ibl co 2 c ooling lines installation review
DESCRIPTION
IBL CO 2 c ooling lines installation Review. Didier Laporte CNRS – LPNHE Paris 11 mars 2014. 6. 5. 1. 2. 3. 4. This scenario is about the side A. 7. 8. 2. 3. 4. 5. 1. 6. 7. 8. Guiding support. Support plate. Bottom of the splitter box. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/1.jpg)
1
IBL CO2 cooling lines installation
Review
Didier LaporteCNRS – LPNHE Paris
11 mars 2014
![Page 2: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/2.jpg)
2
1
324
8
6
5
7
132
4
8
6 5
7
• This scenario is about the side A
![Page 3: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/3.jpg)
3
Bottom of the splitter box
Guiding support
Support plate
Place and fasten the splitting box on the welding stand
![Page 4: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/4.jpg)
4
PP1 welding area
Intlet-outlet junctionFemale fitting
Position block
![Page 5: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/5.jpg)
5
Place the isolator/fitting assembly and Tighten by hand the fitting nut on to the corresponding fake female fitting
![Page 6: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/6.jpg)
6
Place the first f18mm flexible line and fasten it on the splitting box
![Page 7: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/7.jpg)
7
Put the A1 liquid line in place
![Page 8: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/8.jpg)
8Weld the lower connection
A1 liquid line
![Page 9: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/9.jpg)
9Weld the upper connection
A1 liquid line
![Page 10: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/10.jpg)
10Same operations for the A1 vapor line
![Page 11: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/11.jpg)
11Transfer to the installation tool
A1 line completed
![Page 12: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/12.jpg)
12Fix the A1 line on the tool
Cover
![Page 13: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/13.jpg)
13
Same operations for the 4 double linesA1 to A4
![Page 14: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/14.jpg)
14Hold the fitting cone
![Page 15: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/15.jpg)
15Close the splitter box
![Page 16: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/16.jpg)
16
Close the tooling with the cover and lock it
The tooling is ready for the installation
![Page 17: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/17.jpg)
17
In the pit
![Page 18: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/18.jpg)
18Installation tooling
![Page 19: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/19.jpg)
19
• LPSC table
Ready to receive 8 lines tool
![Page 20: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/20.jpg)
20
Unwind the lines on to the floor
![Page 21: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/21.jpg)
218 lines set installation on the main frame
![Page 22: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/22.jpg)
22Remove the back cover and the fitting protection
![Page 23: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/23.jpg)
23
Shift the assembly until the splitting box back face touch the plate
![Page 24: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/24.jpg)
24
Unlock line 2x2 and tighten the fitting nuts by hand
![Page 25: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/25.jpg)
25Remove the assembly set
![Page 26: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/26.jpg)
26
And after
• Same operations for 6 lines side A
• Same operations for 8 lines side C
• Same operations for 6 lines side C
![Page 27: IBL CO 2 c ooling lines installation Review](https://reader033.vdocuments.us/reader033/viewer/2022051219/56815f3e550346895dce113b/html5/thumbnails/27.jpg)
27
Planning
• Welding stand,• Installation tooling, • Z table,• Main frame
Delivery 18/03/2014