C C C
A A A A
E E C E E C E E C E E C
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
7/11
SAFE/IUN Conceptual Solution Architecture
OperationalMonitoring and Security
Analytics Engine
Geo-spatial DataMining
Statistics/KPIs
Third party Apps
Complex EventProcessing
Correlation Reporting/Workflow
Portals
Grid Applications
Asset Mgt
Remote Asset Mtrg.
Remote Device Mgt
Planning
Enterprise Content Mgt
Mobile Workforce
IEC CIM Data
Warehouse – DB2 Pure XML
Distribution M t S stems
OperationalMonitoring
& Security
Informed Decision Making
Enterprise Service Bus
ETL service
MaximoEAM
WebSphere ESB
7 IBM Confidential
Line mounted
sensors
Field ForceSubstation (IED relays, servers, video,
security, local weather, Comm
Equipment
sensors
Smart
metering
E S B
Data Historian
High-performance archiver
(Time-series data, SoE)
Complex EventProcessing,
High PerformanceAnalytics
Field Network
PHEVsDistributed
Generation
Local Intelligence
Outage Management
Demand Side Mgt.
State Estimator
Power Systems Simulator
SCADA, DCS, PLC
GIS
AMM
OperationalMonitoring and Security
OperationalMonitoring and Security
Time-Dependent Operations Middleware (WebSphere Real Time, MQ Low Latency)
SG Asset
e-terraplatform
e- erra
EMS-DMS
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
8/11
Solution Architecture Overview
Network Operations
Asset & Work Mgmt
8
(*) IEC 61970 / 61968
IBM Maximo EAMAlstom Grid e-terra DMS/EMSWebSphere ESB
CIM (*)
CIMCIM CIMCIM
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
9/11
How EAM can be used to improve Grid Operations
Use Case 1: A Transformer Buchholz Alarm is raised at SCADA level
Operator has to decide whether the Transformer needs to be put out of Service or not
Grid Operations Work & Asset
Operations
Request
Information
RequestWork
Tag
Benefits :- Optimized Reaction to abnormal Conditions
- Reduced Outages- Lower operational Cost- Consistent and up-to-date Information across
Grid Operations and EAMDemonstration
24
3
9
Mobile Field Force
Alarm
equence :
1. A Transformer Alarm is reported2. Operator retrieves Work History, planned
Work and/or Asset Information from EAM3. Operator decides to de-energize the
Transformer and to request Work into EAM4. A Tag with Work Order Information is placed
on DMS/EMS screen5. Maintenance is carried out6. EAM notifies DMS/EMS on ongoing Work
progresses7. DMS/EMS generates an Alarm when Work is
completed.
8. Operator re-energize the Transformer
Work UpdateCompleted !
AssignWork
Work
Update
Re-energize
De-energize
1
3
5
6
7
8
-
8/19/2019 IBM Alstom OperationsandMaintenanceOptimization
10/11
10
Demonstration is available at the IBMLa Gaude E&U Solutions Center
-